Loading...
O-90-2493 - 8/9/1990ORDINANCE NO. a q 93 AN ORDINANCE AMENDING THE BUDGET FOR FISCAL YEAR 1989-1990 FOR THE GENERAL OBLIGATION BOND CAPITAL IMPROVEMENT PROGRAM; PROVIDING FOR A SAVINGS CLAUSE AND REPEALING CONFLICTING ORDINANCES AND RESOLUTIONS. BE IT ORDAINED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS: That the budget for fiscal year 1989-1990 for the General Obligation Bond Capital Improvement Program as shown in Exhibit "A" attached hereto and incorporated herein is hereby amended. II. A. All ordinances, parts of ordinances, or resolutions in conflict herewith are expressly repealed. B. The invalidity of any section or provision of this ordinance shall not invalidate other section or provisions thereof. READ, PASSED, and ADOPTED on first reading this day of 19 Alternative 2. AD and APP O,VED on first reading this the day of 19 . READ, APPROVED and ADOPTED on second reading this the day of 19�D MIKE ROBINSON, Mayor City of Round Rock, Texas ATTEST: NNE LAND, City Secretary TOWER DRIVE -- CONSTRUCTION COST ESTIMATES OPTION A UNITS QUANTITY COST/UNIT PRICE STREET EXCAVATION SQUARE: YARDS 2900 $3.25 $9,425.00 FLEXIBLE BASE (15") SQUARE: YARDS 2300 $7.50 $17,250.00 H. M. A. C. (C') SQUARE YARDS 2300 $4.00 $9,200.00 CONC . CURB & GUTTER LINEAR FEET 1 300 $5.00 $6,500.00 CONCRETE DRIVEWAYS SQUARE FEET 3000 $3.00 0 $9,0 i0.0c) REST. & REVEGETATION SQUARE YARDS 500 $1.00 $500.00 CURB INLET (10') EACH 2 $2,000.00 S4,000.00 R.G.P. (1.8") LINEAR FEET 70 $35.00 $2,,450.00 STREET REPAIR LINEAR FEET 70 $15.00 $ 1 , 05� i . � 0 SUBTOTAL $59, X575. 0( ) CONTINGENCY (10%) $51937.50 TOTAL OPTION A $65,312.50 OPTION B UNIT'S QUANTITY COST/UNIT PRICE STREET EXCAVATION SQUARE YARDS 675 $4.00 — S1,700.00 FLEXIBLE BASE (15") SQUARE:: YARDS 675 $8.00 $5,000.0) H. M. A. C. (2") SQUARE YARDS 67 $5.00 $3,375.00 CONC. CURB & GUTTER LINEAR FEET 100 $15.00 $1,500.0C) STREET REPAIR LINEAR FEET 70 $15.00 $1,050.00 R.C.P. (1.8") LINEAR FEET 70 $35.00 $2,450.00 CURB INLET (10') EACH 2 $2,000.00 $4,000.00 SEAT.... COAT SQUARE: YARDS 1650 $1.00 $1,650.00 SUBTOTAL_ $22,125.00 CONTINGENCY (10%)l $2,212.50 TOTAL OPTION B $24,337.50 I I OPTION C UNITS QUANTITY COST/UNIT PRICE— : TOTAL OF OPTION B ABOVE ------------------_.----_---_------ — —_$22,125.00 ADDITIONAL EXCAVATION SQUARE YARDS 300 $4.00 i $1,2 0.0i ADDITIONAL CURB AND GUTTER LINEAR FEET 370 $6.00 $2j220.00 CONCRETE: DRIVEWAYS SQUARE FEET 1000 $3.00 $3,000.00 RESTORATION AND REVEGETAT I ON SQUARE YARDS 250 $1.00 $250. Oc i SUBTOTAL $29,795.00 CONTINGENCY (10%) $2,979.50 TOTAL OPTION C x31,674.50 EXHIBIT "A" ================================= OPTION D ================================= UNITS QUANTITY COST/UNIT PRICE _____________________________________________________________ ________�______ STREET EXCAVATION SQUARE YARDS 400 $5.00 $2,000.00 FLEXIBLE BASE (15") SQUARE YARDS 400 $8.00 $3,200.00 H.M.A.C. (2") SQUARE YARDS 400 $5.00 $2,000.00 ============================================================================ SUBTOTAL $7,200.00 CONTINGENCY (10%) $720.00 TOTAL OPTION D $7,920.00 NOTES: OPTION A ESTIMATE IS FOR THE RECONSTRUCTION OF THE ENTIRE LENGTH OF TOWER DRIVE (APPROXIMATELY 750 L.F.) FROM MAYS TO DIXIE. THIS OPTION IN- CLUDES REMOVING AND REPLACING THE EXISTING CURBS, BASE AND ASPHALT AS WELL AS THE INSTALLATION OF STORM SEWER INLETS AT MONTCLAIR AND ASSOCIATED STORM SEWER PIPING. OPTION B ESTIMATE IS FOR THE RECONSTRUCTION FROM LIP OF GUTTER TO LIP OF GUTTER FROM MAYS TO APPROXIMATELY 225' EAST OF MAYS. NO CURB REPLACEMENT IS ALLOWED FOR IN THIS OPTION. THIS OPTION INCLUDES THE DRAINAGE IMPROVEMENTS OUTLINED IN OPTION A, A SMALL AMOUNT OF CURB REPLACEMENT JUST EAST OF MONTCLAIR AND SEAL COAT OF THE REMAINDER OF TOWER DRIVE. OPTION C ESTIMATE IS THE SAME AS OPTION B BUT INCLUDES REPLACING CURB AND GUTTER AND DRIVEWAY APPROACHES FOR THAT PART OF TOWER PROPOSED FOR RECONSTRUCTION IN OPTION B. OPTION D ESTIMATE IS FOR REMOVING AND REPLACING CERTAIN AREAS THAT ARE EXHIBITING FAILURE (ALLIGATOR -TYPE CRACKING). THIS IS A "MAINTENANCE -TYPE" ALTERNATIVE AND THE FINAL PRODUCT WOULD HAVE A "PATCH -WORK" TYPE OF APPEARANCE. EXHIBIT "I\" SOUTH CREEK DRIVE IMPROVEMENTS Construction Cost Estimate: Remove & Replace 750 L.F. Curb & Gutter @ $ 12.50/L.F. =$ 9,375.00 3 Ea Valley Gutter @ $3000.00/Each =$ 9,000.00 1 Ea Valley Gutter Wings @ $1000.00/Each =$ 1,000.00 6 Ea Raise Existing Manhole to Finished Grade @ $ 200.00/Each =$ 1,200.00 2250 S.Y. Pavement Milling @ $ 3.00/S.Y. =$ 6,750.00 1020 Ton Hot Mix Level -up & Overlay 1 L.S. Striping & Buttons 7000 S.Y. Seal Coat SCkImp/jn EXHIBIT "A" $ 30.00/Ton =$30,600.00 $1,000.00/L.S. =$1,000.00 $ 1.00/S.Y. =$ 7,000.00 + 10% Contingency Total $65,925.00 $ 6,592.50 $72,517.50 CITY OF ROUND ROCK, TEXAS CAPITAL IMPROVEMENTS BUDGET 1989-90 AMENDMENT 26 -Jun -90 ITEM 6) FUNDING SOURCE Tower Drive Improvements CO` 1//985-A G.O. Street Improv Bonds South Creek Drive Improvements 1985 G.O. Street Improv Bonds 1985-A G.O. Street Improv Bonds Total Amendments EXHIBIT "A" BUDGET 3 1 $72,518.00 DATE: August 7, 1990 SUBJECT: City Council Meeting, August 9, 1990 ITEM: 8A. Consider an ordinance amending the Capital Improvements Budget to include certain road improvements. (Second Reading) STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: Two roads in Round Rock are badly in need of repair. These roads are South Creek Blvd. and Tower Drive. The funds are available for these projects. Please see the attached cost estimates.