R-03-12-18-8G7 - 12/18/2003RESOLUTION NO. R -03-12-18-8G7 WHEREAS, the City of Round Rock has duly advertised for bids for the 2002-2003 Wastewater Collection System Rehabilitation Project of Edwards Aquifer Basins OC31, CC36 & LC09, and WHEREAS, only one bid was received, therefore the Council has determined that the bid received should be rejected and the project should be re -bid, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the only bid received for the 2002-2003 Wastewater Collection System Rehabilitation Project of Edwards Aquifer Basins OC31, CC36 & LC09 is hereby rejected and the project should be re -bid. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 18th day of December, 2003. iV,) PIA WE'LL, Mayor City of Round Rock, Texas ATT ST: J.Ah;1rU))e. CHRISTINE R. MARTINEZ, City Sec etary 9PFDesktop\::ODMA/WORLDOX/O:/WDOX/RSSOLUTI/R31218C7.WPD/sc 12/11/2003 10:32 FAX 5122185563 CORR PUBLIC WORRS 4 CITY HALL 10004 MERJN GROUP, INC. Engineering and' h ii'ormadon 7 echnolagy SBrvkw An Emp/oyso-aweed Firm December 1, 2003 Mr. Michael Thane, P.E Engineer Public Works Department 2008 Enterprise Dr. Round Rock, TX 78664 Subject: 2003 Wastewater Collection System Rehabilitation Project Basins OC31-Z, CC36-Z, and LC09 -- RJN #18185200 Dear Mr. Thane: Enclosed please find the bid tabulations for the above reference project. Proline Technologies is the only contractor who submitted bid for this project. Their total bid price of $934,174.11 is 43.31% higher than our estimate of $656,45 S. Since only one bid was received and the price is much higher than the estimate, we recommend that the city rejects the bid and rebid the project in two units: one for the conventional open cut and one for the chemical grouting. Should you have any que ;tions, please let us know. Sincerely, a Peter Lai, P.E. Associate RJN Group, Inc. Cc: 18185200 12160 Abrams Road, Suite 206 . Dallas. Texas 75243 Phone 9771437-4300 - Fax 9721437-2707 . www.ijn.com DEC -11-2003 10:51 5122185563 98% P.04 12/11/2003 10:32 FAX 5122185563 CORR PUBLIC WORKS -+ CITY HALL 10 005 ROUND ROCK, TX: 2002-2D03 WASTEWATER COLLECTION SYSTEM PROJECT BASINS OC31-Z C06 -Z, AND LC09 &N Proline RJN jPmge --- ITEM Price Price roar Total NO. DESCRIPTION UNIT (S) (S) Total Price (S) met (s) yr r yN�J.,��; ;!��;�, �'iil'1o.8f1�1'rr x'I��. u'd(S7't r errF'`'�u I dIothaM1d ....., 1 't�1t,A�f 'I 4,1 ' I �Ird�;ti�Yv�, �!fidiRd'IVC'UIr. 'i�i d.I','�rd'i iJirJr„,+i,:All'Ir,ilw4r.;7G�i ipledid �Ff!�,irxF.hl�''rf. ?�;�%��'i� A5 l ,,, .'�j.��h,'!Fyi4.,.. �•,'ri1h .�4' Ir:f'ik.'�4�1k��'h�"�1r{p;�j4r1,4, 'ti��,.i .. .. ,.. 