Loading...
CM-13-11-215ROUND ROCK, TEXAS PURPOSE. n on PROSPPm< City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 2 with CP&Y, Inc. for the IH 35 Ramp Reversals, US 79 to FM 3406 (PLanning Phase) Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 11/22/2013 Dept Director: Gary Hudder, Transportation Director Cost: $11,000.00 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: SC#2 w -CP Y for IH 35 Ramp Reversals, US 79 to FM 3406 (00286339) Department: Transportation Department Text of Legislative File CM -13-11-215 Interstate Highway 35 (IH35) in Round Rock serves as the spine of our transportation system. Access to and from IH35, as well as crossing IH35, can have significant impacts on the entire roadway network. In addition, IH35 serves as access for some of the most viable commercial real estate in our community, due to the large volumes of traffic on this road each day. For these reasons, IH35 was ranked as the number one transportation problem in our community in the approved 5 Year Capital Improvement Plan (CIP). This project will have many benefits: it will significantly improve access to the numerous commercial properties along the frontage road; it will reduce congestion at the intersections by allowing traffic to by-pass the intersection via the interstate main -lanes; and it will eliminate a bottleneck on the IH35 northbound main lanes at US 79. Work performed under the original contract consisted of all environmental documents , all items necessary to obtain federal and state approval for this project, and 30% design plans at a cost of $586,981.30. Supplemental Contract No. 1 included PS&E for the reversals of the entrance and exit ramps on IH35 and the addition of an auxiliary lane on the frontage road between FM 3406 and US 79. Supplemental Contract No. 2 includes the cultural resource and habitat assessment of the potential for impacts to the Jollyville Plateau Salamander and an update to the existing environmental document. This supplemental is needed since the Jollyville Plateau Salamander has recently been listed as endangered and is required to complete the design phase and to proceed to the construction phase of this project. It is anticipated that the findings will indicate there will be no adverse modifications of any designated critical City of Round Rock Page 1 Printed on 11/21/2013 Agenda Item Summary Continued (CM -13-11-215) salamander habitats. The cost of Supplemental Contract No. 2 is $11,000.00, bringing the new contract total to $1,080,717.87. Staff Recommends Approval City of Round Rock Page 2 Printed on 11/21/2013 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: Transportation Project Mgr/Resource: Leah Coffman Council Action: ORDINANCE Project Name: tH 35 Ramp Reversals, US 79 to FM 3406 ContractorNendor: CP&Y, Inc. n RESOLUTION Agenda Wording ElCity Manager Approval CMA Wording Consider executing Supplemental Contract No. 2 with CP&Y, Inc. for the IH 35 Ramp Reversals, US 79 to FM 3406 (Planning Phase) Project. Attorney Approval El/Attorney Notes/Comments Date O:\wdox\SCCInts10199112101MISC100286251.XLS Updated 6/3/08 STATE OF TEXAS COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: CP&Y, INC. ("Engineer") ADDRESS: 10415 Morado Circle, Bldg 1, Suite 200, Austin, TX 78759 PROJECT: 111 35 Ramp Reversals, US 79 to FM 3406 (Planning Phase) This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and CP&Y, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 8th day of March, 2012 for the II -I 35 Ramp Reversals, US 79 to FM 3406 (Planning Phase) Project in the amount of $586,981.30; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on November 20, 2012 to amend the scope of services and to increase the compensation by $482,736.57 to a total of $1,069,717.87; WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $11,000.00 to a total of $1,080,717.87; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: 1. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. 1I. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $11,000.00 the limp sum amount payable under the Contract for a total of $1,080,717.87, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract 0199.1210; 00286208 Rev.12/01 /08 84275 Date CITY OF ROUND ROCK By: Date ///ZrCA.3 Supplemental Contract 0199.1210; 00286208 AP' 1, • VED AS T L. le • 1 FORM: r eStep Ncx'�.. er 2 n L. Sheets, City Attorney Rev. 12101/08 84275 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope are as follows: The Subconsultant shall provide the necessary professional environmental services to perform the cultural resource and habitat assessment services for the project. A detailed description of the services to be performed is provided below. II. SOCIAL, ECONOMIC & ENVIRONMENTAL STUDIES AND PUBLIC INVOLVEMENT Environmental Reports will be in accordance with 43 Texas Administrative Code (TAC) 2.40-2.51, Council on Environmental Quality Regulations (40 CFR 1500-1508), Code of Federal Regulations, Title 23, Part 771, the FHWA Technical Advisory T6640.8A, and Highway Design Operations and Procedures Manual, Part II -B. A Categorical Exclusion (CE) will be prepared by CP&Y for the proposed project. C. ENVIRONMENTAL STUDIES 10. Areas of Environmental Concern or Affected Environment (c) Cultural Resources No new cultural resources tasks are included in this scope of work. (e) Ecological Investigations (iii) Threatened and Endangered Species b) Assessment of the Potential for Impacts to the Jollyville Plateau Salamander and Designated Critical Habitat Additional services will include an assessment of the potential for impacts to the Jollyville Plateau Salamander (Eurycea tonkawae) and for adverse modification of designated critical habitat. These analyses will be performed by an SWCA salamander expert and an SWCA hydrogeologist, both of whom are Texas Registered Professional Geoscientists, and will consider Edwards Aquifer hydrogeology, site-specific hydrological conditions, applicable water quality standards, and potential contaminat pathways between the project and known salamander locations (total of 24 hours each). c) Agency Consultation Should agency consultation be required, we have included an optional task to attend meetings and provide support services for that consultation. This is assuring preparation for and attendance of up to four meetings with agency personnel to be attended by an SWCA salamander expert and an SWCA hydrogeologist (total of 16 hours each). ADDENDUM TO EXHIBIT C Work Schedule Duration Completion Date N/A Oct 25, 2013 Notice to Proceed Nov l 1, 2013 Update ENV doc with CHU wording 17 ADDENDUM TO EXHIBIT D Fee Schedule For the services described raider Addendum to Exhibit 13, we request compensation on a lump sum basis for all services. The estimated hours and dollars to accomplish this work are shown below. The breakdowns for man-hours and costs per function code are shown on the following pages. ESTIMATE OF MAXIMUM COMPENSATION SALARY COSTS - LUMP SUM Jollyville Plateau Salamander Impacts Assessment Specialist XI 24 Hrs. @ $182.00 = $ 4,368.00 Specialist IV 24 Hrs. @ $93.00 = $ 2,232.00 $ 6,600.00 Agency Consultation Specialist X1 16 Hrs. @ $182.00 = $ 2,912.00 Specialist IV 16 Hrs. @ $93.00 = $ 1,488.00 $ 4,400.00 SALARY COSTS $ 11,000.00 TOTAL SALARY COSTS $ 11,000.00 EXPENSES None TOTAL SALARY COSTS + EXP AMOUNT PAYABLE $ 11,000.00