Loading...
R-06-12-07-11C2 - 12/7/2006RESOLUTION NO. R -06-12-07-11C2 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with RGM Constructors, L.P. for the A.W. Grimes, Phase II Construction Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 7, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 7 to the Contract with RGM Constructors, L.P. for the A.W. Grimes, Phase II Construction Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 7th day of December, 2 06. Netl�OWELL,� Mayo City of Round Rock, Texas 0:\wdox\RESOLUTI\R61207C2.WPD/Tmc ATTEST CHRISTINE R. MARTINEZ, City Secretary CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER Page 1 of 2 DEPARTMENT: Transportation Services DATE: 11/6/2006 PROJECT: A. W. Grimes Boulevard Phase 11 CHANGE ORDER NO: 7 JUSTIFICATION: Reference page 2 of 2 ORIGINAL CONTRACT PRICE: $4,978,357.76 PREVIOUS CHANGE ORDERS: $605,157.00 THIS CHANGE ORDER: $96,963.88 CHANGE ORDERS TO DATE: $702,120.88 CHANGE DATA DESCRIPTION OF UNIT ADDED DAYS ITEM # CHANGES UNIT QTY. PRICE AMOUNT CALENDAR/ WORKING 1 SANITARY SEWER MANHOLE EA 1 $5,100.00 $5,100.00 2 IRRIGATION ENCASEMENT, PVC 4" LF 218 $16.00 $3,488.00 3 GRAVEL MATERIAL FOR STORM EA 1 $34,450.00 $34,450.00 0 SYSTEM BEDDING $0.00 0 4 UNDER CUT ROADWAY AT GAS LINE EA 1 $9,572.00 $9,572.00 0 5 FUTURE IRRIGATION TAP EA 1 $2,200.00 $2,200.00 0 6 DRILL SHAFTS (30 -INCH) LF 215.91 $160.00 $34,545.60 0 7 CONSTRUCTION EXIT TYPE I SY 111.7 $8.00 $893.28 0 8 STEEL ENCASEMENT (24 -INCH) LF 3 $110.00 $330.00 0 9 RAISE BRAZOS RIVER AUTHORITY EA 1 $6,385.00 $6,385.00 7 EXISTING FIBERGLASS MANHOLE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL: $9 s,963.88 7 RED BY: SI ATURE PERCENT OF ORIGINAL CONTRACT PRICE (ENGIN ) DATE THIS CHANGE ORDER: $96,963.88 11/6/2006 PREVIOUS CHANGE ORDER: $605,157.00 SIGNATURE (CONT CTO ) DATE TOTAL % CHANGE TO DATE: 14.10% PRINTED NAME: Martin Morello ORIGINAL CONTRACT PRICE PLUS TITLE: Project Manager CHANGE ORDERS: $5,680,478.64 APPROVED: CITY OF ROUND ROCK DATE k.12gll cn O E E 0 UL DATE: November 30, 2006 SUBJECT: City Council Meeting - December 1, 2006 ITEM: 11.C.2. Consider a resolution authorizing the Mayor to execute Change Order No. 7 with RGM Constructors, L.P., for additional construction services in conjunction with A.W. Grimes Boulevard Phase II Project. Department: Transportation Services Staff Person: Thomas G. Martin, P. E., Director of Transportation Services Justification: Due to differing site conditions and utilities, additional funding is required for adjusting a waste water manhole, adding a waste water manhole, encasing irrigation and drilling the 30 inch drill shafts deeper. Funding : Cost: $96,963.88 Source of Funds: 4B -RR Transportation Development Corporation Outside Resources: RGM Constructors, L.P. Background Information• The A.W. Grimes Boulevard Phase II project was awarded to RGM Constructors, L.P., by Council on July 14, 2005. Phase II constructs a six -lane section from US 79 to Lake Creek including curb and gutter, sidewalk, a raised median, drainage and utility improvements, a bridge over Brushy Creek and a crossing under the Union Pacific Railroad. When complete, A.W. Grimes Boulevard will provide the final link for connecting Georgetown, Round Rock and Pflugerville. Public Comment: N/A Amount % Change Original Contract $4,978,357.76 N/A Previous Change Orders $605,157.00 12.16% Change Order #7 $96 963.88 1.95% Revised Contract $ 5,680,478.64 14.10% Outside Resources: RGM Constructors, L.P. Background Information• The A.W. Grimes Boulevard Phase II project was awarded to RGM Constructors, L.P., by Council on July 14, 2005. Phase II constructs a six -lane section from US 79 to Lake Creek including curb and gutter, sidewalk, a raised median, drainage and utility improvements, a bridge over Brushy Creek and a crossing under the Union Pacific Railroad. When complete, A.W. Grimes Boulevard will provide the final link for connecting Georgetown, Round Rock and Pflugerville. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Transportation Services PROJECT: A. W. Grimes Boulevard Phase II Page 1 of 2 DATE: 11/6/2006 CHANGE ORDER NO: 7 JUSTIFICATION: Reference page 2 of 2 ORIGINAL CONTRACT PRICE: $4,978,357.76 PREVIOUS CHANGE ORDERS: $605,157.00 THIS CHANGE ORDER: $96,963.88 CHANGE ORDERS TO DATE: $702,120.88 CHANrF nATA ITEM # DESCRIPTION OF CHANGES UNIT UNIT QTY. PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 1 SANITARY SEWER MANHOLE EA 1 $5,100.00 $5,100.5'0- 2 IRRIGATION ENCASEMENT, PVC 4" LF 218 $16.00 $3,488.00 3 GRAVEL MATERIAL FOR STORM EA 1 $34,450.00 $34,450.00 0 SYSTEM BEDDING $0.00 0 4 UNDER CUT ROADWAY AT GAS LINE EA 1 $9,572.00 $9,572.00 0 5 FUTURE IRRIGATION TAP EA 1 $2,200.00 $2,200.00 0 6 DRILL SHAFTS (30 -INCH) LF 215.91 $160.00 $34,545.60 0 7 CONSTRUCTION EXIT TYPE I SY 111.7 $8.00 $893.28 0 8 STEEL ENCASEMENT (24 -INCH) LF 3 $110.00 $330.00 0 9 RAISE BRAZOS RIVER AUTHORITY EA 1 $6,385.00 $6,385.00 7 EXISTING FIBERGLASS MANHOLE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL: $66,963.88 7 o1bconoC ov. n SITURE (ENGIN MA)�/( DATE 11/6/2006 SIGNA RE (CONT CTO ) DATE PRINTED NAME: Martin Morello TITLE: Proiect Manaaer 11 APPROVED: CITY OF RB R o(0- 07 i�cz is -67-o40 DATE PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: $96,963.88 PREVIOUS CHANGE ORDER: $605,157.00 TOTAL % CHANGE TO DATE: 14.10% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $5,680,478.64