R-04-02-12-14E7 - 2/12/2004RESOLUTION NO. R-04-02-12-14137 WHEREAS, the City of Round Rock has previously entered into an inspection proposal with HOT Inspection Services, Inc. for inspection services for the South 81 Elevated Storage Tank project, and WHEREAS, HOT Inspection Services, Inc. has submitted Supplemental Agreement No. 1 to the inspection proposal to amend the fee due to project delays from the construction contractor, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 1 with HOT Inspection Services, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 1 to the Inspection Proposal with HOT Inspection Services, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of February, 2 NYLE LL, Mayor ACity of Round Rock, Texas T T: A0,• - CHRISTINE R. MARTINEZ, City Secretary @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLDTI/R40212E7.WPD/SC SUPPLEMENTAL AGREEMENT NO.1 TO "1.25 MMG ELEVATED STORAGE TANK INSPECTION PROPOSAL" WITH HOT INSPECTION SERVICES, INC. THE STATE OF TEXAS § COUNTY OF WILLIAMSON § KNOW ALL BY THESE PRESENTS: That this Supplemental Agreement No. 1 to "1.25 MMG Elevated Storage Tank Inspection Proposal" is made by and between the City of Round Rock, with offices located at 221 East Main Street, Round Rock, Texas, 78664 (hereinafter referred to as the "City") and HOT Inspection Services, Inc., with offices located at Post Office Box 1208, Round Rock, Texas, 78680 (hereinafter referred to as "HOT'). WHEREAS, the City and HOT executed said "1.25 MMG Elevated Storage Tank Inspection Proposal" (hereinafter referred to as the "Agreement"), on the 13'h day of September, 2001, for site inspection services for the South 81 Elevated Storage Tank project; and WHEREAS, due to the fact that twenty (20) additional hours of quality control inspection services were necessitated by CB&I Constructors' delay in completing the South 81 Standpipe Demolition and Elevated Storage Tank Construction Project, it has become necessary to amend the Agreement to provide for additional compensation to HOT. NOW, THEREFORE, premises considered, the City and HOT hereby agree that said Agreement is amended as follows: Total compensation is amended by adding $1,300.00 to the amount payable under this Agreement, for a revised total lump sum of $15,915.00, as evidenced by attached Exhibit "A." IN WITNESS WHEREOF, the City and HOT have executed this Supplemental Agreement No. 1 in duplicate originals. OWNER: CITY OF ROUND ROCK Un Nyle Maxwell, Mayor ATTEST: Christine R. Martinez, City Secretary PROVIDER OF SERVICES: HOTT - 00�� EXHIBIT a a "An wA . 81 Elevated Tank Site i a v a �i E c 81 ELEVATED TANK DATE: February 6, 2004 SUBJECT: City Council Meeting - February 12, 2004 ITEM: *14.E.7. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 1 with HOT Inspection Services, Inc. for inspection services for the South 81 Elevated Storage Tank project. Department: Water and Wastewater Utilities Staff Person: Tom Clark, Director of Utilities Justification: An Additional 20 -hours of inspection was required by HOT Inspection Services, Inc. due to delays from the tank construction contractor of this project, CB&I. The total fee for these additional services is $1,300.00, which has been deducted from the tank contractor's compensation. Funding: Cost: $1,300 Source of funds: Capital Project Funds (Self -Financed Utility Outside Resources: HOT Inspection Services, Inc.- John H. Konzen Background Information: The general scope of work under this contract amendment was for inspection and quality control of CB & I Constructors' work on the South 81 Elevated Tank and Demolition Project. HOT Inspection Services, Inc. performed these services in accordance with his 1.25 MG Elevated Storage Tank Inspection Contract with the City. The City and CB & I Constructors' executed a Settlement and Release Agreement regarding these additional costs to the City on December 18, 2003 in the amount of $46,520.00, includes the $1,300.00 herein due to HOT Inspection Services, Inc. The remaining $45,220.00 was for additional engineering service by HDR and additional inspection and administration service by City staff. Therefore, this resolution will have no net additional cost to the City. Public Comment: N/A EXECUTED DOCUMENT FOLLOWS SUPPLEMENTAL AGREEMENT NO.1 TO "1.25 MMG ELEVATED STORAGE TANK INSPECTION PROPOSAL" WITH HOT INSPECTION SERVICES, INC. THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF WILLIAMSON § That this Supplemental Agreement No. 1 to "1.25 MMG Elevated Storage Tank Inspection Proposal" is made by and between the City of Round Rock, with offices located at 221 East Main Street, Round Rock, Texas, 78664 (hereinafter referred to as the "City") and HOT Inspection Services, Inc., with offices located at Post Office Box 1208, Round Rock, Texas, 78680 (hereinafter referred to as "HOT"). WHEREAS, the City and HOT executed said "1.25 MMG Elevated Storage Tank Inspection Proposal" (hereinafter referred to as the "Agreement"), on the 13th day of September, 2001, for site inspection services for the South 81 Elevated Storage Tank project; and WHEREAS, due to the fact that twenty (20) additional hours of quality control inspection services were necessitated by CB&I Constructors' delay in completing the South 81 Standpipe Demolition and Elevated Storage Tank Construction Project, it has become necessary to amend the Agreement to provide for additional compensation to HOT. NOW, THEREFORE, premises considered, the City and HOT hereby agree that said Agreement is amended as follows: Total compensation is amended by adding $1,300.00 to the amount payable under this Agreement, for a revised total lump sum of $15,915.00, as evidenced by attached Exhibit "A." IN WITNESS WHEREOF, the City and HOT have executed this Supplemental Agreement No. 1 in duplicate originals. OWNER: CITY OF ROUND ROCK By: axwell, Mayor ATTEST: LE au��-Wk- Christine R. Martinez, City Secretary R-oil-oa-ia -iyE7 PROVIDER OF SERVICES: HOT Inspection Services, Ins./ LIM John 1.25MMG ELEVATED STORAGE TANK INSPECTION