R-12-12-20-E7 - 12/20/2012RESOLUTION NO. R -12-12-20-E7 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with RGM Constructors of Texas, LLC for the Hesters Crossing Road and La Frontera Boulevard Street Reconstruction Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with RGM Constructors of Texas, LLC for the Hesters Crossing Road and La Frontera Boulevard Street Reconstruction Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 20th day of December, 2012. ALX& MCGRAW, Mayor City of Round Rock, Texas ATTEST: // 2KA L. aftt SARA L. WHITE, City Clerk 0 Awdox\SCClnts\0112\ 1204\MUNICIPAL\00264161. DOC/rmc -?NO- a� nu�c�K rxtis rev, 06/11 Contract Quantity Adjustment/Change Order Department: Transportation Department Project Nesters Crossing Rd. & La Frontera Blvd Name: Street Reconstruction City Project ID Number WR010SP Date: Change Order/Quantity Adjustment No. Page 1 of 4 6/9/2012 2 justification NO BID ITEMS FOR INLET TRANSITIONS AND ADJUST INLET TO GRADE. FLEX BASE WAS REQUESTED IN LIEU OF SCREENINGS. FINAL QUANTITY ADJUSTMENTS. auAK 1 Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval Amount % Change $2,928,446,711, 0 $25,685.00 0 ($140,306.82) $114,621.82 $2 813 824.89 $0.00 0.00 $26,236.35 0.01 $26,236.35 0.01 $2,840,V61,214 ($88,385.47) 2 0 61 0 63 0 City Staff Signature Bill Stablein, City of Round Rock, Project Manager Date --APQrovals -- Printed Contractor Company Name: RGM Constructors of Texas, LLC For Contractor: Signature Printed Name, Title / 11/1,-:-// e__ For City of 2ound Rock: Signature Printed Name, Title Date EXHIBIT „A„ Page 2 of 4 110161— Contract Quantity Adjustment/Change Order rev, 06/11 Project Name: Nesters Crossing Rd. & La Frontera Blvd Street RPromM iction Quan. Adj./Change Order No.: 2 Chanae Order Data Item # Item Description Unit Unit Price Amount Time Adjustment (Days) CO # 2 INLET TRANSITIONS EA 14 $750.00 $10,500.00 2 CO # 2 ADJUST INLET TO GRADE EA 2 $600.00 $1,200.00 2 CO # 2 FLEX BASE IN LIEU OF SCREENINGS CY 8824.23 1.50 $13,236.35 0 CO # 2 ADDITIONAL SIGNS EA 4 $325.00 $1,300.00 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTALS: $26,236.35 6 Page 3 of 4 Contract Quantity Adjustment/Change Order mw�o ROCK TE1c.lS rev, 06/11 Project Name: Hesters Crossing Rd. & La Frontera Blvd Street RernmM irtinn Quan. Adj./Change Order No.: 2 Ouantiltv Ad'ustment Data Bid Item # Item Description Unit Unit Price Amount Time Adjustment (Days) 34 PORT CTB MOVE LOW PROF TY 1 LF 1 2580 $7.00 $18.060.00 3 35 PORT CTB MOVE LOW PROF TY 2 LF 220 $18.00 $3,960.00 3 36 PROF TY 11 LF 2480 $7.00 $17,360.00 4 37 PORT B PROF TY 21 LF 140 $18.00 $2,520.00 4 C-1 IN INTERSECTIONS CY 1333.33 $6.50 $8,666.65 20 C-2 EMBANKMENT - RGM COULD NOT SALVAGE ALL THE BASE ON THE PROJECT DUE TO THE SUBGRADE CY 721.23 $20.00 $14,424.60 15 43 BARRICADES, SIGNS TRD7FWMC HANDLING MO 1 $4,200.00 $4,200.00 56 ELIMINATING MARKINGS 4" LF 990 $5.00 $4,950.00 2 1-3 ROT—M-7 ASPHALTICCONCRETE PAVEMENT TYPE C TON 1028 $77.00 $79,156.00 2-2 5 " THICK, INCL REMVL OF EXIST SDWLK SF 2016 $6.50 $13,104.00 4 7 PRIME COAT GAL -1200 $3.92 ($4,704.00) 8 HOT MIX ASPHALTIC PAVEMENT TYPE B TON 1 -719.89 $64.00 ($46,072.96) 10 COMMON RAL EXCAVATION CY -51 $200.00 ($10,200.00) 12 P.C. CONCRETE DRIVEWAY SF -1581 $5.00 7 905.00 15 REMOV & RE-LAY PIPE 18 IN LF -491.7 $55.00 ($27,043.50) 17 REMOV & RE-LAY PIPE 30 IN LF -290 $66.00 ($19,140.00 19 REMOV STIR INLET EA -11 800.00 ($8,800.00) 20 REMOV STIR MANHOLE EA -7 $1,100.00 ($7,700.00) 21 REMOV STIR PIPE LF -984 $7.50 ($7,380.00) 22 MANHOLE JUNCTION BOX 5'X5' EA -7 $3,200.00 ($22,400.00) 23 MANHOLE JUNCTION BOX 4'X4' EA -2 $2,600.00 ($5,200.00) 25 CURB INLET TY 11)(10') EA -11 $3,500.00, ($38,500.00) 26 TRENCH SAFETY SYSTEMS LF 1 -1854 $1.70 ($3,151.80) 27 RC PIPE (CL 18 IN I L EXCAVATION AND BACKFILL LF -477 $68.00 ($32,43600 28 RC PIPE (CL 41 INCL EXCAVATION AND BACKFILL LF -68 94.00] ($6,39 2.00 Contract Quantity Adjustment/Change Order I�`NU�OOCA; rev. 06/11 Page 4 of 4 29 RC PPE L 30 IN) INCL EXCAVATION AND BACKFILL LF -188 $96.00 ($18,048.00) 30 RC PI 36IN) INCL EXCAVATION AND BACKFILL LF -182 $200.00 36 400.00 1-1 TACK COAT GAL -604 $3.70 ($2,234.80) 2-1 P.C. SIDEWALK CURB FU -TR PAVERS TY 1 EA -2 $1,500.00 ($3,000.00) TOTALS: ($140,306.82)1 55 ROUND ROCK, TEXAS City Council Agenda Summary Sheet PURPOSE. PASSION. PROSPERITY. Agenda Item No. E7. — CONSENT Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 2 with RGM Constructors of Texas, LLC for the Hesters Crossing Road & La Agenda Caption: Frontera Boulevard Street Reconstruction Project. Meeting Date: December 20, 2012 Department: Transportation Staff Person making presentation: Gary Hudder Transportation Director Item Summary: As part of the La Frontera Development, streets were approved for construction in March of 1999 by the City Council and constructed by 35/45 La Frontera, L.P. Currrently the streets along Hester's Crossing Road from Dry Creek Drive to County Road 172; La Frontera Boulevard from Hester's Crossing Road to SH 45; and the intersection of Sundance Parkway and Kouri Drive show failures of heaving and depressions in areas where underground utilities and infrastructure exist. The purpose of this rehabilitation and reconstruction project is to restore the condition of these critical arterials near a major retail center in order to enhance safety and mobility in the area. RGM Constructors of Texas was awarded the construction contract at a cost of $2,928,446.71. Quantity Adjustment/Change Order No. 1 was approved by the City Manager on May 25, 2012, at a cost of $25,685 for the installation of low profile barriers to save existing median trees and for additional quantities for work zone striping removal. Quantity Adjustment/Change Order No. 2 adds inlet transitions, inlet grade adjustments, use of flex base instead of screenings, and additional signs at a contract increase of $26,236.35. There is also a contract decrease in the amount of $140,306.82 for final quantity adjustments. The total cost of Quantity Adjustment/Change Order No. 2 is a contract deduction of $114,070.47. The final cost of the construction contract would be $2,840,061.24. Cost: ($111,070.47) Source of Funds: General Self -Financed Construction Recommended Action: Approval e s x F i i e E i e s 3 f k 5}:5} f L 3 F F' t F' d' 2 • - 7 t I M ---w - W rev, 06/11 Contract Quantity Adjustment/Change Order Department: Transportation Department Project Hesters Crossing Rd. & La Frontera Blvd Name: Street Reconstruction City Project ID Number WRO10SP Justification Page 1 of 4 Date: 6/9/2012 Change Order/Quantity Adjustment No. 2 NO BID ITEMS FOR INLET TRANSITIONS AND ADJUST INLET TO GRADE. FLEX BASE WAS REQUESTED IN LIEU OF SCREENINGS. FINAL QUANTITY ADJUSTMENTS. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)): Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: Amount % Change $0.00 0.00 $26,236.35 0.01 $26,236.35 0.01 2,840,061.24 ($88- 2 0 61 0 New Contract Time: 63 0 "7' city City Staff Signature Bill Stablein, City of Round Rock, Project Manager Date Printed Contractor Company Name: RGM Constructors of Texas, LLC For Contractor:_ _ Si re Printed Name Title ;or City of Man found Rock: iN' Signature Printed Name, Tide Z•2v• Z Date Contract Quantity Adjustment/Change Order ARD ROS Project Name: Hesters Crossing Rd. & La Frontera Blvd Street Rprnnstn irtinn Quan. Adj./Change Order No.: 2 Chan4e Order Data Unit H Amount Page 2 of 4 Time Adjustment , Page 3 of 4 Contract Quantity Adjustment/Change Order Mv, W11 Project Name: Hesters Crossing Rd. & La Frontera Blvd Street RFrnnctnirtinn Quan. Adj./Change Order No.: 2 ' Bid Item # Item Descri tion Unit Unit Price Amount Time Adjustment (Days) 34 PORT CTB MOVE LOW PROF TY 1 LF 2580 $7.00 $18,060.00 3 35 PORT CTB MOVE LOW PROF TY 2 LF 220 $18.00 $3,960.00 3 36 PROF TY 1 LF 2480 $7.00 $17,360.00 4 37 PROF TY 2 LF 1 140 $18.00 $2,520.00 4 C-1 IN INTERSECTIONS CY 1333.33 $6.50, $8,666.65 20 C-2 EMBANKMENT - RGM COULD NOT SALVAGE ALL THE BASE ON THE PROJECT DUE TO THE SUBGRADE CY 1 721.23 $20.00 $14,424.60 15 43 BARRICADES, SIGNS ARTT;7MC HANDLING MO 1 $4,200.00 $4,200.00 56 ELIMINATING EXISTING PAVEIMM MARKINGS 4" LF 990 $5.00 $4,950.00 2 1-3 HUT MIX ASPHALTIC COMM= PAVEMENT TYPE C TON 1 1028 $77.00 $79,156.00 2-2 5 " THICK, INCL REMVL OF EXIST SDWLK SF 2016 $6.50 $13,104.00 4 7 PRIME COAT GAL -1200 $3.92 ($4,704.00) 8 HOT MIX ASPHALTIC CONCRETE PAVEMENT TYPE B TON 1 -719.89 $64.00 ($46,072.96) 10 COMMON STRUCTURAL EXCAVATION CY -51 $200.00 ($10,200.00) 12 P.C. CONCRETE DRIVEWAY SF -1581 $5.00 1$7.905.00) 15 REMOV & RE-LAY PIPE 18 IN LF -491.7 $55.00 27 043.50 17 REMOV & RE-LAY PIPE 30 IN LF -290 66.00 19 140.00 19 REMOV STIR INLET EA 1 -11 $800.00 $8,800.00), 20 REMOV STIR MANHOLE EA -7 $1,100.00 7 700.00 21 REMOV STIR PIPE LF -984 $7.50 ($7,380.00) 22 MANHOLE JUNCTION BOX 5'X5' EA -7 $3,200.00 22 400.00 23 MANHOLE JUNCTION BOX 4'X4' EA -2 $2,600.00 ($5,200.00) 25 CURB INLET TY 11 )(10') EA -11 $3,500.00 ($38,500.00 26 TRENCH SAFETY SYSTEMS LF 1 -1854 $1.70 ($3,151.80 27 EXCAVATION AND BACKFILL LF -477 $68.00 (132A3r, n0) Page 4 of 4 Contract Quantity Adjustment/Change Order rev. 06/11 29 RC PIPE (CL 111)(30 IN) INCL EXCAVATION AND BACKFILL LF -188 $96.00 ($18,048.00) 30 RC PIPE (CL 111)(36 IN) INCL EXCAVATION AND BACKFILL LF -182 $200.00 36 400.00 1-1 TACK COAT GAL -604 $3.70 ($2,234.80) 2-1 P.C. SIDEWALK CURB RAMP WITH PAVERS TY 1 EA -2 $1,500.00 ($3,000.00) TOTALS: 140 306.82 55