1 8" PVC SDR -26 SEWER PIPE W-6' DEEP, BY OPEN CUT LF 55 100.00 300 $16,500 30000 2 8' PVC SDR -26 SEWER PIPE G-10 DEEP, BY OPEN CUT LF GO 117.65 900 $41L000 94120 3 10' C1PP LINEA COMPLETE IN PLACE LF 70 72,00 335 $23,450 24120 4 REMOVE AND REPL.48' DEA. MANHC LE, 0'•6' DEEP INCLUDING EPDXY COATING EA 1000 7_000.00 8 524,000 56000 5 REMOVE AND REPL. 48- DIA. MANI'1CL1~ EXTRA DEPTH VF r , 280 352,94 10 $2,800 3529.4 6 6"PVC SEWER SFRVICE LINES 0-5 IV1 SERVICECLF,AN-OUT EA 550 3,470.59 r 4 52200 13882.36 7 G' PVC SEWER SERVICE LINE EXTENSION LF 301 131.76 50 51,500 658&00 8 ASPHALT STREET REPAIR LF 25 268.24 40 51,000 10729.60 9 CONCRETE CURB AND OUTTER REP 41R LF 30 136,47 20 $600 2729.40 to SEEDING-TOMATCH EXISTING SY 2 14.36 700 $1400 10052.00 11 TREE PROTECTION LS 2.000 7,98235 1 $2.000 7982.35 12 FENCE REPAIR LF 40 67.06 40 51,600 2682AD L3 TRENCI'1 SAFETY _ LF 5 &47 1076 55,360 6961.72 14 WDEO DOCUMENTATION LS 2,000 10,755-001 1 52,000 10755,00 15 Air less atd d mical M 42" omc. Sewer pipe m D2-14 oint lepeth is 7.11 LF 25 43.00 720 $18,000 30960.00 16 Air tertand chemical grout36'PVCSew ipe pa D2.14 (avemp icint IeuOh is 131 LF 20 23.00 6000 $12000 138000,00 17 Air test and chemld prout 24" cont. Sewe r lxpe per D2-14 joint leazth is 71 LF 16 27.00 2500 540,000 67500.00 is Chemical outsewmmm s2 toto42")direr! hmtd-held i ent txD2-14 EA 1,000 __.b140 00 4 _ S4.0001 4560.00 19 Chemical ¢rout (material only) Pa D2-14 Gal 10 10.00 12500 125,000 125000.00 20 REPLACE MANHOLE FRAME AND C')vE PER D2,2 MATERIAL ONLY) EA _ 265 1,088,24 25 S&625 27206,00 21 PAVED FRAME AND GRADE ADJUS-'MENT SEALING PER 02-1 CA 600 1,911.76 16 $9,600 30588.16 22 NON PAVED FRAME AND GRADE AI)JUSTMENT SEALING FER D24 EA 450 1,076.47 60 527,000 6458&20 23 CONCRETE MANi10LE GRADE ADJUSTMENTS (MATERIAL ONLY) PER 02-4 VF 105 470.59 15 S 1.575 7058.85 24 PARTIAL MANHOLE RL• PLACEMENI' PGR D2-5 VF 300 335.29 10 $3 000 3352.90 25 PRESSURE GROUT MANHOLE PER r2-7 JT 3001 200.00 115 534.500 23000.00 26 INTERIOR MANHOLE EPDX--Y COATI NG PER D2 -#A (MANHOLE REHAB ONLY) VF 150 150,50 85 $11,750 12792.50 PRESSURE GROUT PIPE SEAL BEN(31 AND TROUGH AND LOWER 18 INCHES OF MAHDLE PER 27 D2-7 EA 450 650.00 30 $13,500 19500,00 AL7DIT10NAL PIPE INSTALLED V,4R 75Z -1N DIAIytETfR-FROM 6" 1b 12'. COMPLETE IN FLAGL . INCW DING BACKFILL MATERLIL, SERVICE CONNECTIONS. COMPACTION AND SURFACE 28 RESTORATION IN PAVED AND NOA-PAVED AREAS PER 02J LF 90 311.76 50 $4,500 1558&00 29 INSTALL BOLTS FOR BOLT DOW14 COVERS ER LACH CO EA 100 18824 25 52,500 4706.00 30 IJOB NO.2001: 1 -SERVICE LATERAL TO PROPERTY UNE tw CLEANOUT LS 2 000 4.464.71 1 $2.000, 4464.71 3l JOB NO.2002.10 LF OF 8' SEWER LUTE LS 2,500 7,647,06 1 52500 7647.06 32 JOB NO. 2004-, 10 LF OF 8' SEWER U1iE LS 2,800 6,08&24 1 S"00 606&24 33 JOB NO.2005:25 LF OF I-SEWERLDdE (2 LOCATIONS ON THE