R-12-12-20-E8 - 12/20/2012RESOLUTION NO. R -12-12-20-E8 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with RGM Constructors, L.P. for the Sam Bass Road/Chisholm Trail Modifications and Water/Wastewater Relocation Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 6, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 6 to the Contract with RGM Constructors, L.P. for the Sam Bass Road/Chisholm Trail Modifications and Water/Wastewater Relocation Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 20th day of December, 2012. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk O:\wdox\SCC1nts\0112\ 1204\MUNICIPAL\00264188. DOC Contract Quantity Adjustment/Change Order rev, OW11 Department: Transportation Department Project Sam Bass Road/Chisholm Trail Name: Modifications and W/WW Relocation City Project ID Number ST09BASS Date: 11/6/2012 Change Order/Quantity Adjustment No. 6 - FINAL WONDER DRIVE N. ASPHALT / GRADING, ASPHALT AT RESTAURANT, ASPHALT PATCHING FOR UTILITY WORK (WONDEI SAM BASS CIRCLE AND RAILROAD), ASPHALT AT GATTILAND, THERMO PAVEMENT MARKINGS, HIGH EARLY CONCRETE FC DRIVEWAYS, ANTI GRAFFITI COATING FOR RETAINING WALL, REHAB. EXISTING WW MANHOLES AT MEADOWS, AND BI ITEM INCREASE AND DECREASE FOR FINAL PAY APPLICATION. ASPHALT WORK NOT SHOWN ON PLANS SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval 40 18 58 Amount % Change $3,920,141.61 $193,916.07 ($28,768.58) $165,147.49 $4,085,289.10 $182,922.56 4.48% $111,207.87 2.72% $294130.43 7.20% $4,379,419.53 $459,277.92 0 0 0 City Staff Signature Bill Stablein, City of Round Rock, Project Manager Date -- Approvals Printed Contractor Company Name: RGM Constructors, L.P. Signature For City of Round Rock: Printed Name, EXHIBIT „A„ Page 1 of 4 Page 2 of 4 NOU�DpOO�JDfAi Signature Contract Quantity Adjustment/Change Order Project Name: Quan. Adj./Change Order No.: Printed Name, Title Date Sam Bass Road/Chisholm Trail Modifications and W/WW Rpinratinn 6 - FINAL Change Order Data Item # Item Description Unit Unit Price Amount Time Adjustment (Days) CO # 6 ASPHALT @ WONDER DRIVE - NORTH LS 1 37 702.18 37 702.18 5 CO # 6 ASPHALT IN FRONT OF RESTAURANT LS 1 $2,745.88 $2,745.88 1 CO # 6 ASPHALT PA I CH WORK FOR - UTILITIES LS 1 $24,517.58 $24,517.58 3 CO # 6 ASPHALT PA I CH WORK WR GATTILAND LS 1 18 247.53 $18,247.53 3 CO # 6 THERMO PAVEMENT MARIQNGS LS 1 $16,229.60 16 229.60 2 CO # 6 DRIVEWAYS CY 106.51 $10.00 $1,065.10 0 CO # 6 ANTI GRAFFITI CUA I ING FUR RETAINING WALL LS 1 $2,600.00 $2,600.00 2 CO # 6 REHAB EXISTING WW MH EA 3 $2,700.00 $8,100.00 2 0 0 0 0 0 0 0 0 0 0 0 0 TOTALS: $111,207.87 18 Page 3 of 4 Contract Quantity Adjustment/Change Order SND ROCK TCf�j 2N, oWii Project Name: Sam Bass Road/Chisholm Trail Modifications and W/WW RPloration Quan. Adj./Change Order No.: 6 - FINAL Quantity Adjustment Data Time Adjustment Bid Item # Item Description Unit Unit Price Amount (Days) HMAC 6" Type "A" or "B" (WQ Pond 8 SY 506 $35.00 $17,710.00 0 Sleeve Pipe, 14" dia. D.1., all depths 56 LF 20 $200.00 $4,000.00 0 71 Valves Gate 12" diameter EA 2 $2,600.00 $5,200.00 0 Concrete rip -rap (min. 6" thick) with 77 Energy Dissipators - WONDER DRIVE na RAN RnAn SY 23.11 $65.00 $1,502.15 0 Non -Native Seeding for Erosion 79 Control SY 850 $3.00 2 550.00 0 Pavement Markings - 24 -inch White 92 Strine LF 108 $7.10 $766.80 0 Pavement Markings - 4 -inch Yellow 94 stripe LF 2181 $0.42 $916.02 0 Pavement Markings - 8 -inch White 95 Strine LF 310 $0.84 260.40 0 Pavement Markings -12-inch Yellow 96 strioe LF 18 $3.55 $63.90 0 Work Zone Pavement Markgs 97 " width. White LF 80 2.55 204.00 0 Work Zone Pavement Markings 98 " width, Yellow LF 2010 $2.55, 5125.50 0 Reflectorized