R-13-01-24-K3 - 1/24/2013RESOLUTION NO. R -13-01-24-K3 WHEREAS, the City of Round Rock has duly advertised for bids for the Southwest Downtown Infrastructure Improvements — San Saba Street and West Liberty Avenue Project, and WHEREAS, Patin Construction, LLC has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Patin Construction, LLC, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Patin Construction, LLC for the Southwest Downtown Infrastructure Improvements — San Saba Street and West Liberty Avenue Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 24th day of January, 2013. ATTEST: SARA L. WHITE, City Clerk O:\wdox\S CC Ints\0112\ 1304\MUNICIPAL\00265873. DOC/rmc City of Round Rock, Texas Kris yr kk t-Fte u) N114YbrTr-o JM ROUND ROCK, TEXAS City Council Agenda Summary Sheet PURPOSE PASSION. PROSPERITY. Item No. K3. Consider a resolution authorizing the Mayor to execute a contract with Patin Construction LLC for the Southwest Downtown Infrastructure Improvements — San Saba Street and Agenda Caption: West Liberty Avenue Project. Meeting Date: Department: January 24. 2013 Transportation Staff Person making presentation: Gary Hudder Transportation Director Item Summary: The scope of work for Southwest Downtown Infrastructure Improvements (San Saba Street and Liberty Street) from San Saba Street to Round Rock Avenue and San Saba Street from Main Street to Round Rock Avenue includes all items necessary for the successful construction of infrastructure and surface improvements for West Liberty Avenue and San Saba Street, consistent with the work previously completed in southwest downtown. The bid opening was held on December 5, 2012 at 2:00 p.m. Two sealed bids were received. Patin Construction, LLC submitted a bid in the amount of $3,470,511. Cash Construction Company, Inc. submitted a bid in the amount of $4,182,743. The apparent low bid of $3,470,511 was submitted by Patin Construction, LLC. After reviewing and certifying the attached bid tabulation, Page Southerland Page and the Transportation Department staff recommend that Patin Construction Company, LLC, with a base bid of $3,470,511 be awarded the contract for the construction of this project. The Engineering estimate for this project was $4,200,000. Cost: Source of Funds: $3,470,511 Type B Corporation Recommended Action: Approval James c Alvis, PE Vice President ARCHITECTURE INTERIORS CONSULTING ENGINEERING December 06, 2012 Mr. Gary Hudder, Transportation Director City of Round Rock Transportation Department 2008 Enterprise Dr. Round Rock, TX 78664 Attn: Todd Keltgen, Operations Manager, Transportation Services, City of Round Rock RE: SWDT Infrastructure Improvements Project - San Saba and West Liberty Streets Dear Mr. Hudder Bids were opened at 2:00 on December 5, 2012, for the Southwest Downtown Infrastructure Improvements Project- San Saba and West Liberty Streets. PSP has reviewed the documents and tabulated the bids. The bid tabulation is attached and will be forwarded electronically. The Bid documentation appears to be in order. ., was the, appamnt IwArb-i-dide-r- We Focco-M—mend that the prqjerat be, awarded to Patin on this basis. Please call me at 512-382-3404 if you have any questions. Sincerely, James C Alvis, PE Vice President, Director of Civil Engineering Xc: File 109034.01 AUSTIN I PAGE SOUTHERLAND PAGE, LLP DALLAS 400 West Cesar Chavez Street tel: 512 472 6721 HOUSTON Suite 500 fax: 512 477 3211 i WASHINGTON DC Austin, Texas 78701 www.pspaec.com BID TABULATION THE CITY OF ROUND ROCK Infrastructure Development and Construction Management 2008 Enterprise Dr. BY: ERM, PSP Round Rock, Texas. 