Loading...
R-03-12-04-8D1 - 12/4/2003RESOLUTION NO. R -03-12-04-8D1 WHEREAS, it has been determined by the City's engineering staff that it is necessary to install a 16" by-pass water line at the City's South Creek Pump Station, and WHEREAS, the City Council hereby determines that the installation of said water line is necessary to preserve or protect the public health or safety of the City's residents, and therefore falls within an exception of the State's bidding requirements, and WHEREAS, Cunningham Constructors Associates, Inc. has submitted a Proposal to provide said services, and WHEREAS, the City Council desires to accept said Proposal from Cunningham Constructors Associates, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a Proposal from Cunningham Constructors Associates, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 4th day of December, 2003. @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R31204D1.WPD/Sc MAXWELL, Mayor of Round Rock, Texas AT EST: CHRISTINE R. MARTINEZ, City Secretar To: Jeff Bell City of Round Rock 2008 Enterprise Dr. Round Rock, Texas 78664 Phone number: (512) 801-4461 Fax number: (512) 218-5563 Date: November 7, 2003 "Proosal From: Charlie Cunningham Constructors Associates, Inc. P.O. Box 2237 Georgetown, Texas 78627 Phone number: (512) 775-7482 Fax number: (512) 869-0728 Subject: South Creek Pump Station, City of Round Rock Installation 16" water line to interconnect the 24" water main which supply water to ground reservoir than to 24" water main on the discharge of pump station. The 24" water main for fill of ground reservoir will be wet connection. Will include 24" MJ Tee with one solid sleeve and one steel coupling for cut -in. The 24" water main discharge from pump station will be hot tap. Will include 24" X 16" steel fu11 body tapping saddle rate at 225 psi working pressure and one 16" tapping valve. TEXAS HOT TAP INC. — 1 L.S. 1,340.00 ALAMO TRANSPORTATION ( ui meet mobilization 1 L.S. 1,500.00 1 L.S. 1,440.00 Total Subcontractor Cost 32 hours 24 hours 44.50 58.10 1,424.00 1,394.40 24 hours 2 day 63.00 86.40 1,512.00 172.00 3 da 74.00 222.00 3 da tE 61.00 183.00 4 da 72.00 288.00 Total Equipment Cost 5,195.40 This proposal will not include relocation any existing utilities, that maybe conflict with installation 16" bypass water line or repairs of existing underground utilities which were not identify their location by city. Should you have any questions, or if I might be of further assistance, please do not hesitate to can me at (512) 775-7482. Page 2 of 3 Approval to proceed for above mention material and service will take 30 calendar days for completion. Completions of project and with site clean up completed, pay request will be submitted for above mention agreement price. Sincerely, Cunningham Constructors and Associates, Inc. Charlie Carlisle Project Manager the above prices, specifications and conditions are satisfactory and are hereby accepted. Accepted: Nyle Maxwell, Mayor City of Round Rock Page 3 of 3 it-- - --- - - -- -- -- �o _....., .- ..rte. .- } 't, r•` 's 9 1 rte, '. Al TAREA ' lu ul uj tr cera .'_ ,. , 't C i.. p. r7r �. 5 • 4 �: . . r i DATE: November 25, 2003 SUBJECT: City Council Meeting - December 4, 2003 ITEM: 8.D.1. Consider a resolution authorizing the Mayor to execute a Proposal with Cunningham Constructors & Associates, Inc. for equipment, materials and installation of the Southeast 16" Water Line Bypass Improvements. Resource: Tom Word, Chief of Public Works Operations Tom Clark, Director of Utilities History: While attempting to remove the South East Ground Storage Tank from service for painting, we discovered that due to existing water demands in the southeast quadrant of the City's water distribution system, severe water shortages would occur if the pump station were to become inoperable. In order to correct this and deliver adequate water pressure and fire flows to this area of town the proposed by-pass line is required. If the southeast ground tank and pump station were to become disabled for any reason, we would lose the ability to provide adequate fire flows to the southeast quadrant of our water distribution system within eight hours. The timely completion of these improvements is critical to the public health, safety and welfare. Therefore, we requested proposals from three firms that had successfully completed similar projects for the City. The lowest responsible proposal was from Cunningham Constructors & Associates, Inc. Funding: Cost: $38,951.00 Source of funds: Capital Project Funds (Self -Financed Utility) Outside Resources: HDR Engineering, Inc. Impact/Benefit: To provide adequate fire flows to the Southeast quadrant of town. Public Comment: N/A Sponsor: N/A EXECUTED DOCUMENT FOLLOWS T i rruvosal To: Jeff Bell From: Charlie Carlisle City of Round Rock Cunningham Constructors Associates, Inc. 2008 Enterprise Dr. P.O. Box 2237 Round Rock, Texas 78664 Georgetown, Texas 78627 Phone number: (512) 801-4461 Phone number: (512) 775-7482 Fax number: (512) 218-5563 Fax number: (512) 869-0728 Date: November 7, 2003 Subject: South Creek Pump Station, City of Round Rock Installation 16" water line to interconnect the 24" water main which supply water to ground reservoir than to 24" water main on the discharge of pump station. The 24" water main for fill of ground reservoir will be wet connection. Will include 24" MJ Tee with one solid sleeve and one steel coupling for cut -in. The 24" water main discharge from pump station will be hot tap. Will include 24" X 16" steel full body tapping saddle rate at 225 psi working pressure and one 16" tapping valve. Pagel of 3 This proposal will not include relocation any existing utilities, that maybe conflict with installation 16" bypass water line or repairs of existing underground utilities which were not identify their location by city. Should you have any questions, or if I might be of further assistance, please do not hesitate to call me at (512) 775-7482. Page 2 of 3 Approval to proceed for above mention material and service will take 30 calendar days for completion. Completions of project and with site clean up completed, pay request will be submitted for above mention agreement price. Sincerely, Cunningham Constructors and Ass iates, Inc. Charlie Carlisle Project Manager The above prices, specifications and conditions are satisfactory and are hereby accepted. Accepted: ,iviaxwen, Mayor of Round Rock Page 3 of 3