Loading...
CM-13-02-032ROUND ROCK, TEXAS PURPOSE PASSION PROSPERIIY Item Caption: Cot- (3-02-032 RECEIVED JAN 3 01013 City Manager Approval Form Consider issuing a Purchase Order to T. F. Harper & Associates for the installation of poured -in-place rubber at Rock 'N River Family Aquatic Center. Approval Date: February 1, 2013 Department Name: Parks and Recreation Department Project Manager: David Buzzell, Park Development Manager Assigned Attorney: J. Kay Gayle Item Summary: This BuyBoard purchase order is for the installation of approximately 3,595 sq. ft. of poured -in-place rubber surfacing at the Rock 'N River Family Aquatic Center. The existing poured -in-place rubber is six years old and has started to deteriorate beyond repair. City staff will demo the existing poured -in-place rubber and T. F. Harper & Associates will furnish and install the new poured -in-place rubber. This project was identified in Year 3 of the PARD Repair and Replacement Program. No. of Originals Submitted: 1 Project Name: PARD Repair & Replacement Program Year 3 Project Cost: $28,696.00 Source of Funds: General Self -Financed Construction Source of Funds (if applicable): Select Source Fund Account Number: Finance Director Approval: Cheryl Delaney Date: 1/30/13 Department Director Approval: 4 Date: **Electronic signature by the Director is acceptable. Please only submit ONE approval form per item. ** CIP h n Budget N/A OK I✓I N/A OK Purchasing ❑ N/A OK Accounting o❑ N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 QUOTE #: DATE REVISED: REVISED: mharzr associa es LP BUYBOARD QUOTE TO: City of Round Rock Attn: Drew Chatman Address: 301 W. Bagdad St, Ste 250, Round Rock, Texas 78664 Install Site: 3300 Palm Valley Blvd, Round Rock, Texas 78664 Phone: 512-218-5540 Fax: 512-218-7097 Email: dchatman(a7roundrocktexas.Qov QTY 2,565 1,030 NOTE: CONTRACT #346-10 FOR PURCHASE THRU BUYBOARD PLEASE FAX YOUR PURCHASE ORDER AND SIGNED QUOTE TO BUYBOARD AND T.F. HARPER & ASSOCIATES LP TO INSURE COMPLIANCE & RECEIPT OF YOUR ORDER. Rock N River Pool Renovation - City of Round Rock DESCRIPTION OF EQUIPMENT S.F. Poured In Place Rubber, 1/2" Thick, Chlorine Resistant EPDM Alipahtic Play Surfacing, Color to be 50% Standard Blue/50% Black, Furnished and Installed at Beach Entry Pool S.F. Poured In Place Rubber, 1/2" Thick, Chlorine Resistant EPDM Alipahtic Play Surfacing, Color to be 50% Standard Blue/50% Black, Furnished and Installed at Baby Pool Finished Poured In Place Surfacing will be IPEMA Certified and meet all current ASTM, CPSC and ADA Guidelines for Playground Safety. Two Year Warranty on Material and Workmanship. TOTAL QUOTE IS VALID FOR 30 DAYS FROM DATE OF QUOTE OR FROM DATE OF REVISION. WATER MUST BE TURNED OFF AND REMOVED FROM PIP AREA NO LESS THAN 72 HOURS PRIOR TO SCHEDULED PIP RUBBER APPLICATION. EXISTING PIP REMOVAL, CLEANING/DRYING OF PIP AREA BY OTHERS. OVERNITE SECURITY BY OTHERS. SITE MUST BE ACCESSIBLE BY TRUCK. NOT INCLUDED: Sales Tax (RESALE OR EXEMPTION CERTIFICATE REQUIRED), Permits/Bonds/Fees (if required), Testing and Inspections, Site Work in Excess of Normal Installation (example: site prep - excavation/infill, concrete slab, french drains, excess rock removal). Any installation charges quoted are based upon a soil work site (not rocky) that is freely accessible by truck, no fencing. tree/landscaping or utility obstacles, etc.), and level (+/- 1-2% max slope). Any site work not expressly described is excluded. Landscape timbers are not warranted. All underground utilities must be located and clearly marked before any work can begin. Installation of all products (equipment, borders, ground cover, amenities) are as quoted and approved by acceptance of quote/drawings. The installer is not responsible for any damages or re -work resulting from after-hours events or activities during the work in progress period. The customer is responsible for maintaining the integrity of completed installation work until components have seated and/or cured (concrete footings. etc.). Payment Terms: 50% due with signed quote ($14,348.00) and balance due upon completion of work and receipt of invoice. Estimated Delivery & Installation: 3 to 6 weeks after receipt of order. 103 Red Bird Lane Austin, Texas 78745-3122 121312-03tb Skeeerilbe f_-..-__" I-3 January 18, 2013 UNIT PRICE TOTAL COST $20,304.00 $8,392.00 $28,696.00 Accepted by: Date: 4•0"i /moi P.O. # (if applicable): PLEASE ISSUE PURCH - E ORD R IN VENDOR NAME OF T.F. HARPER & ASSOCIATES. LP Thank you for giving us the opportunity to quote this equipment. Brian Roach, Sales Consultant pip rubber 011813.xlsx Cfr"(3-02-032 Commercial Play and Recreational Equipment www.tfharper.corn - - 800.976-0107 - - local: 512.440.0707 - - fax: 512.440.0736