SAME L1N6) LS 000 10,47059 1 $4,000 10470,59 34 JOB NO. 2006: 10 LF OF 18" SEWER LNE AND ONE (1) T DIA. SEWER MANHOLL REHAB LS 5,500 7,647.06 1 55.500 7647.06 35 JOB NOL 2007: 10 LF OF 18' SEWER LINE L5 1500 4,705.88 1 53,500 4705,88 36 1108N.. 2008ANSTALLATION OF A I IEPAIR CLAMP ON 18" DIA. SEWER LINE LS 3,000 6,05&82 1 $3,000 6058.82 37 JOB NO.2009: INSTALLATION OFA REPAIR CLAMP ON 18" DIA, SEwER LINE LS 3,000 6.058.82 1 $3,000 6058.92 38 JOB NO. 2010: INSTALLATION OF A REPAIR CLAMP ON 24' DIA. SEWER LINE LS 4,000 6,85.94 1 54,000 052.94 39 JOB NO. 2011: 40 LF OF 24" SEWER LINE L5 5,500 10,823.53 1 55300 10123.53 40 JOaNO. 2012:1OLFOF24-SEWER LINE LS 4.000 5.117.651 1 54,000 5117.65 at JOB NO 2013: 10 LF OF 8" SEWER UNE LS 2,000 3,705,88 I $21000 3705.8e TOTAL SS96,780 5934,174.02 10% CONTINGENCY 559,678.0 TOTAL COST 5656.458 5934 174 01 Page 1 or 1 DEC -11-2003 10:52 5122195563 98% P.05 12/11/2003 10:32 FAX 5122185563 CORR PUBLIC WORHS 4 CITY HALL 10 006 W g Y cn m U Z O �r-j ZJz O LL � 0 w -� aQ N E v o- � y n � � L y M ti 9 x y y N01 2Cy1 C O ON Q) co r°M 2._o"' U w�U O \ �fOF7.� N CJ m N 0 0 0= C V N N O d C O W O O(� C O R m rw+ N � .0 00 O O +' O N 4% " Z � f: 0 +� ?� — X O O C O.O.. � O 3 N cq N 'CED X00 r m "O Q ,— Z h ® ® 3 DEC -11-2003 10:52 5122165563 98% P.06 DATE: December 12, 2003 SUBJECT: City Council Meeting - December 18, 2003 ITEM: 8.G.7. Consider a resolution rejecting the bid for the 2002-2003 Wastewater Collection System Rehabilitation Project of Edwards Aquifer Basins OC31, CC31, and LC09. Resource: Tom Clark, Director of Utilities Michael Thane, Engineer History: Proline Technologies is the only contractor to bid on this project. Their total price of $934,174.11 is 43.31% higher than the engineer's estimate of $656,458. The engineer has recommended that the City reject this bid and re -bid the project in two units: one for the conventional open cut and one for the chemical grouting. Funding: Cost: N/A Source of funds: Outside Resources: RJN Group, Inc. Impact/Benefit: Because only one contractor submitted a bid on this project, the City and RJN would like to re -bid the project to receive a more competitive bid. RJN will revise the specifications for this project and separate the bid documents into two units. Because chemical grouting is a specialized way of repairing wastewater lines, the two units will allow more contractors the opportunity to bid on either unit and not prevent contractors from bidding because of the specialized chemical grouting section of the project. In addition, by re -bidding this project, the City's cost to rehabilitate the wastewater collection system should be reduced, which saves the City money. Public Comment: N/A Sponsor: N/A