Pavement Marking; 100 EA 2 $130.00 $260.00 0 Reflectorized Pavement Marking; 101 EA 1 $102.00 $102.00 0 Reflectorized Pavement Marking; 102 EA 1 $102.00 $102.00 0 P.C. Sidewalk Curb Ramps w/ Pavers 14 EA -33 950.00 31350.00 0 New Concrete Headwall for Prop. 18" 34 gcp EA -1 $1,300.00 1300.00 0 Safety End Treatment for 24" RCP 39 EA -0.5 $2,500.00 ($1,250.00) 0 40 Safetv End Treatment for 42" RCP EA -0.5 $4,200.00 ($2,100.00) 0 70 Valves Gate 10" diameter EA -4 $2,000.00 ($8,000.00) 0 Non -Native Sodding for Erosion 78 Control SY -850 $5.00 ($4,250.00) 0 Protective Fence (Highly visible plastic 81 LF -600 $1.70 1020.00 0 82 Tree Protection Chainlink fencing) LF -208 $2.50 520.00 0 Silt Fence and protection for Grate 87 inlet LF -588 1.70 999.60 0 105 Mailbox Installation (Single) EA -23 210.00 ($4,830.00) 0 DRILL SHAFT (TRF SIG POLE) (30 107 LF -10 $195.00 1950.00 0 114 ICONDT PVC) (SCHD 40 4" LF 1 -40 $26.00, ($1,040.00)10 Page 4 of 4 Contract Quantity Adjustment/Change Order PC o gQcc,_rcxw{ rev. 06/11 137 INS TRF SIG PL AM (S) 1 ARM (44') LUM & iLSN EA -1 $6,800.00 ($6,800.00) 0 91 Pavement Markings - 12 -inch White Stripe LF -61 $3.55 216.55 0 93 Pavement Markings - 4 -inch White Strine LF -910 $0.42 382.20 0 103 Reflectrzd Pavement Marking; Arrows straiahttturn riaht. Type 11 EA -1 $128.00 $128.00 0 99 Work Zone Pvmnt Mrkngs Sym(Remvbl),Arrws(all configs),White EA -9 $155.00 1395.00 0 TOTALS: ($28,768.58)1 0 ROUND ROCK, TEXAS City Council Agenda Summary Sheet PURPOSE. PASSION. PROSPERITY. Agenda Item No. E8. — CONSENT Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 6 with RGM Constructors, LP for the Sam Bass Road/Chisholm Trail Agenda Caption: Modifications and Water/Wastewater Relocation Project. Meeting Date: December 20, 2012 Department: Transportation Staff Person making presentation: Gary Hudder Transportation Director Item Summary: City Council accepted the bid of RGM Constructors, L.P. for $3,920,141.61 on May 26, 2011. Sam Bass Road will be reconstructed from the IH 35 south bound frontage road to Meadows Drive. The scope also includes the reconstruction of Chisholm Trail north from Sam Bass Road for approximately four hundred feet. Quantity Adjustment/Change Order No. 1 provided for installation of a temporary water line due to existing utility conflicts and added two water line services and three wastewater service connections at the cost of $33,725.00. Quantity Adjustment/Change Order No. 2 addressed AT&T conflicts, manhole and inlet adjustments due to gas line conflicts, and added two gate valves and additional roadway striping at a cost of $59,420.03. Quantity Adjustment/Change Order No. 3 covered costs of gravel on Wonder Drive, a four inch drain at Danney Ray's, hand digging for fiber optics, extra fittings, and quantity adjustments for concrete, six inch wastewater line pipe, eight inch gate valves, and the installation of new water line services at a cost of $45,498.56. Quantity Adjustment/Change Order No. 4 covered additional potholes, water line relocations, and several quantity adjustments at a cost of $81,903.27. Quantity Adjustment/Change Order No. 5 covered unforeseen water/wastewater/storm water utility and roadway work, plus additional rip rap at the water detention pond at a total cost of $155,291.77. Quantity Adjustment/Change Order No. 6 covers final quantity adjustments and additional road work for a cost of $82,439.29. The final amount of the contract with RGM Constructors, LP would be $4,379,419.53. Cost: $82,439.29 Source of Funds: 2002 General Obligation Bonds Recommended Action: Approval � J r � z LLJ O X � 0 O w cl Contract Quantity Adjustment/Change Order 11(%D Imo, 