CM-13-03-053ROUND ROCK, TEXAS PURPOSE PASSION. PROSPERITY Consider executing Supplemental Contract No. 3 with Atkins North Americas, Inc. for the Creek Bend Boulevard Project. Item Caption: Cik-13--o$-oS3 RECEIVED MAS ®7 City Manager Approval Form Approval Date: March 8, 2013 Department Name: Transportation Department Project Manager: Leah Coffman Assigned Attorney: Steve Sheets Item Summary: The Creek Bend Boulevard Extension project extends Creek Bend Boulevard from Creek Bend Circle to Wyoming Springs Drive and will provide a much needed creek crossing west of IH35. The proposed project was first approved by the City in 1999 as part of the Transportation Master Plan and was approved for funding in the 2001 bond election. The project has languished due to numerous obstacles and delays. The original engineering contract with Atkins North America, Inc. in the amount of $179,898.43 provided for a 30% design schematic. Supplemental Contract No. 1 consists of preparation of final (100%) Plans, Specifications, and Estimates (PS&E), bidding phase services, and construction phase services. Final PS&E will be developed from the approved 30% design schematic and will include supplemental design survey, right-of-way acquisition surveying services, environmental studies, roadway design, bridge design, water quality design, water line design, pedestrian/sidewalk improvements and utility relocations. The cost of Supplemental Contract No. 1 was $805,808.42. Supplemental Contract No. 2, at a cost of $21,570.57, amends the agreement to include additional services to study and define limits of the void encountered during geotechnical drilling. Supplemental Contract No. 3 provides for a geophysical study to assess the presence of voids and related features along the proposed Creek Bend Boulevard alignment from Station 23+25 to Station 27+25 at a cost of $49,900. The total cost of the construction contract would be $1,057,177.42. No. of Originals Submitted: Two Project Name: Creek Bend Boulevard Project Cost: $49,900 Source of Funds: RR Trans Dev Corp Construction El Source of Funds (if applicable): Select Source Fund Account Number: Finance Director Approval: LO for C. Delaney Date: 03-05-2013 Department Director Approval: Gary Hudder Date: 3/4/13 *Electronic signature by the Director is acceptable. Please only submit ONE approval form per item." CIP n Budget n n Purchasing N/A OK N/A OK N/A OK Accounting n n N/A OK ITEMS WILL NOT BE PLACED ON THE COUNCIL OR CM AGENDA W/OUT PRIOR FINANCE AND/OR LEGAL APPROVAL REV. 6/20/11 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 3 TO CONTRACT FOR ENGINEERING SERVICES FIRM: ATKINS NORTH AMERICA, INC. ("Engineer") ADDRESS: 6504 Bridge Point Parkway, Suite 200, Austin, TX 78730 PROJECT: Creek Bend Boulevard This Supplemental Contract No. 3 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Atkins North America, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 26th day of January, 2012 for the Creek Bend Boulevard Project in the amount of $179,898.43; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on July 12, 2012 to amend the scope of services and to increase the compensation by $805,808.42 to a total of $985,706.85; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on December 14, 2012 to amend the scope of services and to increase the compensation by $21,570.57 to a total of $1,007,277.42; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $49,900.00 to a total of $1,057,177.42; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Supplemental Contract Rev.12/01/08 01993202; 00269379 84275 ST33CADR CA- (s -0-2,-0s3 II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $49,900.00 the lump sum amount payable under the Contract for a total of $1,057,177.42, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. ATKINS NORTH ,AMEBIC iJNC. By: Z- 2/-/3 Date CITY OF RO D ROCK By: mew ZNOY Dod, crdD c(•014`''41443°4-` Date APP i OVED AS TMJ FORM: &kr. Stephal L. Sheets, City Attorney Supplemental Contract Rev.12/01/08 0199.7202; 00269379 84275 ST33CBDR 2 ADDENDUM TO EXHIBIT B Engineering Services