78664 DATE: 12/6/2012 (512) 218-5555 SHEET: I of 1 RI.N. III Cash Construction Jraun Ldt; CIINN ONTRACT: Southwest Downtown - San Saba Street and West Liberty Avenue Cris Mardnka Jimmy Patin 3800 W. 2nd Street 18607 Heatherwide Blvd. Pflugerville, TX 78660 Taylor, TX 76574 (512) 251-2578 (512) 269-1071 jimmy@padncon.com cris@ccctex.com Statement of Safety? Y Addendum(s) Y Bid Bond? y Statement of Safety? Y Addendum(s) Y Bid Bond? Y 111,11!" 11"M 11 1;�:�:!,,;ilih"!,,.-,.;j�j.,;!��7fi� 11111i'�4!1i!H$1110 51110110i,1I 1 M1 IN IJI'm UNIT ITEM A ITEM DESCRIPTION UNIT QTY. PRICE COST PRICE COST Demolition Street Excavation, Excavation, complete in place and Properly Dispose Offsite (by Method I B - Plan Quantity). CY 8,962 $20.00 $179,240.00 $20-00 $179,240.00 Hemove F.L;. L;oncrete L;urb and Gutter and Properly Dispose Offsite, complete in place per 2 lineal foot, LF 485 $6.00 $2,910.00 P.00 $1,455.00 Remove P.C. Concrete Sidewalk, Driveway, and other Miscelleaneous Concrete Appurtenances and Properly Dispose Offsite, 3 complete in place per square foot SF 8,609 $2.00 $17,218.00 $3.00 $25,827.00 Remove Trees and Properly Dispose site, 4 complete in place per each EA 39 $300.00 $11,700.00 $250-00 $9,750.00 Remove, Wrap, and Manifest Asbestos Containing Pipe (Sheet C2.01), complete in 5 place. LF 25 $80.00 $2,000.00 $100.00 $2,500.00 Environmental Tree Protective Fencing Type A Chain Link fence, Temporary Tree Protection Fencing, , complete in place, maintained thoughout the 6 project, per lineal foot. LF 2,159 $3.00 $6,477.00 $3.00 $6,477.00 Tree Protective Fencing Type B Wood Fence - Tree Protection - Tree Bark Protection Planking, complete in place, maintained 7 thoughout the project, per lineal foot. LF 141 $6.50 $916.50 $5.00 $705.00 Rock Berm Protection for areas of Concentrated Runoff, complete in place, 8 maintained thoughout the project. LF 20 $20.00 $400.00 $33-00 $660.00 Filter Inlet Protection (includes area inlets, curb inlets, and trench drains), complete in 9 place, maintained thoughout the project. EA 21 $80.00 $1,680.00 $75,600 $1,575.00 Slit Fence and/or Triangular Filter Dike, complete in place, maintained thoughout the 10 project- LF 870 $2.50 $2,175.00 $2.00 $1,740.00 Stabilized Construction Entrance, complete in 11 place, maintained thoughout project. EA 1 $2,000.0.0 $2,000.00 $1,000,00 $1,000.00 Contech StormFilter" per plans, complete in place, maintained thoughout the project and unit cleaned and filter contents replaced at 12 completion of project. f EA 1 $100,000.00 $100,000.00 $100,000.00 $100,000.00 Page 1 of 10 BID TABULATION THE CITY OF ROUND ROCK Infrastructure Development and Construction Management 2008 Enterprise Dr. BY: ERM, PSP Round Rock, Texas. 78664 DATE: 1216/2012 (512) 218-5555 SHEET: 1 of ............ Cash Construction Patin Uonsuuctlon LLC CONTRACT: Southwest Downtown - San Saba Street and West Liberty Avenue Cris Martinka Jhnmy Patin 380 W. 2nd Street 18607 Heatherwide Blvd. Taylor, TX 76574 Pflugerville, TX 78660 (512) 251-2578 (512) 269-1071 ommy@patincon-com ctis@ccctex.com Statement of Safety? Y Addendum(s) Y Bid Bond? Y Statement of Safety? Y Addendum(s) Y Bid Bond? Y UNIT UNIT ITEM I ITEM DESCRIPTION UNIT QTY. PRICE COST PRICE COST Contractor management of activities associated with and Contractors full compliance with Texas Commission on Environmental Quality Regulations and Programs specifically including, but not limited to, Storm Water Pollution Prevention Plan, Water Pollution Abatement Plan and Sewage Collection System Plan requirements. (These project documents are hereby made part of the Contract). Contractor documentation of compliance is also inclued as a deliverable for 13 this task LS 1 $5,000.00 $5,000.00 $2,500,00 $2,500.00 Miscelleaneous Total Mobilization Payment (distributed per 14 Spec Section 700) LS 1 $120,000.50 $120,000.50 $130,W0.00 $130,000.00 Remove Existing Fountain and Components and Re -install, including electrical service, on property Owners property, complete in place 15 per lump sum. LS 