Loading...
CM-13-02-035ROUND ROCK, TEXAS PURPOSE. PASSION PROSPERITY ( 2-03S RECEIVED City Manager Approval Form FEB o 7 mu Consider executing Supplemental Contract No. 4 with Huggins/Seiler & Associates, LP for the Mays Street Reconstruction Phase I Project. Item Caption: Approval Date: February 8, 2013 Department Name: Transportation Department Project Manager: Leah Coffman Assigned Attorney: Steve Sheets Item Summary: Mays Street Reconstruction Phase I provides for widening North Mays Street from a four lane arterial to a five lane section between the Brushy Creek Bridge and the Union Pacific Railroad/Lake Creek Bridge including the sidewalks, street trees and lighting; utility relocations; and gateway features. The engineering services contract consisted of a preliminary schematic, surface utility engineering, utility coordination, field surveying and mapping, land appraisal services, TCEQ coordination, and a 30% design schematic. Supplemental Contract No. 1 provided for surveying services not included in the original engineering services contract at a cost of $6,166. Supplemental Contract No. 2 provided for the development of complete plans, specifications, and PS & E from the approved 30% design schematic at a cost of $324,195. Supplemental Contract No. 3 provided for additional right-of-way appraisal, preparat pn of environmental documents, and final design plans at a cost of $64,699.40. Supplemental Contract No. 4 is asking for additional engineering services for design and detailing for illumination supports at the Brushy Creek Bridge, provide additional site verification at Bent 16 on the UPRR bridge, and detailing for a more complex gateway arch structure at a cost of $3,345. The total cost of the engineering services contract would be $634,044.40. No. of Originals Submitted: Two Project Name: Mays Street Reconstruction Cost: $3,345 Source of Funds: RR Trans Dev Corp Construction Source of Funds (if applicable): Select Source Fund Account Number: Finance Director Approval: Cheryl Delaney Date: 2/6/13 Department Director Approval: Gary Hudder Date: 2/4/13 `Electronic signature by the Director is acceptable, Please only submit ON approval form per item. CIP n Budget n n Purchasing n 11 Accounting111 N/A OK N/A OK N/A OK N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 4, STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 4 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HUGGINS/SEILER & ASSOCIATES, LP ("Engineer") ADDRESS: 116 East Main Street, Round Rock, TX 78664 PROJECT: Mays Street Reconstruction Phase 1 This Supplemental Contract No. 4 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Huggins/Seiler & Associates, LP, hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 10th day of November, 2011 for the Mays Street Reconstruction Phase I Project in the amount of $235,288.80; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on February 3, 2012 to amend the scope of services and to increase the compensation by $6,166.00 to a total of $241,454.80; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on April 26, 2012 to amend the scope of services and to increase the compensation by $324,195.00 to a total of $565,649.80; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on November 8, 2012 to amend the scope of services and to increase the compensation by $64,699.40 to a total of $630,349.20; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $3,345.00 to a total of $633,694.20; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Supplemental Contract 0199.7301; 00267400 I Rev.12/01 /08 84275 4. 11. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $3,345.00 the lump sum amount payable under the Contract for a total of $633,694.20, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. HUGGINS/SEIL i & ASSOCIATES, LP By: Iticq fns -31-13 Date CITY OF RO D RO AP By: SI -eve Norwood citvinkunag-fr Date 2-/0 eS-A3 Supplemental Contract 0199.7301; 00267400 2 OVED A` TO FORM: • Step ' an L Sheets, City Attorney Rev.12/0 1 /08 84275 ADDENDUM TO EXHIBIT B Engineering Services The work to be performed under this supplemental shall consist of providing additional engineering services for design and detailing for illumination supports at Brushy Creek Bridge, provide additional site verification and detailing for special condition at Bent 16 on the MPRR bridge which was not reflected on the as -built plans and allow for more extensive design and detailing for a more complex Gateway Arch structure. Addendum to Exhibit C Work Schedule 2012 2013 1 2014 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Fab Mar Apr May Jun Jul Aua Seo Oct Nov Dec i �H 1 1 11I iii w1 1 ■ ■ MII , ■ 5111 •1 ■ $ rl Authorization to begin W.A. No. 1 Total Project Time Environmental Document Preparation Prepare MUD Grant Environmental Documents Utility Coordination Assist City with Utility Mlustment required e S c S Iran o L E g S s Pu " c r90% Plan Review 100% Revisions and Submittal • paper copies onN Final ME Documents - Myler Copy Project Ready for Letting Addendum to Exhibit D Fee Schedule Task Total Labor Hours Total Loaded Labor Cost Other Direct Costs Subconsultants TOTALS Task 1: (e.g. surveying) 0 $ - $ - $ - $ - Task 2: (e.g. right of way appraisal) 0 $ - $ - $ - Task 3: (e.g. subsurface utility engineering) 0 $ - $ - $ - Task 4: (e.g. environmental document preparation) 0 $ - $ - $ - Task 5: (e.g. preliminary design/ 30% plans) 0 $ - $ - $ - $ - Task 6: (e.g. final design/ 60%, 90%, 100% plans) $ - $ - Task 7: (e.g. bid phase services) $ - $ - Task 8: (e.g. construction phase services) 0 $ - $ - $ 3,345.00 $ 3,345.00 Task 9: (e.g. project management) 0 $ - $ - $ - $ - GRAND TOTAL: 0 I $ - $ - $ 3,345.00 $ 3,345.00