7F�lS mv. W11 Department: Transportation Department Project Sam Bass Road/Chisholm Trail Name: Modifications and W/WW Relocation Date: 11/6/2012 City Project Change Order/Quantity Adjustment ID Number ST09BASS No. 6 - FINAL DER DRIVE N. ASPHALT / GRADING, ASPHALT AT RESTAURANT, ASPHALT PATCHING FOR UTILITY WORK (WONDER, BASS CIRCLE AND RAILROAD), ASPHALT AT GATTILAND, THERMO PAVEMENT MARKINGS, HIGH EARLY CONCRETE FOR EWAYS, ANTI GRAFFITI COATING FOR RETAINING WALL, REHAB. EXISTING WW MANHOLES AT MEADOWS, AND BID INCREASE AND DECREASE FOR FINAL PAY APPLICATION. ASPHALT WORK NOT SHOWN ON PLANS SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: $182,922.56 4.480/a $111,207.87 2.72% $294130.43 7.20% 379 419.53 $459,277.92 40 0 18 0 New Contract Time: 58 0 City Staff BE, , lI 26 " 12 Signature Bill Stablein, City of Round Rock, Project Manager Date .'Wks� e- Printed Contractor Company Name: For Contractor: Found of Round Rock: RGM Constructors, L.P. Printed Name, W 11AAVA (L- Z - W -12-, Page 1 of 4 Page 2 of 4 M, MAI Signature Contract Quantity Adjustment/Change Order Printed Name, Title Date Project Name: Sam Hass Road/Chisholm Trail Modifications and W/WW RPlnratinn Quan. Adj./Change Order No.: 6 - FINAL Page 3 of 4 Contract Quantity Adjustment/Change Order rev, at11 Project Name: Sam Bass Road/Chisholm Trail Modifications and W/WW Rploratinn Quan. Adj./Change Order No.: 6 - FINAL Qua nti Ad ustment Data rime Adjustment Bid Item # Item Descri tion Unit Qtv. Unit Price Amount Days) HMAC 6" Type "A" or "B" (WQ Pond 8 " SY 506 $35.00 $17,710.00 0 Sleeve Pipe, 14" dia. D.1., all depths 56 20 200.00 $4,000.00 0 71 Valves Gate 12" diameter 2 $2,600.00 5 200.00 0 Concrete rip -rap (min. 6" thick) with JEA Energy Dissipators - WONDER DRIVE 77 23.11 $65.00 $1,502.15 0 Non -Native Seeding for Erosion 79 lControl SY 850 3.00 $2,550.00 0 Pavement Markings - 24 -inch White 92 Strine LF 108 $7.10 $766.80 0 Pavement Markings - 4 -inch Yellow 94 Stripe LF 2181 $0.42 $916.02 0 Pavement Markings - 8 -inch White 95 Strina LF 310 $0.84 $260.40 0 Pavement Markings -12-inch Yellow 96 stripe LF 18 $3.55 $63.90 0 Work Zone Pavement Markgs 97 (Removablal. 4"width. White LF 80 $2.55 $204.00 0 Work Zone Pavement Markings 98 " LF 2010 $2.55 5125.50 0 Reflectorized Pavement Marking; 100 " EA 2 $130.00 $260.00 0 Reflectorized Pavement Marking; 101 EA 1 $102.00 $102.00 0 Reflectorized Pavement Marking; 102 EA 1 $102.00 $102.00 0 P.C. Sidewalk Curb Ramps w/ Pavers 14 EA -33 $950.00 31350.00 0 New Concrete Headwall for Prop. 18" 34 gcp EA -1 $1,300.00 1300.00 0 Safety End Treatment for 24" RCP 39 EA -0.5 $2,500.00 1250.00 0 40 Safety End Treatment for 42" RCP EA -0.5 $4,200.00 2 100.00 0 70 Valves Gate 10" diameter EA -4 $2,000.00 ($8,000-00) 0 Non -Native Sodding for Erosion 78 Control SY -850 $5.00 ($4,250.00) 0 Protective Fence (Highly visible plastic 81 LF -600 $1.70 1020.00 0 82 Tree Protection Chainlink fencin LF -208 $2.50 520.00 0 Silt Fence and protection for Grate 87 inlet LF -588 $1.70 999.60 0 105 Mailbox Installation (Single) EA -23 $210.00 ($4,830.00) 0 DRILL SHAFT (TRF SIG POLE) (30 107 LF -10 $195.00 1950.00 0 114 ICONDT PVC) (SCHD 40 4" LF -40 $26.00($1,040.00).0 Page 4 of 4 Contract Quantity Adjustment/Change Order rev. 06111 137 INS TRF SIG PL AM (S)1 ARM (44') LUm & iLSN FA -1 $6,800.00 ($6,800.00) 0 91 Pavement Markings -12-inch White Stripe LF -61 $3.55 216.55 0 93 Pavement Markings - 4 -inch White Strine LF -910 0.42 382.20 0 103 Reflectrzd Pavement Marking; Arrows straiallthurn riaht. Tvne 11 FA -1 $128.00 128.00 0 99 Work Zone Pvmnt Mrkngs Sym(Remvbl),Arrws(all configs),White EA -9 $155.00 1395.00 0 TOTALS• 28 768.58 0