Loading...
O-90-2497 - 9/13/1990ORDINANCE NO. C7, l AN ORDINANCE AMENDING THE BUDGET FOR FISCAL YEAR 1989-1990 FOR THE GENERAL OBLIGATION BOND CAPITAL IMPROVEMENT PROGRAM; PROVIDING FOR A SAVINGS CLAUSE AND REPEALING CONFLICTING ORDINANCES AND RESOLUTIONS. BE IT ORDAINED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS: That the budget for fiscal year 1989-1990 for the General Obligation Bond Capital Improvement Program as shown in Exhibit "A" attached hereto and incorporated herein is hereby amended. A. All ordinances, parts of ordinances, or resolutions in conflict herewith are expressly repealed. B. The invalidity of any section or provision of this ordinance shall not invalidate other section or provisions thereof. READ and APP,VED on first reading this the OS� day of 19 READ,�� APPROVED( and ADOPTED on second reading this the K` - day of 19 MIKE ROBINSON, Mayor City of Round Rock, Texas ATTEST: J NNE LAND, City Secretary Bellaire Circle Improvements ALW ^8-7-90 , Prelim. Cost Estimate ^ Street Improvements � -------------------- __________________Street Excavation Street 1465 S.Y. @ $3.25 = $4,761.25 Flexible Base (15") 1465 S.Y. @ $7.50 = $10,987.50 Curb and Gutter 481 L.F. @ $5.00 = $2,405.00 Hot Mix Asphaltic Conc.(2")1192 S.Y. @ $4.00 = $4,768.00 Concrete Driveways 2070 S.F. @ $3.00 = $6,210.00 Curb Inlet (10') 1 each @ $2,000.00 = $2,000.00 ============== Subtotal = $31,131.75 Add 25% Engineering & Contingency = $7,768.25 Total = =============== $38,900.00 Water Improvements _________________6 -------------------- 6inch water line 325 L.F. @ $20.00 = $6,500.00 Water Service Lines 9 each @ $400.00 = $3,600.00 Fire Hydrant 1 each @ $1,600.00 = $1,600.00 Subtotal = ============== $11,700.00 Add 25% Engineering & Contingency = $2,925.00 ============== Total = � $14,62�.00 Project Total = $53,525.00 ============== DATE: September 11, 1990 SUBJECT: City Council Meeting, September 13, 1990 ITEM: 13.A. Consider an ordinance amending the Capital Improvements Budget to reflect improvements to Bellaire Circle. (Second Reading) STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: Bellaire Circle is badly in need of repair. This project was origionally scheduled to be included in the C.I.P. Funds were located to complete this work out of existing funds. The work includes curb, gutter and street replacement plus the replacement of a 2 inch water line and the installation of a fire hydrant. ECONOMIC IMPACT: The total project cost is estimated to be $ 53,525.00