Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
R-03-12-18-8E3 - 12/18/2003
RESOLUTION NO. R -03-12-18-8E3 WHEREAS, the City of Round Rock has previously entered into an Agreement for . Engineering Services ("Agreement") with Rodriguez Transportation Group, Inc. for preliminary schematic design for the Chisholm Trail and Chisholm Parkway Extension Project, and WHEREAS, Rodriguez Transportation Group, Inc. has submitted Supplemental Agreement No. 1 to the Agreement to extend the contract date, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 1 to the Agreement with Rodriguez Transportation Group, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 1 to the Agreement with Rodriguez Transportation Group, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as .required by the Open Meetings Act, Chapter 551, Government Code, as amended. RESOLVED this 18th day of December, City WELL, Mayor Round Rock, Texas AT ' T JU&YUJk • nq&LU . CHRISTINE R. MARTINEZ, City Secr tart' :�PEDesktCep\::ODW./WORT,DOX/O:/WDOX/RESOLUTI/R31218E3.WPD/SC Texas STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES FOR CHISHOLM TRAIL AND CHISHOLM PARKWAY EXTENSION This Supplemental Agreement No. 1 for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Rodriguez Transportation Group, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinaf- ter called the "Agreement", on January 23, 2003 to prepare a design schematic and construction plans for the Chisholm Trail reconstruction and Chisholm Parkway extension projects; and WHEREAS, Article 3, Contract Period, requires the termination of the Agreement on Decem- ber 31, 2003 unless the Agreement is extended; NOW THEREFORE, premises considered, the City and the Engineer agree that said Agree- ment is amended as follows: I. Article 2, Scope of Services to be Performed byEn ig'neer is amended in accordance with the Re- vised Exhibit C -Work Schedule, attached hereto and incorporated herein. II. Article 3, Contract Term shall be amended as set forth below: (1) Term. The Engineer is expected to complete the work in accordance with the above described Work Schedule. If Engineer does not performed the work in accordance with the Work Schedule, then City shall have the right to terminate this Agreement as set forth below in Article 18. So long as the City elects not to terminate this Agreement, it shall continue from day to day until such time as the work is completed. Any work performed or costs incurred after the date of termination shall not be eligible for reimbursement. Engineer shall notify City in writing as soon as possible if he/she/it determines, or reasonably anticipates, that the work will not be completed in accordance with the Work Schedule. (2) Work Schedule. Engineer acknowledges that the Work Schedule is of critical im- portance, and agrees to undertake all necessary efforts to expedite the performance of the work required herein so that construction of the project will be commenced and completed as sched- uled. In this regard, and subject to adjustments in the Work Schedule as provided in Article 2 herein, Engineer shall proceed with sufficient qualified personnel and consultants necessary to fully and timely accomplish all work required under this Agreement in a professional manner. 59911 Supplemental E7:1 Supplemental Agreement Rev. 412/03 Page 1 of 3 IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agree- ment No. 1 in duplicate. RODRIGUEZ T NSPOR TION GROUP, INC. By: /r Mark Rodriguez, Proident 42--03-2.-3 Date CITY OF ROUND ROCK LE Nyle Maxwell, Mayor Date 59911 Supplemental Agreement Page 2 of 3 Rev. 4/2/03 59911 Supplemental Agreement REVISED EXHIBIT C WORK SCHEDULE (See attachment) Page 3 of 3 Rev. 4/2/03 i 2 6 N_ I U 2 w O ¢e mn 7 OV 2 mm O f U N ---------------------- ------------------------------ - P m� --------------------------------- ------------ ------------------- 3 ti aN m r:. ti N m tN PALL Y m { 2 d < n U� Sg Yn O S'H y �6 a O H = J C1 --------------- --------------- --------------- Ills io, sill-, U ¢ 6 <N V� < �N a a i^ wN < O p O a� 4 awc� �b 8 < U U 6 m� 3 W W N O m� 3 W ON 2 m M O f U N ¢e m� 3 ~nN W --------------------------- -------------------------------- --------------------- ------------------- M ------------ f 7 n I TI u '<N a p F f W� Z Y J � O � W 3 US OJ UN x Y� mYLLS i x w3 r WF Z 3 a o x ---------------- - -------- ---------------- ---------------- --- --------- ------------------ ---------------- ----------- m 2 J P) U Q a <N a �N Y e 6 W N Y Lm N 9 a� Y 4 p --- Jimo as a asg sill Q:a W' Y O _ N O W E >% O cz .r_ n co z O _LO O co a� bbl w'1ONS1H0 V W Z ♦ � �� III ♦� NO i 0— ♦� � �I�♦� �`III • �' ���+D.