CM-13-04-027ROUND ROCK TEXAS PORJW PASSION PROf'ERITY City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 6 with Patin Construction, LLC for the University Boulevard Right Turn Lane at Sunrise Road, Sandy Brook Drive Improvements, and Oakmont Drive Improvements. Type: City Manager Item Governing Body: City Council Agenda Date: 4/12/2013 Dept Director: Gary Hudder Cost: Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: QA -CO # 6_Patin_U. Blvd. RTL.xls Text of Legislative File CM -13-027 The University Boulevard at Sunrise Road, Sandy Brook Improvements, and Oakmont Drive Improvements Project includes construction of pavement widening, intersection improvements, water line improvements, and modifications to an exiting traffic signal. The City Council awarded Patin Construction, LLC the construction contract for the amount of $644,785.20. Quantity Adjustment/Change Order (QA/CO) No. 1 was to cover the cost of labor and materials for the night time shut down to replace a water line at Sandy Brook Drive and Satellite Drive at the cost of $4,475, QA/CO No. 2 added sub -grade preparation to the contract and adjusted quantities for HMAC Type B PG -64-22 and flexible base at a cost of $143,962. QA/CO No. 3 added $5,000 to the contract for the mobilization charge and cost of asphalt for the final phase of paving University Boulevard at Sunrise Road. At the City's request, the contractor rescheduled the final paving so that the completion of the project would not be delayed for two additional weeks. QA/CO No. 4 was a deduction of $61,073.40 for final quantity adjustments at University Boulevard at Sunrise Road and improvements on Sandy Brook Drive. A change order in the amount of $3,000 was for the replacement of the irrigation system near the sidewalk at the Goddard School. The cost of QA/CO No. 4 was -$58,073.40. QA/CO No. 5 was for quantity adjustments for various pavement markings at a deduction of $11,171. QA/CO No. 6 is for quantity deductions for lime treated existing sub -base surface milling, soil retention blanket, and one stabilized construction entrance at a cost reduction of $10,991.30. Staff Recommends approval. City of Round Rock Page 1 Printed on 4/10/2013 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: Transportation Project Mgr/Resource: Leah Coffman nCouncil Action: ORDINANCE University Boulevard Right Turn Lane at Sunrise Road, Sandy Brook Drive Improvements, and Project Name: Oakmont Drive Improvements ContractorNendor: Palin Construction, LLC n RESOLUTION Agenda Wording City Manager Approval CMA Wording Consider executing Quantity Adjustment/Change Order No. 6 with Patin Construction, LLC for the University Boulevard Right Turn Lane at Sunrise Road, Sandy Brook Drive Improvements, and Oakmont Drive Improvements. Attorney Approval Attorney ,► Date13113 Notes/Comments / J/ O:\wdox1SCCInts\0199\1225\MISC\00271739.XLS Updated 6/3/08 ROUND ROCK. TEX.I rev, 08/12 Department: Transportation Project Name: Contract Quantity Adjustment/Change Order University Boulevard Right Turn Lane City Project ID Number TX05BLT Justification Date: Change Order/Quantity Adjustment No. Page 1 of 3 Quantity Adjustment/Change Order No. 6 is for deduction of quantities for lime treated existing subbase surface milling, soil retention blanket Class I:Type A, and one stablized construction entrance. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: 150 0 0 150 Amount $644,785.20 $30,326.30 -$10,991.30 $19,335.00 0/0 Change $664,120.20 $40,875.00 $0.00 $40,875.00 0.06 0.00 0.06 $60,210.00 Calendar Days Calendar Days Calendar Days Calendar Days Prepared By: Signature Kathy Michna, Admin Tech III, City of Round Rock Printed Name, Title, Company 01-13 Date Contractor: City Project Manager: Mayor/City Manager nature QM- \3T O.P1 Matt Tucek, Project Manager, Patin Printed Name, Title, Company Construction LLC Leah Coffman, Project Manager, City of Round Rock Printed Name, Title Steve Norwood, City Manager, City Printed Name, Title of Round Rock Q/' Date Li I )6/ - Date Date rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: University Boulevard Right Turn Lane Quan. Adj./Change Order No.: 6 Change Order Data Page 2 of 3 Item # igkMi&iTt4it-Weiteni4114N Item Description Unit Qty. Unit Price Amount ,,,,4ft.7,1g45.1t1S$::00; $0.00 Contract Time Adjustment fDays) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL.: rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: University Boulevard Right Turn Lane Quan. Adj./Change Order No.: 6 Quantity Adjustment Data Page 3 of 3 Bid Item # Item Description Unit Qty Unit Price Amount Contract Time Adjustment �nav5'., 8 Lime Treated Existing Subbase SY -562 $15.00 -$8,430.00 19 Soil Retention Blanket Class I:Type A SY -1,201 $1.30 23 Stablized Construction Entrance EA -1 $1,000.00 -$1,561.30 -$1,000.00 0 0 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: -$10,991.30 0