R-12-11-20-G4 - 11/20/2012RESOLUTION NO. R -12-11-20-G4 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Chasco Constructors for the Kenney Fort Boulevard (Arterial A) Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 3, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 3 to the Contract with Chasco Constructors for the Kenney Fort Boulevard (Arterial A) Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 20th day of November, 2012. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: 4 W,. SARA L. WHITE, City Clerk O:\wdox\SCClnts\0112\1204\MUNICIPAL\00262082 DOC/rmc „ Contract Quantity Adjustment/ Change Order rev. 05)12 Department Transportation Project Kenney Fort Blvd. (Arterial A) Name City Project TX02ARTA ID Number Justification Page 1 of 3 Date: 10/9/2012 Change Order/Quantity Adjustment 3 No. UPRR mainline required re -tamping to align with new bridge construction, additional track footage was required to fie in to UPRR mainline. new intersections and street stub outs were added at the request of CORR, conduit sleeves were added at street stubs and intersections for future use, street light foundations were re -sized from 24" to 30" to accommodate breakaway bases, breakaway bases were added at street lights, temporary special shoring at UPRR bridge was revised due to rock conditions encountered. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Pius Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval Amount % Change $17,095,753.80 -$244,177.50 $95,158.03 ($149,019.47) $16,946,734.33 $288,704.20 1.70% $445,791.27 2.63% $734,495.47 4.33% $17,681,229.80 $585,476.00 730 Calendar Days Calendar Days 14 Calendar Days 744 Calendar Days Prepared By Signature Bill Stablein, Project Manager, CORR Date Approvals Chasco q/ ConstructorsA.6( 1 p �j! • Z Signature tharles Glace Jr., Pres dent, ehasco, Constructors Date Engineer City of Round Rock Signature David Hohman, Engineer, HDR Date Signature Alan McGraw, Mayor, City of Round Rock EXHIBIT „A„ Date Contract Quantity Adjustment/Change Order rev. OS/12 Department Transportation Date Project Kenney Fort Blvd. (Arterial A) Name City Project TX02ARTA Change Order/Quantity Adjustmei ID Number N4 Change Order Data Item # Item Description Unit Qty. Unit Price Contract Amount Time Adjustment (Days) 1 Revise Street Light Foundations Detail 213- 320/341 DRILL SHAFT (30 IN)(RDWY ILL POLE)(ONCOR) LF 256.00 $178.00 $45,568.00 * Abandon original 24" foundations due to change In anchor bolts and foundation diameter EA 11.00 $280.81 $3,088.91 *Add Valmont T83-17 breakaway bases EA j 32.00 $638.10 $20,419.20 Subtotal $69,076.11 2 Revise UPRR Temp shoring * Add wide flange sheet pile shoring system LS 1 $29,975.00 $29,975.00 Subtotal $29,975.00 3 Retamp UPRR Mainline * Required to adjust mainline track elevation to meet new construction LS 1 $298,352.00 $298,352.00 * 8% Chasco OH & P LS 1 $23,868.16 $23,868.16 Subtotal $322,220.16 4 Add New Street Stubouts 432 P.C. SIDEWALK CURB RAMP WITH PAVERS (TY 7) (TY 7 EA 6 $1,100.00 $6,600.00 Subtotal $6,6iO.00 6 Add 4" Sched. 40 PVC sleeves * 4 - Inter. Stubout 2 ea -4" conduits @ 100' LF 400 $28.00. $11,200.00 * 3 - Street Stubout 2 ea -4" conduits @ 80' LF 240 $28.00 6 720.00 Subtotal $17,920.00 TOTALS: $445,791.27 1 0 Page 3 of 3 Contract Quantity Adjustment/Change Order rev. 05/12 Department Transportation Project Kenney Fort Blvd. (Arterial A) Name City Project TX02ARTA ID Number Date: 10/9/2012 Change Order/Quantity Adjustment No. Quantity Adjustment Data Contract Bid Item # Item Description Unit Qty. Unit Price Amount Time Adjustment Da s 1 Revise Street light foundations Detail 320/341 POLE)(ONCOR) LF (175.00) $103.00 ($18,025.00) Subtotal 