CM-13-11-208ROUND ROCK, TEXAS PURPOSE_ svaa PIUM arrr City of Round Rock Agenda Item Summary Agenda Number: Title: Type: Governing Body: Agenda Date: Dept Director: Cost: Indexes: Attachments: Department: Consider executing Quantity Adjustment/Change Order No. 1 with Landmark Structures I, L.P. for the Reuse Water Transmission Main: Phase IV -B: Elevated Tank Project City Manager Item City Manager Approval 11/8/2013 Michael Thane, Director of Utilities and Environmental Services $19,152.00 Self -Financed Water Construction COQA#1_ReuseIVB_Landmark_CM11.8.13, Council Map_Reuse Water Phase IV -B_3.21.13 Utilities and Environmental Services Text of Legislative File CM -13-11-208 The Reuse Water Transmission Main Elevated Tank Project continues the City's efforts to provide reuse water to the developing Northeast area of Round Rock. This contract with Landmark Structures I, L.P. is for the construction of Phase IV -B of the project. Included in this project is a 1.25 million gallon Elevated Water Storage Tank and approximately 900 linear feet of 16 -inch reuse water transmission line that will connect to the Phase IV -A Reuse Transmission Main, which is currently in design with Baker-Aicklen, as part of the College Park Drive Improvements. The tank will provide 1.25 million gallons of elevated storage capacity for the Reuse Water System to help control pressure in the system. In order to reduce frequency in which College Park Drive had to be closed for construction purposes, the Project Manager pulled 110 feet of reuse water line from the Phase IV -A Project and added it to the Phase IV -B Project. This added $28,312 to the cost of the Phase IV -B Project. A credit of $9,160 for a reduction in the size of the pedestal platform and reduction of the overflow pipe diameter is also included in this Change Order No. 1, bringing the total amount to $19,152. Staff recommends approval. City of Round Rock Page 1 Printed on 11/7/2013 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Reuse Water Transmission Main: Phase IV -B: Department Name: Utilities & Environmental Services Project Name: Elevated Tank Project Mgr/Resource: Jeff Bell Council Action: ORDINANCE Agenda Wording ContractorNendor: Landmark Structures I, L.P. U RESOLUTION Q City Manager Approval CMA Wording Consider executing Quantity Adjustment/Change Order No. 1 with Landmark Structures I, L.P. for the Reuse Water Transmission Main: Phase IV -B: Elevated Tank Project. Attorney Approval Attorney Notes/Comments Date l nl 2q/ /3 O:\wdox\SCCInts10199\1335\MISC\00285705.XLS Updated 6/3/08 rev. °Gni Contract Quantity Adjustment/Change Order Department: Utilities & Environmental Services Project Phase 48 - Reuse Water Transmission Main Name: Phase IV -8: Elevated Tank City Project JD Number WRO1PH4B Justification Page 1 of 3 Date: 10/22/2013 Change Order/Quantity Adjustment No. 1 Extension of 16 -inch reuse water line across College Park Drive and deductions for 1) reducing elevated tank overflow diameter and 2) reducing size of interior platform in elevated tank pedestal SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Pipe $0.00 $19,152.00 $19,152.00 0.00% 0.64% 0.64% S19,152.00 430 Calendar Days Calendar Days 5 Calendar Days 435 Calendar Days Printed Contractor Company Name: Printed Name, Title Landmark Structures Printed Name, itle ter, 06/11 Contract Quantity Adjustment/Change Order Project Name: Quan. Adj./Change Order No.: Item # IROMMINU CPR Ol CPR 02 Item Descri . tion Phase 4B - Reuse Water Transmission Main Phase IV -B: Elevated Tank Chane Order Data Unit QtY. Page 2 of 3 Unit Price Extension of 16" reuse water line Amount Contract Time Adjustment (Days) Reduction of overflow pipe diameter LS 1 LS 1 $28,312.00 CPR 02 Reduction in size of pedestal platform LS 1 -$4,160.00 -$5,000.00 $28,312.00 -$4,160.00 -$5,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 50.00 50.00 50.00 50.00 50.00 50.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 50.00 $0.00 $0.00 5 0 0 TOTALS: $19,152.00 5 rev. DU 11 .t,t Contract Quantity Adjustment/Change Order Project Name: Quan. Adj./Change Order No.: Bid Item # Item Descn . tion Phase 4B - Reuse Water Transmission Main Phase IV -B: Elevated Tank 1 uanti Ad ustment Data Unit Price Amount Page 3 of 3 Contract Time Adjustment Days) 50.00 50.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 50.00 50.00 50.00 50.00 50.00 $0,00 $0,00 $0.00 $0.00 $0.00 50.00 50.00 S0.00 $0.00 50.00 50.00 TOTALS: $0.00 0