1 $2,500.00 $2,500.00 $2,500.00 $2,500.00 Remove Existing Chain Link Fence and Re - Install including man gates and driveway gate on property Owners property, complete in 16 place per linear foot. LF 250 $60.00 $15,000.00 $20.00 $5,000.00 Remove Existing Grease Trap in ROW at Golden Chick at NE end of West Liberty Avenue, and dispose of all materials including contents property, and coordinate reinstallation of new on same day, complete in place per lump sum, Install New Grease Trap on Owner Property at Golden Chick at NE end of West Liberty Avenue same day as demo, coordinate with Owner to minimize Owner disruption, 17 complete in place per lump sum, LS 1 $6,000.00_ $6,000.00 $5,000.00 $5,000.00 Install New Dumpster Pad (Concrete Pad Only) on Owner Property at Golden Chick at NE end of West Liberty Avenue, complete in 18 place per lump sum, LS 1 $1,500.00 $1,500.00 $2,500.00 $2,500.00 Page 2 of 10 BID TABULATION THE CITY OF ROUND R0CK Infrastructure Development and Construction Management 2008 Enterprise Dr. BY: ERM, PSP Round Rock, Texas. 78664 DATE: 12/6/2012 (512) 218-5555 SHEET: 1 of Cash Construction raun Construcillon CONTRACT: Southwest Downtown - San Saba Street and West Liberty Avenue Cris Martinka 18607 Heatherwide Blvd. Jimmy Patin 3800 W. 2nd Street Pflugerville, TX 78660 Taylor, TX 76574 (512)251-2578 (512)269-1071 cris@ccctex.com jinnny@patincon.com Statement of Safety? Y Addendum(s) Y Bid Bond? y Statement of Safety? Y Addendum(s) Y Bid Bond? Y OWN; il i'21iffliii! N I 11E 1 " .; I I 17, UNIT UNIT ITEM A ITEM DESCRIPTION UNIT QTY. PRICE COST PRICE COST Remove and Relocate Menu Board, including foundation to match existing, electrical and lighting From ROW at Golden Chick at NE end of West Liberty Avenue to Owner Property, coordinate with -Owner to minimize Owner 19 disruption, complete in place per lump sum, LS 1 $5,000.00 $5,000.00 $5,000.00 $5,000.00 1 rencri safety an and Trench Safety (all 20 depths), complete in place. LF 7,855 $1.00 $7,855.00 $0.50 $3,927.50 New 6' tall Chain Link Fencing, man gate(s), and driveway gate(s), as needed, installed 21 complete in place per lump sum, LS 100 $40.00 $4,000.00 $301,00 $3,000.00 Install Type A Survey Marker(s) with Adjustable Valve Box, complete in place per each, location to be as directed by City Project 22 Manager. EA 1 $300.00 $300.00 $1,5010.00 $1,500.00 New Dumpster Pad Structure; including but not limited to: Sawcut, Remove Pavement, Base and Fill under footprint of New Double Dumpster Pad at West end of West Main Street, and dispose property, Install New Double Dumpster Pad, Walls. Bollards, Gates and Warning Signs, etc., per plans, complete 23 in place per lump sum, LS 1 $10,000.00 $10,000.00 $5,000.00 $5,000.00 Pavement, Flat Work Subgrade Preparation - 6* Scarified Moisture Conditoned then Recompacted Subgrade Materials (CH Subgrade Area), complete in 24 place per square yard. SY 13,355 $3.00 $40,065.00 $5.00 $66,775.00 Asphalt Stabilized Base: Hot Mix Asphaltic Concrete Base 10.5" Thick TxDOT Item 340, Type B (Black Base), complete in place per 25 square yard (Measurement Method B). SY 8,447 $55.00 $464,585.00 $47.00 $397,009-00 Asphalt Stabilized Base: Hot Mix Asphaltic Concrete Base 8" Thick TxDOT Item 340, Type B (Black Base), complete in place per square yard (Measurement Method B) (under, and 1.5 feet behind, roadway curbs and under 26 concrete pavement at hammerhead). SY 1,443 $42.00 $60,606.00 $37.00 $53,391.00 Hot Mix Asphaltic Concrete Pavement Surface Course, 2 inches, Type D, complete in place 27 per square yard, (Measurement Method B). SY 6,572 $13.00 $85,436.00 $13.00 $85,436.00 Page 3 of 10 BID TABULATION THE CITY OF ROUND ROCK Infrastructure Development and Construction Management 2008 Enterprise Dr. BY: ERM, PSP Round Rock, Texas. 