Loading...
R-2016-3276 - 3/10/2016RESOLUTION NO. R-2016-3276 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Lone Star Paving Company for the 2015 Street Maintenance Program (Pavement Repairs) Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Lone Star Paving Company for the 2015 Street Maintenance Program (Pavement Repairs) Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 10th day of March, 2016. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: �� ?/ice �i • ��% SARA L. WHITE, City Clerk 0 112.1604; 0053689 R011NU RO G17EXA! rev, 06/15 Department: Project Name: City Project TD Number rm-tirkation EXHIBIT Contract Quantity Adjustment/Change Order Transportation 2015 Street Maintenance Program (Pavement Repairs) MNT16 Page l of 3 Date: 1/5/16 Change Order/Quantity Adjustment No. 1 'ontract Quantity Adjustment/Change Order #1 is a final quantity adjustment for the project closeout. These adjustments are the result of additional areas found during the pavement repairs and overlay for the 2015 Street Maintenance Program (Pavement Repairs) Project and ieducts to reflect actual quantities. SUMMARY Original Contract Price:. Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Amount % Change I in MW -$3,747.80 -0.01 -$3,747.80 -0.01 5-- - $724,634.40 3 $126,484.40 4iAnnh ira Printed Name, iitie, company ua>:e Contractor: .1 ///LA (' I'-- Jim 9-41,1tY Mi iiA I l )i re-ciCX'. Ung- SYJX ature Printed Name, Title, Company Date City Project Manager: Randy Crum, Project Mana erSenior, City Of Round Rack 1/13/16 Signature Printed Name, Title Date Mayor/City Manager Signature Printed Name, Title Date Contract Quantity Adjustment/ Change Order ROIINO ROCK TEAS rev, 06/25 Project Name; 2015 Street Maintenance Program (Pavement Repairs) Quan. Adj./Change Order No. Chanae Order Data Page 2 of 3 .,:_`''-.?.:'a �` tai"=- 3-..,,�ac?�4-=_; " W11, 2A _ _ _ _ .. x �9 ':E''r..�_"_'.� TEM 'L :�,e Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Davs) 3 b=•=-- r� z .m-^-c.i. � azr 5-=--s4.- icy. ?:.�"� �p �.' - :.a�'ia��: „E € ' meq^ .�'�'�-a�".+..r�. *��. -��3 �? ._6"ra." � ... �s<� z-wyrT �. "L'�.-a�T r3�'.'� B ci..-sem - -�,,� ..-r �<. - -a_. .i 'o a�"�-.. ->;s4 �..�•.R ,�'','-_ _ 5 Reflectorized TY -1 Thermoplastic Pavment Markings (4" Broken -Yellow) LF -30 $2.00 -$60.00 8 Reflectorized TY -1 Thermoplastic Pavment Markings (12" Solid -White) LF -17 $3.40 -$57.80 10 Reflectorized TY -1 Thermoplastic Pavment Markings (Word -White) EA -3 $120.00 -$360.00 11 Reflectorized TY -1 Thermoplastic Pavment Markings (Arrow -White) EA -3 $40.00 -$270.00 12 Manhole Adjustment EA -1 $600.00 -$600.00 13 Valve Can Adjustment EA -4 $300.00 -$1,200.00 14 Erosion Control LS -1 $1,200.00 -$1,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 wzw TOTALS: $3747.80 0 Page 3 of 3 Contract Quantity Adjustment/Change Order r, rev, 06115 Project Name: 2015 Street Maintenance Program (Pavement Repairs) Quan. Adj./Change Order No.: nlTsntitv Adiu--,tment Data - - Bid Item # Item Description Bid Unit Qty- Unit Price Amount Contract Time Adjustment ell I Machine -Laid Type C-HMAC 2.5" Ton 480 $165.00 $79,200.00 2 Pavement Repair -(RAP) ton 14 $140.00 $1,960.00 3 Surface Milling SY 2005 $17.00 $34,085.00 Reflectorized TY -1 Thermoplastic 4 Pavement Marking (4" Solid Yellow) LF 2 $2.80 $5.60 Reflectorized TY -1 Thermoplastic 6 Pavement Markings (4" Broken -White) LF 370 $2.00 $740.00 Reflectorized TY -1 Thermoplastic 7 Pavement Markings (8" Solid -White) LF 502 $4.80 $2,409.60 Reflectorized TY -1 Thermoplastic 9 Pavement Markings (24" Solid -White) LF 1740 $6.80 $11,832.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $130,232.20 0