CM-2016-1053 - 3/4/2016Contract Quantity Adjustment/ Change Order MV. uto Department: Transportation Administration Project Traffic Signal -- Red Bud at Old Settlers / Red Bud Name: at Mickey Mantle City Project ID Number: None Given ] ustification Quantity overran expected quantity - Final Quantity SUMMARY Original Contract Price: Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Orders) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Pius Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Page 1 of 3 Date: 2/18/2016 Change Order/Quantity Adjustment No. Signatures and Approvals Amount % Change $325,582.00 $313,387.30 -$12,194.70 -$12,194.70 $326,387.30 Prepared by: /'e ��� ��A,� 0.00% $13,000.00 4.15% $13,000.00 4.15% -$12,194.70 -$12,194.70 $326,387.30 Prepared by: /'e ��� ��A,� Collette Phillips, Asst Controller Austin Traffic Signal 1/31/2016 signature ' Printed Name, Title and Company Date Contra o :::A Approv , Ed Schroeder Vice -Pres Austin Traffic Signal 1/31/2016 signature Printed Name, Title and Company Date City Staff ` II Approval: t� ` L � r/ ture Printed Name --d Title Date City : l / od�%t/�/pLA Ptld f 6 Approval: signature Prirted Name and TTt!2 Date rev. 01110 Page 2 of 3 Contract Quantity Adjustment/ Change Order ChannP C9rrIQr nntn Bid Item# Item Description and Change Unit knit Price Amount Contract Time Adjustment (Days) 9001-2001 9001-2036 Install Only Strain Poles (30 ft) Drill Shaft (TS Poles) 36 in EA LF 4 $450.00 51,800.00 56 5200.00 S11,200.00 0 $0.00 50.00 0 50.00 50.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 50.00 0 50.00 $0.00 0 $0.00 $0.00 0 $0.00 1 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 .$0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 50.00 $0.00 0 $0.00 $0.00 0 50.00 $0.00 0 $0.00 $0.00 TOTALS: 513,000.00 0 rev. 01110 Page 3 of 3 Contract Quantity Adjustment/ Change Order nimntitu Ariiomtmc-nt Plata. TOTALS: -$12,194.70 0 Bid Item#. Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 0627-2001 666-2011 666-2035 666-2041 666-2110 666-2189 666-2191 666-2193 677-2001 TIMBER POLE (CL2) 40 FT REF PVMK (lYI-W) 4 IN SLD REF PVMK (TYI-W) 8 IN SLD REF PVMK (TYI-W) 12 IN SLD REF PVMK (TYI-W) 24 IN SLD PAVEMENT SEALER (4 IN) PAVEMENT SEALER (8 IN) PAVEMENT SEALER (12 IN) ELIMINATE PVMKS (4 IN) EA LF LF LF LF LF LF LF LF -4 $2,695.00 -$10,780.00 -117 $1.10 -$128.70 -37 $2.30 -$85.10 -16 $4.60 -$73.60 -166 $1.10 -$182.60 -243 $0.30 -$72.90 -37 $0.60 -$22.20 -8 $1.20 -$9.60 -168 $5.00 -$840.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 50.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 50.00 $0.00 0 $0.00 $0.00 0 .x,0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 50.00 0 50.00 So.00 TOTALS: -$12,194.70 0 City of Round Rock F ROUND ROC TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Austin Traffic Signal Construction Co., Inc. for the Red Bud Lane at Old Settlers Blvd and N Red Bud Lane at Mickey Mantle PI Intersection Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 3/4/2016 Dept Director: Gary D. Hudder, Transportation Director Cost: Indexes: Attachments: Partially executed CO-QA#1 Department: Transportation Department Text of Legislative File CM -2016-1053 Consider executing Quantity Adjustment/Change Order No. 1 with Austin Traffic Signal Construction Co., Inc. for the Red Bud Lane at Old Settlers Blvd and N Red Bud Lane at Mickey Mantle PI Intersection Improvements Project. A contract with Austin Traffic Signal for the installation of two traffic signals was approved December of 2014. This change order includes the costs for installation of strain poles and the drill shafts which replaced the timber poles in the original contract. Due to limited space and the necessity for guy wires on the timber poles, the strain poles were installed in their place. There was a deduct for the 4 timber poles and some additional items in the amount of $12,194.70 and an additional cost of $ 13,000 for drilled shafts and replacement poles. The net cost is $805.30 Staff recommends approval. City of Round Rock Page 1 Printed on 31412016