Loading...
CM-13-12-242City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 7 with Huggins/Seiler & Associates, LP for the Mays Street Reconstruction Phase 1 Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 12/6/2013 Dept Director: Gary Hudder, Transportation Director Cost: $37,532.00 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: SC#7 w -Huggins -Seiler for Mays Street Reconstruction Phase 1 (00287465) Department: Transportation Department Text of Legislative File CM -13-12-242 Mays Street Reconstruction provides for the widening of North Mays Street from a four lane arterial to a five lane section between the Brushy Creek Bridge and the Union Pacific Railroad/Lake Creek Bridge. This includes the sidewalks, street trees and lighting, utility relocations, and gateway features. The initial engineering services contract consisted of a preliminary schematic, surface utility engineering, utility coordination, field surveying and mapping, land appraisal services, TCEQ coordination, and a 30% design schematic at a cost of $235,288.80. Supplemental Contract (S.C.) No. 1 provided for additional surveying services at a cost of $6,166. S.C. No. 2 provided for the development of complete plans, specifications, and PS&E from the approved design schematic at a cost of $324,195. S.C. # 3 provided for additional right-of-way appraisal, preparation of environmental documents, and final design plans at a cost of $64,699.40. S.C. No. 4 provided for additional engineering services for the design and detailing for illumination supports at the Brushy Creek Bridge, additional site verification at Bent 16 on the UPRR Bridge, and detailing for a more complex gateway arch structure at a cost of $3,345. S.C. No. 5 asked for $38,313.40 to cover the revision of PS&E plans, HUD environmental documents, and the Water Pollution Abatement Plan (WPAP) to include Main Street improvements from Blair Street to Mays Street. S.C. No. 6 provided four AT&T test holes and a new WPAP submission at a cost of $10,178. TCEQ has required the City to submit a new WPAP including Main Street improvements from Blair Street to Mays Street instead of revising the WPAP originally submitted for this project. S.C. No. 7 includes engineering and design work for the addition of aesthetic treatments City of Round Rock Page 1 Printed on 12/5/2013 Agenda Item Summary Continued (CM -13-12-242) and illumination to the Union Pacific Railroad bridge planned as a memorial to the Baylor University basketball team. The bridge will be known as the "Immortal X Bridge". S.C. No. 7 provides for the addition of these Illumination and Aesthetic Detail sheets as well as the revision of completed plan sheets for Traffic Control on Round Rock Avenue and the addition of Traffic Control plan sheets on Mays as required by the inclusion of the "Immortal X Bridge" motif. The total cost of the contract with Huggins/Seiler and Associates would be $719,717.60. Staff recommends approval. City of Round Rock Page 2 Printed on 12/5/2013 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: Transportation Project Mgr/Resource: Leah Coffman Council Action: 1 ORDINANCE Agenda Wording Project Name: Mays Street Reconstruction Phase 1 ContractorNendor: Huggins/Seiler & Associates, LP ED RESOLUTION 1 City Manager Approval CMA Wording Consider executing Supplemental Contract No. 7 with Huggins/Seiler & Associates, LP for the Mays Street Reconstruction Phase 1 Project. Attorney Approval IYAttorney Notes/Comments O:\wdox\SCCInts\0199\7301 \M I SC\00287515. XLS Updated 6/3/08 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 7 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HUGGINS/SEILER & ASSOCIATES, LP ("Engineer") ADDRESS: 116 East Main Street, Round Rock, TX 78664 PROJECT: Mays Street Reconstruction Phase 1 This Supplemental Contract No. 7 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Huggins/Seiler & Associates, LP, hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 10th day of November, 2011 for the Mays Street Reconstruction Phase I Project in the amount of $235,288.80; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on February 3, 2012 to amend the scope of services and to increase the compensation by $6,166.00 to a total of $241,454.80; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on April 26, 2012 to amend the scope of services and to increase the compensation by $324,195.00 to a total of $565,649.80; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on November 8, 2012 to amend the scope of services and to increase the compensation by $64,699.40 to a total of $630,349.20; and WHEREAS, the City and Engineer executed Supplemental Contract No. 4 on February 8, 2013 to amend the scope of services and to increase the compensation by $3,345.00 to a total of $633,694.20; and WHEREAS, the City and Engineer executed Supplemental Contract No. 5 on March 8, 2013 to amend the scope of services and to increase the compensation by $38,313.40 to a total of $672,007.60; and WHEREAS, the City and Engineer executed Supplemental Contract No. 6 on May 3, 2013 to amend the scope of services and to increase the compensation by $10,178.00 to a total of $682,185.60; and Supplemental Contract 0199.7301; 00287465 CM-13-\Z-Zy2 Rev.12/01/08 84275 WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $37,532.00 to a total of $719,717.60; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Il. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $37,532.00 the lump sum amount payable under the Contract for a total of $719,717.60, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. HUG GINS/SEILEi : ASSOCIATES, LP / �/ 'Huen 4 - By: II- 22-13 Date CITY OF ROUND ROCK By: Date r b-kortsx3d, City kleovo5eY Caltp 4iiI Sit 1/161 ✓�, APPROVED AS TO FORM: Supplemental Contract 0199.7301; 00287465 2 Rev.12/01 /08 84275 ADDENDUM TO EXHIBIT B Engineering Services The work to be performed under this contract shall consist of providing engineering services required for the development of PS&E for revisions to West Main Street from Blair Street to Mays Street. The PS&E will be developed for letting and construction by the City of Round Rock. Also included in this work is the revision of completed plan sheets for Traffic Control on Round Rock Avenue and the addition of Traffic Control plan sheets on Mays as required by the addition of the "Iimnortal X Bridge" motif In addition, completed Illumination sheets are to be revised to criteria required by the "Immortal X Bridge" motif. 1) COLLECT AND REVIEW DATA (Function Code 110): a) Data Collection: The Engineer will collect, review and evaluate: i) As-built plans, existing schematics, right-of-way maps, and current unit bid prices information. ii) Utility plans and documents from appropriate municipalities and utility companies. b) Field Reconnaissance: The Engineer will conduct field reconnaissance and collect data as necessary to complete the project development. 2) MISCELLANEOUS (ROADWAY) (Function Code 163) a) Prepare Traffic Control Plan, Detours and Sequence of Construction. i) Layouts. (1) Sequence of construction and method of handling traffic during each phase. (2) Existing and proposed traffic control devices for each construction sequence. (3) If detours are provided, typical sections and horizontal and vertical alignment shown on plan layout. (4) General Notes providing construction work hours and any conditions relating to the various construction phases. b) Prepare continuous Illumination Design i) Layouts. (1) Horizontal location of illumination poles. (2) Conduit location and size. (3) Conductor runs and size (4) Power drop locations (5) Special mounting details for bridges and retaining walls (6) Summary of Quantities (7) Standards 1 3) PROJECT MANAGEMENT (Function Code 190): a) Project Coordination: The Engineer will direct and coordinate the various elements and activities associated with project development. b) Project Administration: The Engineer will perform administrative duties, including: i) Coordination with subconsultants. ii) Preparing and executing contracts with subconsultants. iii) Monitoring subconsultant activities. iv) Reviewing and recommending approval of subconsultant invoices. Deliverables • Monthly progress reports. • Monthly invoice and billings. c) QA/QC: The Engineer will provide ongoing quality assurance and quality control to ensure completeness of product and compliance with City of Round Rock procedures. d) Progress Meetings: The Engineer will attend progress meetings with the City of Round Rock on an as needed basis. 2 0 0 ADDENDUM TO EXHIBIT C Work Schedule 2013 1 mfa Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 11 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 F 111 1 1 1 1 11 11 1111111111111111 H 1111 1111 1M111111111 1111111111 1111111111 1 I 1 l l 11 1111 •1 1 11 W1111111111 1 11 11111111111111 1 11 11111111111111 1 11 11111111111111 1 11 11111111111111 IL L 1 1101110111101 Total Project Time Environmental Document Preparation Prepare MUD Grant Environmental Documents Utility Coordination Assist Ctty with Utility Adlusnnent required Develop 601 Plans _� S jDevelop 901 Plans aa. 1 J tttttt "...Ara. Dan. drA�Me e 1 a 'a L S ...nn., Final PS&E Documents - Mylar Copy Project Ready for Letting ADDENDUM TO EXHIBIT D Fee Schedule Task Total Labor Hours Total Loaded Labor Cost Other Direct Costs Subconsultants TOTALS Task 1: (e.g. surveying) 0 $ - W 4.11 (!I V/ VI U () W (A 44 (4 (A (4 VI N 0 (// 4/ $ - Task 2: (e.g. right of way appraisal) 0 $ - $ - Task 3: (e.g_ subsurface utility engineering) 0 $ - S - Task 4: (e.g. environmental document preparation) 0 $ - $ - Task 5: (e.g. preliminary design/ 30% plans) 0 $ - $ - Task 6: (e.g. final design/ 60%, 90%, 100% plans) 324 $ 35,986.00 $ 35,986.00 Task 7: (e.g. bid phase services) 0 $ - Task 8: (e.g. construction phase services) 0 $ - $ - Task 9: (e.g. project management) 12 $ 1,546.00 $ 1,546.00 GRAND TOTAL: 336 $ 37,532.00 $ - $ - $ 37,532.00