Loading...
CM-14-02-309City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Change Order No. 1 with Muniz Concrete & Contracting, Inc. regarding the Brushy Creek Regional Trail Gap Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/7/2014 Dept Director: Rick Atkins, Director Cost: $42,102.00 Indexes: General Self -Financed Construction Attachments: 02_07_14_LAF -Brushy Creek Regional Trail Gap, 02_07_14_PARD_CM_Brushy Creek Regional Trail Gap Department: Parks and Recreation Department Text of Legislative File CM -14-02-309 Approval of this item allows the contractor to erect a permanent fence with modified fence material and allows for the concrete curb of the proposed parking lot to match the existing curb width. The project includes approximately 2 miles of 10' wide concrete trail from A.W. Grimes Blvd to the west end of the existing Brushy Creek East Trail behind the Sonoma subdivision. Additional project improvements include site furnishings, two (2) pedestrian bridges and trail head improvements (parking, bike locker and signage) at the Rabb Park. The project has funding from FHWA/TxDOT ($2,300,000), Williamson County ($400,000) and the City of Round Rock ($190,000). The construction contract is for 270 calendar days, which corresponds to construction completion in the Summer of 2014. Staff recommends approval of this item. City of Round Rock Page 1 Printed on 2/6/2014 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: PARD Project Mgr/Resource: Aileen Dryden []Council Action: ORDINANCE Agenda Wording Project Name: Brushy Creek Regional Trail Gap Contractor/Vendor: Muniz Concrete & Contracting Inc. RESOLUTION EICity Manager Approval CMA Wording Consider executing Change Order No. 1 with Muniz Concrete & Contracting Inc. regarding the Brushy Creek Regional Trail Gap Project. Attorney Approval Attorney ( Date 4 3 a(t Notes/Comments O:\wdox\SCCInts\0199\0001\MISC\00291666.XLS Updated 6/3108 Form2146-L (Rev.10/11) Page 1 of 1 CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: 1 1, CONTRACTOR: Muniz Concrete & Contracting Inc. 2. Change Order Work Limits: Sta. 15+59.75 to Sta. 34+32,21 3. Type of Change (on federal -aid non-exempt projects): Minor (Major/Minor) 4. Describe the change and the reason for the change order. When necessary, include exceptions to this agreement. CO#1 encompasses changing the proposed boundary fence from 5 -wire barb wire to 6' chain Zink fence with 3 strands of barb wire on top, along a specific land owner's property that is adjacent to the project. 5. New or revised pian sheet(s) are attached and numbered: n/a CCSJ: Project: Highway: County: District: Contract Number: Each signatory hereby warrants that each has the authority to execute th s Change Order. By signing this change order, the contractor agrees to waive any and all Balms for additional compensation due to any and all other expenses; additional changes for time, overhead and profit; or loss of compensation as a result of this change. Further, the contractor agrees that this agreement Is made In accordance with item 4 and the Contract. Exceptions should be noted in the response for I15 above. THE CONTRACTOR Date X By 01/23/14 Typed/Printed Name Lonny 0. Rodriguez Typed/Printed TitleVice President The following Information must be provided Time Ext. #: 1 Days added on this C.O.: 4 Amt. added by this change order: 521,856.50 For TxDOT use only: Days participating: Amount participating: Signature Date Name/Title RECOMMENDED FOR EXECUTION: Name/Titie Date Name/Title Date NamefTttle /jN'iwwa'y. Pa.Iic/ands. Date obr•6ry Name/Title Engineer's Seal: Cm- i -oa sog Name/Title APPROVED Date p REQUEST APPROVAL Name/Title [J APPROVED Date 0 REQUEST APPROVAL Name/Title APPROVED Date 0 REQUEST APPROVAL Date Name/Title ❑ APPROVED Date CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: 1 Estimated Cost $21,856.50 O Z r Paid by Invoice? TABLE A: Force Account Work and Materials Placed Into Stock HOURLY RATE m 0 m 5 OVERRUN/ II UNDERRUN 00 O S M 0 n °' M• 0 nt a - 0 4i 8 O 4, W ` N NEW I ITEM COST 0 o to O M 0 O 00750' 1. L 0 p 0 N O N i0.in a o o O o O ORIGINAL + PREVIOUSLY REVISED O u o O O O L fc 14 0.001 0 o toS i 0 Cf 0 o Lo 'I. 0 a M co TOTALS IUNIT PRICE 0 N 0o0 Mrsi 0 18.00] C 2 O J LL _-1 ILF LL _J J 2 0 E 6 D Furnish & install 1,350LF of 6' Galv. chain link w/3 strands barb wire Deduct qty of Wire Fence (TY C) originally to be installed IConcrete Curb (Ribbon)(MOD)(12") (incl. 85 LF for new center island) Deduct qty of Concrete Curb (Ribbon)(MOD)(24") — N M CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: 0 Ca' d e c 0 0 u E W z N c u° m Qw 1- 1 IOVERRUN/ UNDERRUN II o LA N 21,856301 Z I- 0 v 2 8-8 o 0 r4 ry vst i a m ORIGINAL + PREVIOUSLY REVISED ITEM COST 0 0 vi ill Ln vt 0 N.0 0 0 N N The 'Totals" from Table B of the previous work sheet TOTALS W U IX a t z D k z m DESCRIPTION 2 TXDOT Form 2146-L TAB (Rev. 10/11) Page 2 of 2