O-90-2497 - 9/13/1990ORDINANCE NO. C7, l
AN ORDINANCE AMENDING THE BUDGET FOR FISCAL YEAR 1989-1990
FOR THE GENERAL OBLIGATION BOND CAPITAL IMPROVEMENT PROGRAM;
PROVIDING FOR A SAVINGS CLAUSE AND REPEALING CONFLICTING
ORDINANCES AND RESOLUTIONS.
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS:
That the budget for fiscal year 1989-1990 for the General Obligation
Bond Capital Improvement Program as shown in Exhibit "A" attached hereto
and incorporated herein is hereby amended.
A. All ordinances, parts of ordinances, or resolutions in conflict
herewith are expressly repealed.
B. The invalidity of any section or provision of this ordinance
shall not invalidate other section or provisions thereof.
READ and APP,VED on first reading this the OS� day of
19
READ,�� APPROVED( and ADOPTED on second reading this the K` - day of
19
MIKE ROBINSON, Mayor
City of Round Rock, Texas
ATTEST:
J NNE LAND, City Secretary
Bellaire Circle Improvements
ALW
^8-7-90
,
Prelim. Cost Estimate
^
Street Improvements
�
--------------------
__________________Street Excavation
Street
1465 S.Y.
@ $3.25 =
$4,761.25
Flexible Base (15")
1465 S.Y.
@ $7.50 =
$10,987.50
Curb and Gutter
481 L.F.
@ $5.00 =
$2,405.00
Hot Mix Asphaltic Conc.(2")1192
S.Y.
@ $4.00 =
$4,768.00
Concrete Driveways
2070 S.F.
@ $3.00 =
$6,210.00
Curb Inlet (10')
1 each @
$2,000.00 =
$2,000.00
==============
Subtotal =
$31,131.75
Add 25%
Engineering & Contingency =
$7,768.25
Total =
===============
$38,900.00
Water Improvements
_________________6
--------------------
6inch water line
325 L.F.
@ $20.00 =
$6,500.00
Water Service Lines
9 each @
$400.00 =
$3,600.00
Fire Hydrant
1 each @
$1,600.00 =
$1,600.00
Subtotal =
==============
$11,700.00
Add 25%
Engineering &
Contingency =
$2,925.00
==============
Total =
�
$14,62�.00
Project Total
=
$53,525.00
==============
DATE: September 11, 1990
SUBJECT: City Council Meeting, September 13, 1990
ITEM: 13.A. Consider an ordinance amending the Capital Improvements
Budget to reflect improvements to Bellaire Circle.
(Second Reading)
STAFF RESOURCE PERSON: Jim Nuse
STAFF RECOMMENDATION: Bellaire Circle is badly in need of repair. This
project was origionally scheduled to be included in the C.I.P. Funds were
located to complete this work out of existing funds. The work includes curb,
gutter and street replacement plus the replacement of a 2 inch water line
and the installation of a fire hydrant.
ECONOMIC IMPACT: The total project cost is estimated to be $ 53,525.00