PROJECT DESCRIPTION This Supplemental Contract consists of a geophysical study being done in order to assess the presence of voids and related features along the proposed Creek Bend Blvd alignment from station 23+25 to station 27+25. TASK 1: SURVEYING — Not Included with this Supplemental TASK 2: ROUTE STUDY — Not Licluded with this Supplemental TASK 3: ENVIRONMENTAL STUDIES 1. Round Rock Geophysics, LLC (RRGeo) will conduct a geophysical study within the proposed Creek Bend Blvd right-of-way from station 23+25 to station 27+25. The objective of this study is to assess the presence of voids and related features via a noninvasive technique that retains the biological integrity of the subsurface voids. The proposed geophysical method is called seismic refraction tomography, which uses compressional wave (P-wave) and shear wave (S -wave) travel time measurements, thereby creating 2D and 3D images of the subsurface velocity structure. Data will be collected along seven parallel lines oriented along the proposed alignment of Creek Bend Blvd and spaced approximately 20 feet apart. Each line will have a survey length of approximately 400 feet. There will be a total of 7 shot points per line and a geophone spacing of 5 -foot. A land streamer with 8 -Hz vertical geophones will be used to collect data. A minimum depth of exploration of 25-35 feet is planned. The field data will be downloaded and processed using industry standard software packages. The RREG report will include: • Description of the data acquisition procedures • Equipments and software used for data collection • Data quality and site condition • Data processing procedures • Results of data processing (2D and 3D displays) • Interpretation of the final results in terms of characterizing the void and associated features, • Conclusion and recommendation • Final site visit would be planned to mark the horizontal dimensions of the void on the surface. Page 1 of 2 TASK 4: PRELIMINARY DESIGN/30% PLANS — Not Included with this Supplemental TASK 5: PROJECT MANAGEMENT — Not included with this Supplemental TASK 6: DIRECT EXPENSES — Not Included with this Supplemental TASK 7: WATER IMPROVEMENTS — Not Included with this Supplemental TASK 8: UTILITY LOCATIONS/LAYOUTS — Not Included with this Supplemental TASK 9: GEOTECHNICAL DESIGN — Not Included with this Supplemental TASK 10: 60% PLANS -- Not Included with this Supplemental TASK 11: 95% PLANS — Not Included with this Supplemental TASK 12: 100% PLANS/FINAL SUBMITTAL — Not Included with this Supplemental NOT INCLUDED WITHIIN THIS SCOPE The following items are not included with this scope. These items, if necessary, would be added to the scope through a supplemental agreement. 1. Subsurface void(s) entry and exploration, biological surveys, and/or surveying and mapping. 2. Coordination with any state or federal agency. DELIVERABLES 1. Geophysical Study Report Page 2 of 2 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page _ 7 .S t H k 1 $ i I 1 1 f i i 3 n IA Creek Bend Blvd Extension Supplemental 3 - Attachment C e Y y $ Sji W/3 i g t g moi' 6 I11 is • I • %a 1 111 e R I ee l 1- 1 o Ie n iy I I i � e e e o F .1 e e _ A I e F. � I g f. I� e i32 I a e e IR o R R I ie R !n e 8 M e e R g 1i e _ g -ii o ie 4".! e n a N R R OfI a R 0 ao x_d x a 0 0 -c 0 ECO 0 012 Z w 0 0 Subconsultants TOTALS Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement c c c c a a 0 O O O 0) oiI Not performed with this Supplemental Agreement --�� Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement ;Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement Task 12: 100% Plans/I-Ina' Submittal Not performed with this Sup lemental A reement GRAND TOTAL: 0 $ - �$ - $ 49,900.00 $ 49,900.00 Other Direct Costs Total Loaded Labor Cost Total Labor Hours x on I- Task 1: Surveying Task 2: Route Study Task 3: Environmental Studies Task 4: Preliminary Design/30% Plans Task 5: Project Management Task 6: Direct Expenses Task 7: Water Improvements Task 8: Utility Locations/Layouts 0) y 0 c _p� (1) H N Task '10: 60% Plans Task 11: 95% Plans 4 49 69 403 Profit Rate =