+`��i�,�i��'\\\f,\�\\�.o%=-� Qllrrt�ur 1 t� /��tltt ;,, �� y�i�$� 2 r��\\\tt�����o•nn+�i��r �i �'� _�l►Ulo' � tttt► qtr ♦ ,��1�1► � � . �►�,�s����rr*rrr rrr r*i r►•+r' o. �tnt�`r••r� Ji./11..r� . ��irir',i���!�M� :s 9 tlttt AAtt1r . P-20r�plow- Owl, t ._..111► i , �.rtlA� , / ■■►��� Owl, /�ttt` rrr w •a• r►�I�' �,•v° .�•••.y...tri► � � • / ■r�• �' ��` •� .�.r.i � � I � t��` r♦•s i• •••�•..,. �►� r1 Ott Mv IM � +�� ���� �� t���♦�' � .mow � '`, ���� ♦t s♦,•r r•O •i�i•r rr f\I� tr'�r ♦1 . � . .a ��t •. r+fir �� I � '���- . r • ♦ rr � \ a. . rs.. r • s •� Ot r' tri 1 ami ���iii �:i�+1•. ��it rQ r rpt� ��►♦ ' � ��N�►D�•it ri ii i•i':ii� �I��I +�,ft�\��� �,r�� r i :Nl�i Ul/I.•.v i a ♦.♦ •• � V ♦ r. • s� f i._1 ♦ I♦I�... �►��t,� � L .♦ • ♦ �� �t �� . '. ♦•s ••• .i i• r.•♦ • Sys • ♦ .� . �t . •.:������ �� '►�•)♦ .�• �� p� ptt�t• S 1 r ���siG i�GG�•.�rr Qt .'�"♦ ♦ ♦II 11�... �►t .U+ .:� �♦•I ♦• ♦ A •r i O • �, � I.�♦•;r r♦.•♦. • ��, ,t11► +►•� 1♦�11�1��:p �����1 �il���:.� ►�► t� ��r�t� ,rte�r �♦ tt r s.♦ .• ♦ ��i�i�::,;iii•tit ♦ ����''�•�:��::'ittt�►� �� �i r ��. tt tt-•• I♦ ♦ •�r rt uyi� �• t�t��ri. ratty t��:•�i� •�� � ��f���S•��a1 `�, �� / 1��� ♦1�♦111�� •r► � ,� ♦ 1� 11 ♦ ♦ .� �ttl IIIc vj`►� . •r .. ♦•• � � � �'♦�.- ,� � ♦ �i i ..���►tat�i r�tr�►��00 i � �1♦�� ,�� �■j�Ij11♦♦�♦ ■�.� X111 I/• tr. ../♦tt aa�►,�D�� �+ot� _ _ s � � i► ��♦1♦i�� 1�■■■ �trt�/ � �i�jl�ta,,`��V``;•���D� +��•i i rrr►: � �■■� ♦ir►�♦ ♦ ��`.�■►♦I r � �•,���r v.��v++ ��.���I �� �rrrr ■rr■r�■r■■■■� � 1 r pa• • Its �♦� rr;.♦ ♦ � f,� j ���:� .191110 �♦ \� �♦1� �♦�♦� '+� . � fir'� ►.D�.,.:►•iii trt� ��, �i. ��•� ♦ r 10 ��-•tt _ ..r•_.�.. ����_.a�..�.�r��.�.a►��1 �..SERVEjwE ► /�.ii% IIlli + n Chisholm • • rE.XA Sam Bass ' • . • to FM 3406 KNIM DATE: December 12, 2003 SUBJECT: City Council Meeting - December 18, 2003 ITEM: *8.E.3. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 1 to the Agreement for Engineering Services with Rodriguez Transportation Group, Inc. for preliminary schematic design for the the Chisholm Trail and Parkway Extension. Resource: Tom Word, Chief of Public Works Operations Tom Martin, Director of Transportation Services History: The City is developing a project to rebuild and widen Chisholm Trail from Sam Bass Road to FM 3406 and extend Chisholm Parkway from IH -35 to Chisholm Trail. The current contract with Rodriguez Transportation Group, Inc. will expire on December 31, 2003. Supplemental Agreement No. 1, if approved, will extend the contract period for 1 year. Funding: Cost: N/A Source of funds: N/A Outside Resources: Rodriguez Transportation Group, Inc. Impact/Benefit: This project was will provide much needed improvements to Chisholm Trail and Chisholm Parkway. Public Comment: N/A Sponsor: N/A EXECUTED DOCUMENT FOLLOWS STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES FOR CHISHOLM TRAIL AND CHISHOLM PARKWAY EXTENSION This Supplemental Agreement No. 1 for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Rodriguez Transportation Group, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinaf- ter called the "Agreement', on January 23, 2003 to prepare a design schematic and construction plans for the Chisholm Trail reconstruction and Chisholm Parkway extension projects; and WHEREAS, Article 3, Contract Period, requires the termination of the Agreement on Decem- ber 31, 2003 unless the Agreement is extended; NOW THEREFORE, premises considered, the City and the Engineer agree that said Agree- ment is amended as follows: I. Article 2, Scope of Services to be Performed by Engineer is amended in accordance with the Re- vised Exhibit C -Work Schedule, attached hereto and incorporated herein. H. Article 3, Contract Term shall be amended as set forth below: (1) Term. The Engineer is expected to complete the work in accordance with the above described Work