CM-13-11-201ROUND ROCK, TEXAS PUPPOSE IwwOH PMXJ RITIl City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 2 with Baker-Aicklen & Associates, Inc. for the Reuse Waterline Improvements - Phase IV -A (College Park Drive). Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 11/1/2013 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $4,850.00 Indexes: Self -Financed Water Construction Attachments: Agmt_ReuselV-A_BakerAicklen_SC#2_CM11.1.13, Council Map Text of Legislative File CM -13-11-201 This project continues the City's efforts to provide reuse water to the developing northeast area of Round Rock. The original Professional Services Contract with Baker-Aicklen & Associates, Inc. was for design and construction phase services for Phase IV -A of the Reuse Waterline Improvements Projects. This project will extend the existing Reuse Waterline - Phase III, constructed with the Avery Center Project, north from the Austin Community College Campus along College Park Drive approximately 2,900 feet. It will terminate south of University Boulevard at a proposed reuse water line and tank easement, where a future elevated storage tank is currently under construction (Phase IV -B). This tank will provide 1.25 million gallons of elevated storage capacity for the Reuse Water System. Phase IV -B's construction began in May of 2013, and has an anticipated completion date of August 2014. This water line is being financed by the City and will be built in conjunction with the developer's widening of College Park Drive in the Avery Center. The Avery Center construction has fallen behind schedule, and it is necessary to continue forward with the design, bidding and construction of Phase IV -A. Supplemental Contract No. 1 for $8,000 included the costs of the preparation of Project Documents and Construction Plans and Bidding Phase services that would have been accounted for in the budget for the College Park Drive project. It also added another 365 days to the contract and increased the original contract amount of $24,450 to $32,450. This Supplemental Contract No. 2 is for $4,850 and includes the costs for preparing exhibits and related documentation for 50 -foot wide Temporary Construction Easements along the eastern Right -of -Way of College Park Drive for the entire length of the project. This Supplemental Contract raises the total contract amount with Baker-Aicklen & Associates, Inc. to $37,300. Staff recommends approval. City of Round Rock Page 1 Printed on 10/31/2013 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: Utilities and Environmental Services Project Mgr/Resource: Jeff Ball Council Action: ORDINANCE Reuse Waterline Improvements - Phase 4A Project Name: (College Park Drive) ContractorNendor: Baker-Aicklen & Associates, Inc. El RESOLUTION Agenda Wording City Manager Approval CMA Wording Consider executing Supplemental Contract No. 2 with Baker-Aicklen & Associates, Inc. for the Reuse Waterline Improvements - Phase 4A (College Park Drive). Attorney Approval QAttorney Notes/Comments Date /el 23) )3 O:\wdox\SCClnts10199112401MISC100285206.XLS Updated 6/3/08 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: Baker-Aicklen & Associates, Inc. ("Engineer") ADDRESS: 507 W. Liberty Avenue, Round Rock, TX 78664 PROJECT: Reuse Waterline Improvements — Phase 4A (College Park Drive) This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Baker-Aicklen & Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 6th day of April, 2012 for the Reuse Waterline Improvements — Phase 4A (College Park Drive) Project in the amount of $24,450.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on April 26, 2013 to amend the scope of services and to increase the compensation by $8,000.00 to a total of $32,450.00; WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $4,850.00 to a total of $37,300.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit 13. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $4,850.00 the lump sum amount payable under the Contract for a total of $37,300.