18,025.00 4 Add 3 New Street Stubouts 110-2001 2472392 2602002 2602009 3102002 3402011 3402048 430 EXCAVATION (ROADWAY) FL BS CMP IN PLC TY D GR 5 (FNL POS LIME HYDRATED LIME SLURRY LIME TRT EXST MATL 10° PRIME COAT AE -P D -GR HMA METH TY -B PG 64-22 D -GR HMA METH TY -C SAC -B PG70-22 P.C. CONC CURB AND GUTTER COMPLETE CY Cy TON SY GAL TON TON LF 173.00 126.00 6.50 283.00 57.00 64.00 32.00 9.00 $6.50 $23.00 $146.00 $3.75 $3.85 $63.00 $67.00 $9.70 $1,124.50 12 898.00 $949.00 $1,061.25 $219.45 $4,032.00 $2,144.00 $87.30 432 NEW P.C. CONCRETE SIDEWALKS 5 INCH THICKNESS SY (209.00) $25.75 ($5,381.75) Subtotal $7,133.75 IFL 5 Add 4 New Intersection Stubouts 2472392 2602002 2602009 3102002 3402011 3402048 430 BS CMP IN PLC TY D GR 5 (EL POS LIME HYDRATED LIME SLURRY LIME TRT EXST MATL 10" PRIME COAT (AE -P) D -GR HMA METH TY -B PG 64-22 D -GR HMA METH TY -C SAC -B PG70-22 P.C. CONC CURB AND GUTTER COMPLETE CY TON SY GAL TON TON LF 550 28 1237 247 258 129 140 $23.00 $146.00 $3.75 3.85 $63.00 $67.00 $9.70 $12,650.00 $4088.00 $4,638.75 $950.95 $16254.00 $8,643.00 $1,358.00 432P.C. SIDEWALK CURB RAMP WITH PAVERS (TY EA 6 $650.00 $3,900.00 432 NEW P.C. CONCRETE SIDEWALKS 5 INCH THICKNESS SY (198.00 ) $25.75 ($5,098.50) Subtotal $47,384.20 14 7 Additional track length re uired 4282 2001 TRACK 136# CWR W/WOOD TIES AND BALLAST TF 259.58 $226.00 $58,665.08 $58,665.08 TOTALS: $95,158.03 14 X TEXAS ( PROSPERRY. Item No. G4. City Council Agenda Summary Sheet Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Agenda Caption: Order No. 3 with Chasco Constructors for the Kenney Fort Boulevard (Arterial A) Project. Meeting Date: November 20, 2012 Department: Transportation Department Staff Person making presentation: Gary Hudder Transportation Director Item Summary: The original contract for construction services was approved by the City Council on June 23, 2011 for the amount of $17,095,753.80 to extend Kenney Fort Boulevard from Joe Dimaggio south to Forest Creek Boulevard. Quantity Adjustment/Change Order No. 1 added John Harris and Susan Hickox as additional insured and reinforced concrete pipe was replaced with 36" corrugated concrete pipe for culvert the crossing at the request of Union Pacific Railroad at the cost of $10,519. Quantity Adjustment/Change Order No. 2 was for quantity adjustments in railroad related work and field related quantity changes at a cost of $34,007.70. Quantity Adjustment/Change Order No. 3 is for additional rail footage and ballast pretamping and street light installation expenses at a cost of $540,949.30. Fourteen days were added to the construction contract. The total cost of the construction contract would be $17,681,229.80. Cost: $540,949.30 Source of Funds: Type B Recommended Action: Approval , } { ; ( � � ( } { � ( � ( � ( t � { � } � ORG I INAL ( } DOCUMENIS FOLLO\&/ \ [ ( ( / / { { { ! { { { ( [ ( \ { { [ ( ( [ [ } Contract Quantity Adjustment/Change Order rev. WW12 Department Transportation Project Kenney Fort Blvd. (Arterial A) Name City Project TX02ARTA ID Number Justification Page 1 of 3 Date: 10/9/2012 Change Order/Quantity Adjustment 3 No. UPRR mainline required re -tamping to align with new bridge construction, additional track footage was required to be in to UPRR mainline. new intersections and street stub outs were added at the request of CORR, conduit sleeves were added at street stubs and intersections for future use, street light foundations were re -sized from 24" to 30" to accommodate breakaway bases, breakaway bases were added at street lights, temporary special shoring at UPRR bridge was revised due to rock conditions encountered. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)j: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval Amount % Change $17,095,753,80 -$244,177.50 $95,158.03 ($149,019.47) $16,946,734.33 $288,704.20 1.70% $445,791.27 2.63% $734,495.47 4.33% $17,681,229.80 $585,476.00 730 Calendar Days Calendar Days 14 Calendar Days 744 Calendar Days Prepared By �G 3 1 ' f2 Signature Bill Stablein, Project Manager, CORR Date Approvals Chasco Constructors Signature Engineer Signature City of Round Rock Signature R a-Il.20 -C+ /0'�>/• I?- Glace Z Glace Jr.; Pres)dent, Ithasco Constructors Date I Hohman, Engineer, HDR McGraw, Mayor, City of Round Rock Date 11.20.(2 Date Page 2 of 3 Contract Quantity Adjustment/ Change Order rev. 05/12 Department Transportation Date: 10/9/2012 Project Name Kenney Fort Blvd. (Arterial A) City Project TX02ARTA Change Order/Quantity Adjustment ID Number No 3 Change Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 Revise Street Light Foundations Detail 213- 320/341 DRILL SHAFT (30 IN)(RDWY ILL POLE)(ONCOR) LF 256.00 $178.00 $45,568.00 * Abandon original 24" foundations due to change in anchor bolts and foundation diameter EA 11.00 $280.81 $3,088.91 *Add Valmontrea away bases EA 32.00 $638.10 $20,419.20 Subtotal $69,076.11 2 Revise UPRR Temp shoring * Add wide flange sheet pile shoring system LS 1 $29,975.00 $29,975.00 Subtotal $29,975.00 3 Retamp UPRR Mainline * Required to adjust mainline track elevation to meet new construction LS 1 $298,352.00 $298,352.00 * 8% Chasco OH & P LS 1 $23,868.16 23 868.16 Subtotal $322,220.16 4 Add New Street Stubouts 432 P.C. SIDEWALK CURB RAMP WITH PAVERS (TY 7 7 EA 6 $1,100.00 $6,600.00 Subtotal $6,600.00 6 Add 4" Sched. 40 PVC sleeves * 4 - Inter. Stubout 2 ea -4" conduits @ 100' LF 400 $28,00, $11,200.00 * 3 - Street Stubout 2 ea -4" conduits @ 80' LF 240 $28.00 $6,720.00 Subtotal $17,920.00 TOTALS: $445,791.27 0 Contract Quantity Adjustment/Change Order rev. 05/12 Department Transportation Project Kenney Fort Blvd. (Arterial A) Name City Project TX02ARTA ID Number Page 3 of 3 Date: 10/9/2012 Change Order/Quantity Adjustment 3 No. Quantity Adjustment Data Bid Item # Item Description P Unit Qty. Unit Price Amount Contract Time Adjustment (Davs) 1 Revise Street 1l ht foundations Detail 320/341 POLE)(ONCOR) LF (175.00) $103.00 ($18,025.00) Subtotal ($18,025.00) 4 Add 3 New Street Stubouts 110-2001 EXCAVATION ROADWAY CY 173.00 $6.50 $1,124.50 2472392 FL BS CMP IN PLC TY D GR 5 FNL POS CY 126.00 $23.00 $2,898.00 2602002 LIME HYDRATED LIME SLURRY TON 6.50 $146.00 $949.00 2602009 LIME TRT EXST MATL 10" SY 283.00 $3.75 $1,061.25 3102002 PRIME COAT (AE -P) GAL 57.00 $3.85 219.45 3402011 D -GR HMA METH TY -B PG 64-22 TON 64.00 $63.00 $4,032.00 3402048 D -GR HMA METH TY -C SAC -B PG70-22 TON 32.00 $67.00 $2,144.00 430 P.C. CONC CURB AND GUTTER COMPLETE LF 9.00 $9.70 $87.30 432 NEW P.C. CONCRETE SIDEWALKS 5 INCH THICKNESS SY (209.00) $25.75 ($5,381.75) Subtotal $7,133.75 5 Add 4 New Intersection Stubouts 2472392 FL BS CMP IN PLC TY D GR 5 FNL POS CY 550 23.00 $12.,650.00 2602002 LIME HYDRATED LIME SLURRY TON 28 $146.00 $4,088.00 2602009 LIME TRT EXST MATL 10" SY 1237 $3,751 $4,638.75 3102002 PRIME COAT (AE -P) GAL 247 $3.851 $950.95 3402011 D -GR HMA METH TY -B PG 64-22 TON 258 $63,001 $16,254.00 340 2048 D -GR HMA (METH) TY -C SAC -B PG70-22 TON 129 $67.00 $8,643.00 430 P.C. CONC CURB AND GUTTER COMPLETE LF 140 $9,70 $1,358.00 432 P.C. SIDEWALK CURB RAMP WITH PAVERS (TY 1 EA 6 $650.00 $3,900.00 432 NEW P.C. CONCRETE SIDEWALKS 5 INCH THICKNESS SY (198.00) $25.75 ($5,098.50) Subtotal $47,384.20 14 7 Additional track length required 4282 2001 TRACK 136# CWR W/WOOD TIES AND BALLAST TF 259.58 $226.00 $58,665.08 $58,665.08 TOTALS: $95,158.03 14