Loading...
R-12-11-08-H9 - 11/8/2012RESOLUTION NO. R -12-11-08-H9 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction for the Chisholm Trail Road Reconstruction / Parkway Extension Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Cash Construction for the Chisholm Trail Road Reconstruction / Parkway Extension Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of November, 2012. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: J O:\wdox\SCClnts\0112\ 1204\MUNICIPAL\00261303.DOC Contract Quantity Adjustment/ Change Order rev. 08/12 Department: Transportation Project Chisholm Trail Road Name: Reconstruction/Chisholm Pkwy. Extension City Project ID Number ST11CHSM 'I..�4'iC��47..r EXHIBIT „A„ Pagel of 3 Date: 10/15/12 Change Order/Quantity Adjustment No. 1 JN.7LII IL.0LIV11 The change order items were included on the construction plans, but were not included as bid items. The quantity adjustment items 127 -140 were for additonal 12" waterline for Chisholm Parkway because the old existing Asbestos waterline was in conflict with builiding the road. Item 29 was a quantity overrun in concrete for the pond walls. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: $52,995.00 1% $7,438,683.001 $197,440.00 Original Contract Time: 535 Calendar Days Time Adjustment by previous Quan. Adj./Change Order: 0 Calendar Days Time Adjustment by this Quan. Adj./Change Order: 52 Calendar Days New Contract Time: 587 Calendar Days mined for�Approval_ ._ .. F — -- -- - B.J. Cash, Cash Construction Printed Name, Title, Company 1011 �/l Z Date Contractor: B J Cash, Cash Construction I o /lam/t 2- Signature Printed Name, Title, Company vete City Project Mnnnnor• K (� c.- A 1 M `�1 2b 5 Bill Stablein, Project Manager, CORR Title Date Mayor/City Manager Alan McGraw, Mayor, CORR Signature Printed Name, Title Date Contract Quantity Adjustment/Change Order rev, 08/12 Project Name: Chisholm Trail Road Reconstruction/Chisholm Pkwy. Extension Quan. Adj./Change Order No. 1"I. nnn Ardor 11nta Page 2 of 3 ... , . e1 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days AM- 6" Wet Connection Sta. 8+43 EA 1 $3,795.00 $3,795.00 8" Wet Connection Sta. 9+36 EA 1 $4,385.00 $4,385.00 12" Wet Connection Sta. 1+19, 56+58, & 10+68 EA 3 $4,580.00 $13,740.00 8'x8' Tapping Sleeve & Valve Sta. 9+75 & 15+30 EA 2 $7,410.00 $14,820.00 12" Tapping Sleeve & Valve Sta. 32+85 6" Tapping Sleeve & Valve Sta. 9+03 EA EA 1 1 $9,975.00 $6,280.00 $9,975.00 $6,280.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TA , Page 3 of 3 _ Contract Quantity Adjustment/Change Order rev, 08/12 Project Name: Chisholm Trail Road Reconstruction/Chisholm Pkwy. Extension Quan. Adj./Change Order No.: Auantitu Adiustment Data 7-77-7 Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment 29 CLC Concrete (Retaining Wall) CY 83.8 $620.00 $51,956.00 10 127 Trench Safety Systems LF 1,040 $2.00 $2,080.00 129 Pipe, CL 350, 12" Diameter LF 1,040 $60.00 $62,400.00 33 130 Pipe, CL 350, 8" Diameter LF 15 $75.00 $1,125.00 4 131 Pipe, CL 350, 6" Diameter LF 27 $72.00 $1,944.00 4 133 Fittings (DI) TON 1.4 $6,000.00 $8,400.00 135 Fire Hydrant EA 2 $3,500.00 $7,000.00 1 136 Valve, Gate Type, 6" EA 3 $1,000.00 $3,000.00 137 Valve, Gate Type, 8" EA 1 $1,500.00 $1,500.00 138 Valve, Gate Type, 12" EA 2 $2,500.00 $5,000.00 140 Reflectorized Pavement Markers EA 2 $20.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALL : $144,445.00 52 ROUND ROCK, TEXAS City Council Agenda Summary Sheet PURPOSE PASSION PROSPERnI: Item No. H9. Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 1 with Cash Construction for the Chisholm Trail Road Reconstruction/Parkway nda Caption: Extension Pro Meetina Date: November 8, 2012 Transportation Staff Person making presentation: Gary Hudder Transportation Director Item Summary: The City Council approved the bid of Cash Construction for Chisholm Trail Road Reconstruction/Parkway Extension Project on May 24, 2012 at a cost of $7,241,243. The scope of this project is to reconstruct Chisholm Trail Road to a five -lane urban roadway with curb and gutter section, install a new water line along Chisholm Trail Road, and extend Chisholm Parkway from its current termini to Chisholm Trail Road. Quantity Adjustment/Change Order No. 1 would increase the cost of this construction contract by $197,440. Quantity adjustments for Class C concrete for the retaining wall, trench safety systems, pipe, additional fittings, a fire hydrant, gate type valves, and reflectorized pavement markers would cost $144,445. The change order portion would add wet connections and tapping sleeves and valves at a cost of $52,995. Cost: $197,440 Source of Funds: 2002 General Obligation Bonds and Type B Corporation Recommended Action: Approval EXECUTED ORIGINAL DCOUMENT FOLLOW 4 Contract Quantity Adjustment/Change Order 'SNI, 'NU NIN:N 1laA. rev, 08/12 Department: Transportation Project Name: City Project ID Number Justification Chisholm Trail Road Reconstruction/Chisholm Pkwy. Extension ST11CHSM Page 1 of 3 Date: 10/15/12 Change Order/Quantity Adjustment No. i Fhe change order items were included on the construction plans, but were not included as bid items. The quantity adjustment items 127 -140 vere for additonal 12" waterline for Chisholm Parkway because the old existing Asbestos waterline was in conflict with builiding the road. Item ?9 was a quantity overrun in concrete for the pond walls. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Amount % Change $0.00 $144,445.00 $7,385,688.00 $0.00 0% $52,995.00 1% $52,995.00 1% $7,438,683.00 $197,440.00 535 Calendar Days 0 Calendar Days 52 Calendar Days 587 Calendar Days Prepared By: Rao'k— B.J. Cash, Cash Construction 10 Jt's/( "L Signature Printed Name, Title, Company Date Contractor: B.J. Cash, Cash Construction 10111;:;-/12- P Signature Printed Name, Title, Company Date ON Project C' A - - Manager: Mayor/City n„ " Manager CL 12-1 I -og- Hq Bill Stablein, P Printed Name, Alan McGraw, Mayor, CORR Printed Name, Title CORR Date 1Z Contract Quantity Adjustment/Change Order "InN HI> RtM:A. I k Ahs rev. 08/12 Project Name: Chisholm Trail Road Reconstruction/Chisholm Pkwy. Extension Quan. Adj./Change Order No. Change Order Data Page 2 of 3 Item # Item Description 6" Wet Connection Sta. 8+43 Unit EA Qty. 1 Unit Price $3,795.00 Amount $3,795.00 Contract Time Adjustment Da s 8" Wet Connection Sta. 9+36 EA 1 $4,385.00 $4,385.00 12" Wet Connection Sta. 1+19, 56+58, & 10+68 EA 3 $4,580.00 $13,740.00 8'x8' Tapping Sleeve & Valve Sta. 9+75 & 15+30 EA 2 $7,410.00 $14,820.00 12" Tapping Sleeve & Valve Sta. 32+85 EA 1 $9,975.00 $9,975.00 6" Tapping Sleeve & Valve Sta. 9+03 EA 1 $6,280.00 $6,280.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Contract Quantity Adjustment/Change Order "NIR ,!.I>VR(R;A`1Y1\A rev, 08/12 Project Name: Chisholm Trail Road Reconstruction/Chisholm Pkwy. Extension Quan. Adj./Change Order No. Ouantity Adjustment Data Page 3 of 3 Bid Item # �y. 29 Item Description CLC Concrete (Retaining Wall) Unit CY Qty. 83.8 Unit Price $620.00 Amount $51,956.00 Contract Time Adjustment 10 127 Trench Safety Systems LF 1,040 $2.00 $2,080.00 129 Pipe, CL 350, 12" Diameter LF 1,040 $60.00 $62,400.00 33 130 Pipe, CL 350, 8" Diameter LF 15 $75.00 $1,125.00 4 131 Pipe, CL 350, 6" Diameter LF 27 $72.00 $1,944.00 4 133 Fittings (DI) TON 1.4 $6,000.001 $8,400.00 135 Fire Hydrant EA 2 $3,500.00 $7,000.00 1 136 Valve, Gate Type, 6" EA 3 $1,000.00 $3,000.00 137 Valve, Gate Type, 8" EA 1 $1,500.00 $1,500.00 138 Valve, Gate Type, 12" EA 2 $2,500.00 $5,000.00 140 Reflectorized Pavement Markers EA 2 $20.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 MIA ;$0.00 $0.00 1-445.00152 77