Loading...
CM-13-09-173ROUND ROCK, TEXAS PUP°.. IASSIONPNSPFRITY City of Round Rock Agenda Item Summary Agenda Number: Title: Consider issuing a purchase order to Austin Traffic Signal Construction Co., Inc. for road boring on Harrell Parkway for the Rock 'N Lights Road Bore Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 9/27/2013 Dept Director: Rick Atkins, Director Cost: $31,900.00 Indexes: 2007 Certificate of Obligation Bonds Attachments: 09 -27 -13 -PARD -CM -Rock N Lights Road Bore, 09-27-13-LAF-Rock N Lights Road Bore Text of Legislative File CM -13-09-173 This item will authorize the City to issue a purchase order to Austin Traffic Signal Construction Co . for road bores along Harrell Parkway in Old Settlers Park. The project includes multiple bore locations and installing conduit under the existing road. This project will allow the electrical needs for the Rock 'N Lights special event to be out of the public's eye and remove the need for speed bumps on the road that previously protected the lines for the light display. Staff recommends City of Round Rock Page 1 Printed on 9/26/2013 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: PARD Project MgrlResource: Aileen Dryden Council Action: ORDINANCE Project Name: Rock N' Lights Road Bore ContractorNendor: Austin Traffic Signal Construction Co., Inc. RESOLUTION Agenda Wording City Manager Approval CMA Wording Consider issuing a purchase order to Austin Traffic Signal Construction Co., Inc. for road boring on Harrell Parkway for the Rock N' Lights Road Bore Project. Attorney Approval Attorney Notes/Comments Date q ---1 et — t -3 O:\wdox\SCCInts\0123\1300\MISC\00283064.XLS Updated 6/3/08 ROCK N' LIGHTS ROAD BORE PROJECT Proposal for Road Boring on Harrell Parkway SECTION 1 — PROPOSAL FORM ITEM QTY. UNIT PRICE $ — TOTAL c' b " 1) Road Bore — 32' min length, 24" min depth, two 4" Sch. 40 PVC conduit w136" max sweep, complete in place per plan. 11 EA 7/ C f A,-) 6`3 $ C__ L' C {� `" C / TOTAL ,U �, c \ V t PROPOSAL PRICE: T-, $ .`J \ ' \ O ) (Y'1 I Q , *Note: All prices shall include materials, fabrication, welding, painting, delivery, fees and other charges. The City of Round Rock is a tax-exempt agency. No sales tax will be paid for the product(s). See attached plans for details on bid items. Signature /1/73 Fr3rnUa l: C J\, Austin Traffic Signal Construction Co, Inc, Company Proposal information and details: • The City reserves the right to award each proposal item to the vendor that the City deems to be the best value. The City may award all of the proposal items to one vendor or may award individual proposal items to separate vendors. • Proposals are due back by 11 am on Thursday, September 12, 2013. Proposals shall be submitted via email to Aileen Dryden via adryden@roundrocktexas.gov • A purchase order will be issued to the selected vendor(s) by Friday, September 20, 2013. • All items listed in the proposal shall be complete and in place per plan no later than thirty (30) calendar days from issuance of purchase order. • Attached plans show design details and general location of road borings. LOCATION 1 SITE 1.1. The proposal items will be installed at the City of Round Rock's — Old Settlers Park 1.2. Location: 3300 E. Palm Valley Blvd (yard site), Round Rock, TX City Representative: Aileen Dryden @ 512-341-3375. 2. DELIVERY AND SCHEDULE 2.1.1. The items specified in the proposal are required to be complete in place per plan no later than Friday, November 1, 2013 at 5pm.