PROPOSAL HOT Inspection Services, Inc. (HOT) hereby offers to perform the following work on the 1.25MMG Elevated Water Storage Tank Project at the price, terms, and conditions listed herein: SCOPE: HOT proposes to provide welding inspection and testing and coating inspection and testing on the referenced project for The City of Round Rock. The objective of this project is to provide quality assurance surveillance of the welding, erection, sandblasting, and painting during the construction of the water tank. Inspection and testing visits will be strategic and at the discretion of the Owner/Engineer. The services to be rendered will include the following: Welding, Fabrication and Erection Inspection Review tank project drawings to provide comments and recommendations -Review welder qualification records, welding procedures, and mill test reports before any welding commences. -Verify proper welding electrodes and electrode storage to be used on project. -Conduct inspections on shop fabricated components. -Conduct inspection of tank erection practices and fit -up. -Conduct Certified Welding Inspection per AWWA D100 during construction. The inspection methods to be implemented for the above inspection will consist of Visual Testing (VT) and Radiographic Testing (RT). All inspections will verify compliance with the AWWA D100-96 Standard and Contract Specifications. 1. Shop fabricated items will be inspected on site as they arrive unless a shop visit is requested by the owner. The fabrication and weld quality will be inspected for compliance to AWWA 13100-96. If a shop inspection is required by the owner, it shall consist of a visual inspection of the fabricating practices and operations to determine compliance with the AWWA Standard. 2. Field erection and welding will be inspected for compliance to the AWWA Standard. The inspection procedures will parallel the procedures listed in Section 11.2. The quality of field welding shall be determined by visual inspections on all joint fit -up and welding. Radiographic testing will be conducted as specified in Section 11.5. All test locations will be selected by HOT and the radiographs will be graded. 3. Radiographic Testing may be provided by the Contractor unless specified otherwise in the contract documents. In either case HOT will provide the location selection of each shot and grade each radiograph. Page 2. S81 Proposal Sandblasting and Coating Inspection -Pre-surface preparation inspection. -Measurement of ambient conditions. -Evaluation of compressor and surface preparation equipment. -Determination of surface preparation cleanliness and profile. -Inspection of application equipment. -Witnessing coating mixing. -Inspecting coating application. -Determination of wet film thickness. -Determination of dry film thickness. -Evaluating cleanliness between coats. -Conduct holiday testing of the inside coating system below the top capacity level. -Evaluate cure. -Finalize inspection and testing of project by submitting a final report to engineer and owner. The inspection methods to be implemented for the sandblasting and coating inspections will consist of visual inspections, mil gauging, holiday testing, profile gauging and atmospheric measuring. All inspections will verify compliance with the AWWA D102-97 and contract specifications. 1. The measurement of air temperature, surface temperature, humidity, dew point, coating thickness and holiday detection will be recorded in an inspectors log book. The equipment to obtain such measurements will be supplied by HOT. WORK EXCLUDED: Work required for safely accessing the tank is not included in the cost of this project. It will be the contractor's responsibility for providing safe access to all areas of the tank for inspection and testing during the construction. OSHA approved scaffolding and shell buggies will be necessary for the complete access of the tank. Page 3. S81 Proposal PRICE: The cost for the above mentioned service is based on an hourly rate of $65.00/hr for Welding Inspection and Coating Inspection. If contract requires contractor to furnish and pay for Radiographic Testing, then HOT will select the locations of X-rays and grade film. The cost of Services mentioned above is as follows: WELDING AND ERECTION INSPECTION.........................................................$6,240.00 NOTE: BASED ON 96 HOURS (3 HR MIN. CHARGED EACH SITE VISIT) SURFACE PREPARATION AND PAINTING INSPECTION(field)..................................................$4,875.00 NOTE: BASED ON 75 HOURS (3 HR MIN. CHARGED EACH SITE VISIT) SURFACE PREPARATION AND PAINTING INSPECTION(shop)..................................................$3,500.00 NOTE. BASED ON 3 DAYS AT SHOP IN DES MOINES, IOWA (TIME ONLY) TOTAL COST OF SERVICE..............................................................$14,615.00 All work will be conducted and billed at an hourly rate as shown above. The budget cost for conducting the inspection will not exceed the cost above without written approval from the owner/representative. Once the cost approaches the budget cost, the owner will be notified and informed of the remaining work required to complete project TERMS: This proposal is offered to acceptance within 45 days. Payments to be made within 30 days of invoice date. CONDITIONS: This proposal assumes that the tank will be accessible for inspection and that any restrictions requiring special work will affect the cost of this proposal. INSURANCE: HOT to provide insurance certificate upon request. TIME OF PERFORMANCE: All inspection visits will be scheduled with the engineer and contractor if required for performing the necessary inspection and testing. Page 4. S81 Proposal ACCEPTANCE: Should you find this proposal acceptable at the prices, terms, and conditions offered, please indicate your acceptance by signing in the space provided. Executed on this the _1day of 2001. ACCEPTED k s , x, 1F Y' r , Q F, s Y r wu y 3 F w p r 11 I'll MINOR c W-#E S. 81 ELEVATED TANK ftFI'l�D R I TE}tAS PROJECT �k�,�t�six„,�,=ttk,„