CM-13-04-043ROUND ROCK, TEXAS wRrov mon PR SP Rin City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 1 with Baker-Aicklen & Associates, Inc. for the Reuse Waterline Improvements - Phase IV -A (College Park Drive). Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 4/26/2013 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $8,000.00 Indexes: Self -Financed Water Construction Attachments: SA#1_Signed_4.19.13 Text of Legislative File CM -13-04-043 Phase IV -A of the Reuse Waterline Improvements Project continues the City's efforts to provide reuse water to the developing northeast area of Round Rock. The original Professional Services Contract was for design and construction phase services for this project. This project will extend the existing Reuse Waterline - Phase III, constructed with the Avery Center Project, north from the Austin Community College Campus along College Park Drive approximately 2,900 feet. It will terminate south of University Boulevard at a proposed reuse waterline and tank easement, where a future reuse waterline and elevated tank will be constructed under the Phase IV -B Project. The Phase IV -A waterline will be financed by the City and is to be built in conjunction with the developers widening of College Park Drive in the Avery Center. The Avery Center construction has fallen behind schedule, and it is necessary to continue forward with the design, bidding, and construction of Phase IV -A. This Supplemental Contract No. 1 for $8,000 includes the costs of the preparation of Project Documents, Construction Plans, and Bidding Phase services that would have been accounted for in the budget for the College Park Drive project. It also adds another 365 days to the contract. Staff recommends approval. City of Round Rock Page 1 Printed on 4/25/2013 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Reuse Waterline Improvements - Phase 4A Department Name: Utilities and Environmental Services Project Name: (College Park Drive) Project Mgr/Resource: Jeff Bell Council Action: ContractorNendor: Baker-Aicklen & Associates, Inc. ORDINANCE Agenda Wording n RESOLUTION xx City Manager Approval CMA Wording Consider executing Supplemental Contract No. 1 with Baker-Aicklen & Associates, Inc. for the Reuse Waterline Improvements - Phase 4A (College Park Drive). Attorney Alpproval Attorney Date V. /it/, j Notes/Comments O:\wdox\SCCInts\019911240\MISC\00272910.XLS Updated 6/3/08 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: BAKER-AICKLEN & ASSOCIATES, INC. ("Engineer") ADDRESS: 507 W. Liberty Avenue, Round Rock, TX 78664 PROJECT: Reuse Waterline Improvements — Phase 4A (College Park Drive) This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Baker-Aicklen & Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 6th day of April, 2012 for the Reuse Waterline Improvements -- Phase 4A (College Park Drive) Project in the amount of $24,450.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $8,000.00 to a total of $32,450.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $8,000.00 the lump sum amount payable under the Contract for a total of $32,450.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract 0199.1240; 00272840 e 61-1 Rcv.12/01 /08 84275 BAKER-AICKLEN ASSOCIATES, INC. By: ' 6,.:i _iJ ✓Y'Gt. Per-f,tafd R. Dag,.' Sfi uf,-a» Apn7 19 J 2-0t3 Date CITY OF RO D ROCK 6"t -eve. No By: Date e99 Supplemental Contract 0199.1240; 00272840 AP ' * VED AS TO ORM: Steph i L. Sheets, City Attorney tkAanciojer 2 Rcv.12/01 /08 84275 ADDENDUM TO EXHIBIT B Engineering Services The work to be performed under this contract will consist of the design of approximately 2,900 feet of a 16 -inch reclaimed water line from the existing line at the south end of College Park Drive and Avery/Nelson to the proposed easement location on the north end of College Park Drive, just south of University Blvd. See the attached project limit exhibit for the location of this lane. The Project will now be stand-alone and not included in the construction plan set of the expansion of the roadway from the existing four (4) lanes to the north near University Blvd. south to the existing Avery/Nelson intersection, including referencing existing water and wastewater lines and providing design for proposed storm drainage conveyance. The Project will now be publicly bid. The work to be performed by the ENGINEER under this supplemental work authorization, in general, will consist of: 1. BIDDING PHASE SERVICES A. Develop a Project Manual (Bid Documents, Contract Documents, and Specifications) for bidding purposes. B. Answer questions from bidders. C. Develop and issue addenda as appropriate to interpret, clarify, or expand the bid documents. D. Attend prebid meeting (if scheduled). E. Review and evaluate bids. F. Assist CITY in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. G. Prepare a Recommendation of Award and make recommendation of bid award to CITY. 2. CONSTRUCTIONS PHASE SERVICES — Additional Services A. Provide construction phase services in support of work related to this project anticipated to be five (5) months. Construction observation provided by City Inspector. The Consultant shall endeavor to secure compliance by the contractor to the plans and specifications. The Consultant shall not be responsible for construction means, methods, techniques, sequences or procedures in connection with the work and the Consultant shall not be responsible for the contractor's errors or omissions or failure to carry out the work in accordance with the contact documents. This task will include the following activities: • Attend preconstruction meeting. • Attend weekly progress meetings and issue meeting minutes. • Preparation and processing of Requests for Information, Change Proposals, Change Orders, Change Directives, review/approval of shop drawing, submittals and mock-ups (as required). • Review and approve contractor Applications for Payment. • Attend final inspection(s) and walk-thru for substantial completion; issue punch list for incomplete items including time for completion. • Acquire final close-out documents, warranties, accurate as -built drawings and other documents required to close-out project from the contractor. • Prepare record drawings. • Review and approve contractor's final Application(s) for Payment including retainage. £1.0Z Jagwaoap ELOZJagwanoN ELOZ Jago)op ELOz Jagwaldas ELOZ Isn6nV c LOZ AIM' ELOZ aunt £LOZie4 a M N £LOZ NdV a N COLZ UoJeW a M N ELOZ AJenWgad a N cmcJ(Jenuer a N ZLOZ Jagwaoap a M N ZLOZ JagwanoN a M N ZLOZJagolo0 a ZLOZJagwaidas a M N ZIOZ)sn6nV a M N Zloz AIN. a M N ZLOZ aunr a CO N ZLOZ AeIN a N ZLOZ 10V a N .- Task Description Weeks Notice to Proceed COMPLETE Surveying Design & Topo Subsurface Util. Engineering COMPLETE Construction Plan Set Overall Design: Prelim. COMPLETE Construction Plan Set Overall Design: Final COMPLETE Final Construction Plans Reclaimed Water Line COMPLETE Bidding Phase Services Construction Phase Services Reclaimed Water Line 0 1- LY) X w 0 1- 2 0 Z w 0 0 Fee Schedule Supple - ORIGINAL mental GRAND TOTALS (Totals TOTALS O V .- EA O O 1- Eft 0 O Er) EA $3,000 0, $3,000 0 En N t- CO 0 LO V' EA Construction Phase Services 7 Reclaimed Water Line 24 24 $3,500 $3,500 x$3.500 $3,500 i $7,000 TOTAL $24,450 $32,450 Plus Reimbursables at Cost O O O 0 0 0 LC) EA O In 'V' (1> O 0 0 r- Efi 0 O 0 v1- EA Original Total Original Total Supplemental Other Labor Supplemental Loaded Labor Total Loaded Direct Subcons Task Hours Total Hours Cost Labor Cost Costs ultants Construction Plan Set Overall Design: Prelimiinary 20 $3,000 $12,500 O O I0 a 000 u> v V= EA 0 O N- Eft O O c) EA O M t` O N Final Construction Plans Reclaimed Water Line 86 Bidding Phase Services Surveying: Design and Topography Sub -surface Util. Engineering 1 Construction Plan Set Overall Design: Final N I CO Lo w