R-06-12-07-11E1 - 12/7/2006RESOLUTION NO. R -06-12-07-11E1 WHEREAS, the City of Round Rock has duly advertised for bids for the Dell East Campus Channel Repair Project, and WHEREAS, Manley Contracting has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Manley Contracting, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Manley Contracting for the Dell East Campus Channel Repair Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 7th day of December, 2006. E , Mayor City of Round Rock, Texas -0%AATEST: CHRISTINE R. MARTINEZ, City S retary 0:\wdox\RESOLUTI\R61207E1.WPD/MC �R°o0 0 0 D GNT(1SS GE.Ga Z 0� N °t �0 2� m o �a A tm �1 A off` `"4r � oS �j Windy Park Subdivision Q o 00 00 0 0 00 0 o 0 EK�0OQ Manville Water Supply Corporation Fa1P�°�E Property o o� 0 0 LJ Dell East Subdivision c A Property m y �L O O Proposed Drainage Channel Improvements r_ x t i� 2s 0 N i sengmeannWcwncn mapu Proposed Drainage Channel Improvements /\( daii—drain Ryan annel_blue_sheet �, E P�wnBy. Ryan B `ND RDCIC�TDLIS Exibit A to Cost Participation Agreement between the City of Round Rock and Dell USA L.P. °^� Sergio M s �.: 09126/06 DATE: November 30, 2006 SUBJECT: City Council Meeting - Decemberl, 2006 ITEM: 11.E.1. Consider a resolution authorizing the Mayor to execute a contract with Manley Contracting for the Dell East Campus Channel Repair Project. Department: Engineering and Development Services Staff Person: Danny Halden, City Engineer Justification: This project includes the demolition and reconstruction of approximately 300 feet of a 45 - foot wide concrete drainage channel. Seven bids were received on November 28, 2006. Manley Contracting submitted the lowest bid of $ 166,385.00. After reviewing the bid the staff recommends the award of the bid. The Engineer's estimated cost for this project was $241,767. Funding• Cost: $166,385.00 Source of funds: 2002 G. O. Bonds Outside Resources: Alan Plummer Associates, Inc. Background Information: The City of Round Rock and Dell USA, L.P. will share the cost of the improvements in accordance with the Cost Participation Agreement authorized under R -06-10-12-11A1. In 1994/1995, the City managed a Texas Capital Fund Project that established public infrastructure around the developing Dell campuses. This project included drainage channel improvements from Gattis School Road through Windy Park Subdivision up to the Dell property along the east side of Greenlawn Boulevard. In 1998, Dell developed the east campus and established a retention pond east of Buildings 7 & 8. This pond discharges into the south end of the aforementioned channel. It appears that over time, water piping around the pond's outlet structure as well as the discharges over the pond spillway have undercut the concrete lining of the channel. Once the subgrade had eroded, it left an unsupported concrete channel lining. Subsequently, holes developed in various areas due to hydraulic forces, unsupported concrete weight, expansion/contraction cracking, and/or other reasons. Upon inspection of the failed areas, it appears that much of the reinforcing steel had not been properly placed within the concrete. Dell requested that the City participate in the channel repair by managing the contract for the repair and contributing to half of the cost. Public Comment: N/A