Schedule. If Engineer does not performed the work in accordance with the Work Schedule, then City shall have the right to terminate this Agreement as set forth below in Article 18. So long as the City elects not to terminate this Agreement, it shall continue from day to day until such time as the work is completed. Any work performed or costs incurred after the date of termination shall not be eligible for reimbursement. Engineer shall notify City in writing as soon as possible if he/she/it determines, or reasonably anticipates, that the work will not be completed in accordance with the Work Schedule. (2) Work Schedule. Engineer acknowledges that the Work Schedule is of critical im- portance, and agrees to undertake all necessary efforts to expedite the performance of the work required herein so that construction of the project will be commenced and completed as sched- uled. In this regard, and subject to adjustments in the Work Schedule as provided in Article 2 herein, Engineer shall proceed with sufficient qualified personnel and consultants necessary to fully and timely accomplish all work required under this Agreement in a professional manner. 59911 Supplemental Agreement Rev. 4/2/03 Pagel of3 IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agree- ment No. 1 in duplicate. RODRIGUE71SP71ON GROUP, INC. By: Avlark Rodriguez, Proident CIT IM 12 -').3 - z.-3 Date Date 59911 Supplemental Agreement Page 2 of 3 Rev. 4/2/03 59911 Supplemental Agreement REVISED EXHIBIT C WORK SCHEDULE (See attachment) Page 3 of 3 Rev. 4/2/03 EXHIBIT C PHASE 1 WORK SCHEDULE FOR CHISHOLM TRAIL/CHISHOLM PARKWAY TASK JANUARY FEBRUARY2003 MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER PHASE 1 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 OCTOBER 4 ' NOVEMBER 4 1 DE2CEMBER 4 1 ROW Data/Field Survey to Established SuryControl lb Collect/P re Detailed j2pographic Data 1c Collect/11 to Uvirry and Propeq Data Id Devel ROW M s 2 Geotechnical Studies,41aport 3 Deve Environmental Document 4Desi n Schematics 4a Preiimina Horizontal&Vertical Alicnments 4b Prelimina H draulic Studies 4c Prelmina P sed ROW 4d Ci Of Round Rock Review/ royal PHASE2 1 ROW Data/Field Survey 12 Conduct Subsurface Utility Identification as needed 2 Construction Documents - 2a Final Horizontal&Vertical Ali nments 2b Final H draulic Studies 2c Miscellaneous Plans 2d Ci of Round Rock Review/ oval 3 A Coordination 4 Construction AdvertisenenVLetting 5 Construction Services Phase s i n N D Z 2 O rD m 1 D_ � �i m � N S N � � = 7C Ci � � � _ s' "' � v s m n N 2 O = D <> m �m N ros O rA MAC W O n m 9 a D c a m s 1 ©101©IB®00©180 10000�1DI©10A090 111111111111111111111111 111 110 111111111111111111111111.111••11 11111111111111111111111111111© 111111111111111111111111.111 11111111111111111119MINE --IIA 111111111111111111' I 111111 l0 11; 11111111111111111INE I IIIIIII 11 11111111111111111199 1 MINE 11 1111111111111111171 1 111 111 ID 111111111111111124 1 111 111 11, 1111111111111111 1 111 111 ID IIIIIIIIIIIIII I ?11 IL,11 1 111 111 11 1111111111111111111 11111 111 10 IIIIIIIIIIIIIIIA111 11111 111 1©; 111111111111E 1111111111111 111 1© 111111111111. 111111111111 111 11 IIIIIIII��f 11111111 1111111/ ] 17 1r 1:111111111111 111111111111 111111111111 111 111 111 ID 1© 11 111/111/ �E .� 1� 111111111111 111 ID 1111 111{ "I" 111111111111111 111 ID 1111 111*`t 111111111111111 111 11 1111 IIh a 111111111111111 111 11 1111 1111 111111111111111 111 ID 1111111901 11111 11111 111 ID 1111111 51 111111111111111 111 1© 111111111 111111111111111 111 ID m11111f mimm�nn n1 ID 111111111 111111111111111 111 ID 111111111 111111111111111.111 11 111111 X111 11111111111111III I ID IIIIIA111 111111111111111 111 11 1111 1111111111111111111111111110 111111111111111 11111111111 1111 111111111111111111111111111; 1111 111111111111111111111111111 111111111111111111111111111111110 11111111111111111111111111111EN 11111111111111111111111111111111�� Illllllllllllllllllllllllllllllla 111111111111111111111111111111110 1111111111111111111111111111 MIN 11111111111111111111111111111111�: 11111111111111111111111111111111� 111111111111111111111111111111110 11111111111111111111111111111111� 11111111111111111111111111111111�. 11111111111111111111111111111111a