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract 0199.1240; 00285117 CNA -13- \\- _01 Rev.12/01/08 84275 BAKER-AICKLEN & ASSOCIATES, INC. By: f . D2v:d VevH.n , V, �e f�jr�s.2 41- Dch 4cr- 24, 2-o/ 3 Date CITY OF ROUND ROCK AP ' OVED AS I FORM: By: Date Supplemental Contract 0199.1240; 00285117 evCori ,ap,.,kairr 2 441 T/ Ju Step i' n L. Sheets, City Attorney Rev.12/01 /08 84275 ADDENDUM TO EXHIBIT 13 Engineering Services Original contract: The work to be performed under the original contract consisted of the design of approximately 2,900 feet of a 16 -inch reclaimed water line from the existing line at the south end of College Park Drive and Avery/Nelson to the recently constructed 16 -inch reclaimed water line and 1.25 million gallon elevated storage tank on the north end of College Park Drive, just south of University Blvd. The work included referencing existingwater and wastewater lines and providing conceptual layout for future storm drainage conveyance. The original contract plans were to be combined into a set of plans (by others) for the widening of College Park Drive to four lanes between University Blvd. and Avery -Nelson Blvd. The combined set of plans was intended to be constructed by a private developer and not publicly bid. Supplemental Contract No. 1: The project scope was changed to be stand-alone and publicly bid. The additional work consisted of creating bidding documents and providing bid phase services. Supplemental Contract No. 2: The work to be performed by the ENGINEER under this supplemental work authorization, in general, will consist of: 1. Preparing exhibits and related documentation for 50 -foot wide Temporary Construction Easements along the eastern right-of-way line for the entire length of the project. 2. Making City Requested Revisions to the 100% plans and project manual. The 50 -foot temporary construction easements will require minor changes to the plans and quantities. The additional construction area will add temporary erosion control measures and increase the quantity of revegetation as more area will be disturbed by construction. The City also requested that a new bid item be added to require daily sweeping of the pavement to remove dirt, mud and construction debris tracked onto the roadway. The work includes updating the bidding and construction schedule to reflect the resulting time added to the overall project schedule. Note: The project was scheduled to be advertised on October 17, 2013. The additional work includes time to coordinate all changes. ADDENDUM TO EXHIBIT C Work Schedule Task Description Design Survey Subsurface Utility Engineering Construction Plan Set Overall Design - Preliminary Construction Plan Set Overall Design - Final Prepare temporary construction easements and revise 100% plans (Supplemental Contract No. 2) Bidding Services Construction Phase Services Timeframe or Milestone Complete Complete Complete Complete Five working days to prepare temporary construction easement sketches and ten working days to revise 100% plans after client negotiates easements and authorizes B -A to make the revisions Approx. 60 days after City Publishes Notice to Bidders in newspaper Approx. 120 days after City issues Notice to Proceed to Contractor ADDENDUM TO EXHIBIT D Fee Schedule NEW TOTALS vii .4' .-I V? 0 0 .- 4 VT 0 0 M VT 0 0 « to 00S`Zi$ o ill tt V) o 0 N: V: N Ni Vl 0 to N' IA- $4,850 $37,300 Estimate $500 I * Note: Fee for temporary construction easements is $750 each broken down as follows: $250 each parcel for sketches showing easement location, width and area. $500 each parcel to develop metes & bounds descriptions with refined sketch showing bearings and distances. Metes & bound descriptions will be provided only if requested by client. Supplemental Totals 0 '^ 0 VI N N i? 0 0 4.0 N V? PREVIOUS TOTALS .:1" 0 00 � N LI) 0 N 0 V)" 0 ‘f N M Supplemental Total Loaded Labor Cost O V1 N N' N 0 0 tD Ni V} Previous Total Loaded Labor Cost a Vl `^ 0 0 to IA 0 A.A.vb. O N 0 0 vi Previous Total Supplemental Labor Hours Total Hours .T-1 n Ln a-1 o N 0 20 0000 m TOTAL Plus Reimbursables at Cost to Ito Surveying: Design and Topography Sub -surface Util. Engineering Construction Plan Set Overall Design: Preliminary Construction Plan Set Overall Design: Final Final Construction Plans Reclaimed Water Line Bidding Phase Services Construction Phase Services Reclaimed Water Line * Temporary Construction Easements Revise 100% plans & project manual .-i N M V' i!1 to N t al