Loading...
CM-13-05-059ROUND ROCK, TEXAS PURPOSE IM1RIOtt PROEPSJIM City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 5 with Patin Construction, LLC for the Municipal Office Complex Plaza, Parking and Brown/Florence Street and Drainage Improvement Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 5/10/2013 Dept Director: Gary Hudder Cost: $49,982.94 Indexes: 2002 General Obligation Bonds Attachments: QA -CO # 5 Patin Brown Street.xls Text of Legislative File CM -13-05-059 The City awarded Patin Construction, LLC the construction services contract at a cost of $1,972,675.37 for roadwaork and drainage improvements on Brown Street and Florence Street on April 26, 2012. Quantity Adjustment/Change Order (QA/CO) NO. 1 in the amount of $55,318.47 was needed for utility, electrical, lighting, hardscape, and landscape adjustments and modifications. QA/CO No. 2 was for $35,950 and covered quantity adjustments for a grate inlet and 12" storm RCP. It also included a change order for the cost of driveway improvements on the Franco property and the extension of a service panel for Panel PB. QA/CO # 3 was needed to decrease the square footage of pavers and crosswalks and to increase the quantities for the demolition of curb at crosswalks for a cost decrease of $6,800. It also added fifteen calendar days to the construction contract. QA/CO # 4 added the cost of a gate for Mr. Franco and a 24" pier for a flag pole and deducted the cost of a lighting contacotr to Panel PB for an increase of $1,000. Quantity adjustments for concrete walkways and Type D curb at a cost increase of $1,464 were also included. The total cost of QA/CO No. 4 was $2,464. QA/CO No. 5 is needed for final quantity adjustments needed to close out the project at a cost of $49,982.94. The final cost of the contract with Patin Construction, LLC would be $2,109,590.78. Staff recommends approval. City of Round Rock Page 1 Printed on 5/9/2013 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: Transportation Project Mgr/Resource: Leah Coffman Council Action: ORDINANCE Agenda Wording Municipal Office Complex Plaza, Parking and Brown / Florence Street and Drainage Project Name: Improvement ContractorNendor: Patin Construction, LLC n RESOLUTION City Manager Approval CMA Wording Consider executing Quantity Adjustment/Change Order No. 5 with Patin Construction, LLC for the Municipal Office Complex Plaza, Parking and Brown / Florence Street and Drainage Improvements Project. Attorney Approval EXttorney Notes/Comments Date O:\wdox\SCCInts\0199\1271 \MISC\00273885.XLS Updated 6/3/08 • rev, 08/12 Department: Transportation Contract Quantity Adjustment/Change Order Project MOC Plaza, Parking & Brown/Florence Name: Street and Drainage Improvements City Project ID Number AA3OBCHST Justification Page 1 of 3 Date: 5/1/13 Change Order/Quantity Adjustment No. 5 Quantity Adjustment/Change Order No. 5 is needeed for final quantity adjustments. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Contractor: City Project Manager: C M. -lb -05- ( c) Submitted for Approval Amount $1,972,675.37 -$8,436.00 $49,982.94 $41,546.94 $2,014,222.31 $95,368.47 $0.00 $95,368.47 0/0 Change 5% 0% 5% $136,915.41 180 Calendar Days 83 Calendar Days 0 Calendar Days 263 Calendar Days Kathy Michna, Admin Associate, City of Round Rock Printed Name, Title, Company Approvals Jimmy Patin, President, Patin Construction LLC Printed Name, Title, Company Leah Coffman, Project Manager Senior, City of Round Rock Printed Name, Title zit \ID(tate Date Steve Norwood, City Manager, City of Round Rock Or/73 Printed Name, Title Date • rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: MOC Plaza, Parking & Brown/Florence Street and Drainage Improvements Quan. Adj./Change Order No.: 5 Chance Order Data Page 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) $0.00. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $o a6 0 4 rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: MOC Plaza, Parking & Brown/Florence Street and Drainage Improvements Quan. Adj./Change Order No.: 5 Quantity Adjustment Data Page 3 of 3 Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment !naval 8" Asphalt Stablizied Road Base CY 216 $43.50 $9,396.00 0 6" Asphalt Stabilized Parking Base CY -163 $31.62 -$5,154.06 0 Curb and Gutter LF 104 $15.00 $1,560.00 0 Ribbon Curb LF 13 $12.00 $156.00 0 Rock Wall SF 8 $30.00 $240.00 0 Pedestrian Guardrail at Top of Wall LF -3 $100.00 -$300.00 0 12" Trench Drain LF 130 $98.00 $12,740.00 0 Wheel Stops EA 13 $65.00 $845.00 0 No Outlet Sign WI 4-2 EA -1 $368.00 -$368.00 0 Standard Concrete Walkway Pavement SF -600 $4.00 -$2,400.00 0 Color Concrete Band Pavement SF 221 $8.00 $1,768.00 0 Paver Plaza Pavement SF 70 $6.00 $420.00 0 Type A Ribbon Curb LF 7 $10.00 $70.00 0 Type D Ribbon Curb LF 40 $16.00 $640.00 0 Retaining Wall Guardrail at Amphitheater Overlook LF 7 $160.00 $1,120.00 0 Handrail For Ramps LF 2 $75.00 $150.00 0 Handrail For Steps LF 16 $100.00 $1,600.00 0 Irrigation in Alternate Area 1 LS 1 $13,750.00 $13,750.00 0 Irrigation in Alternate Area 2 LS 1 $13,750.00 $13,750.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $49,982.94 0