78664 DATE: 12/6/2012 (512) 218-5555 SHEET: 1 of CONTRACT: Southwest Downtown - San Saba Street and Cash Construction ratin ons on LLU West Liberty Avenue Cris Martinka Jimmy Patin 3800 W. 2nd Street 18607 Heatherwide Blvd. Taylor, TX 76574 Pflugerville, TX 78660 (512) 251-2578 (512) 269-1071 jinuny@patincon.com cris@ccctex.com Statement of Safety? Y Addendum(s) Y Bid Bond? y Statement of Safety? Y Addendum(s) Y Bid Bond? Y MY ;;ill INN,! 5-Prii'N 1HIMM 21 110! 1 NE UNrr UNIT ITEM I ITEM DESCRIPTION UNIT QTY. PRICE COST PRICE COST Construct Portland Cement Reinforced Concrete Pavement with integral monolithic curb (-250 If), Pavement 8 -Inch minimum Thickness, complete in-place per square foot 28 (hammerhead). SF 3,464 $8.00 $27,712.00 $6.00 $20,784.00 Construct Portland Cement Reinforced Concrete Sidewalks to 4- Inch Thickness, complete in-place per square foot ( as needed to match ROW back to walk on site at each 29 address); SF 300 $6.00 $1,800.00 $6.00 $1,800.00 Sidewalk Concrete Paver Units, Sidewalk Paver Section: Sidewalk Concrete Paving Unit (2-3/8" thick) with 1" Sand, 6" min. 2 sack Cement Stabilized Crushed Limestone Flexible Base, and 6" Re -Compacted Moisture Conditioned Subgrade, complete in place per 30 square foot, SF 30,464 $6.50 $198,016.00 $5.50 $167,552.00 Sidewalk Curb Ramp Concrete Paving Unit with 1" Sand, 6" Cement Stabilized Crushed Limestone Flexible Base, and 6" Re - Compacted Moisture Conditioned Subgrade, including contrasting detectable warning unit 31 pavers, complete in place per each, SF 933 $8.00 $7,464.00 $6.00 $5,598.00 Portland Cement Reinforced Concrete 32 Driveway, complete in place per square foot. SF 7,525 $7.00 $52,675.00 $6.00 $45,150.00 P_or_tra_n37e_ment Reinforced Concr-e-te-MUffi-r 33 Gutter, complete in place per lineal foot. LF 3,408 $20.00 $68,160.00 $20,00 $68,160.00 P_ort ra_nU_Ce_ment Reinforced Concr-e—te Vaffe—y 34 Gutter, complete in place per lineal foot. LF 1,148 $32.00 $36,736.00 $42.00 $48,216.00 Portland Cement Reinforced Concrete Retainer Curb Type "A", complete in place per 35 lineal foot (includes tree wells). LIF 3,125 $14.00 $43,750.00 $25o00 $78,125.00 Mortared Rock Limestone Block (8" x 8" x up to 24") Wall, with mortared joints, up to 3- feet tall, including foundation, complete in place per 36 square foot. SF 200 $20100 $4,000.00 $40.00 $8,000-00 Portland Cement Reinforced Concrete Handicap Ramp to Structure (each 5' wide and 20' long with 5'x 5' landings at each end), 37 complete in place per lineal foot (if needed). LF 20 $150.00 $3,000.00 $60.00, $1,200.0 I 1 Signage Striping Page 4 of 10 BID TABULATION THE CITY OF ROUND ROCK Infrastructure Development and Construction Management 2008 Enterprise Dr. BY: ERM, PSP Round Rock, Texas. 78664 DATE: 12/6/2012 (512) 218-5555 SHEET: I of R-77=77— _sR g Cash Construction Irann k;onstrucuon LLIL; CONTRACT: Southwest Downtown - San Saba Street and West Liberty Avenue Cris Marfinka 18607 Heatherwide Blvd. Jimmy Patin 3800 W. 2nd Street Taylor, TX 76574 Pflugerville, TX 78660 (512) 251-2578 (512) 2694071 jimmy@padneon.com cris@ccctex.cwn Statement of Safety? Y Addendum(s) Y Bid Bond? y Statement of Safety? Y Addendum(s) Y Bid Bond? Y M 111:I:IxI M? 1 fil 11 7T, II517itlY UNIT UNIT ITEM i ITEM DESCRIPTION UNIT QTY. PRICE COST PRICE COST Contractor Traffic Control Plan including Barricades, Signs, Traffic handling, throughout 38 the project, complete in place per month. LS 1 $20,000.00 $20,000.00 $10,000.00 $10,000.00 Traffic Signs (24" Stop), including "ALL WAY" or "4 WAY", and STREET NAMES SIGNS, including installation per "Stop Sign/Street Name Assembly Detail", complete in place per 39 each sign. EA 18 $500.00 $9,000.00 $225.00 $4,050.00 Accessible Parking Signs and Fire Zone Signs including installation per "Typical Sign Mounting Detail", complete in place per each 40 sign. EA 8 $500.00 $4,000.00 $175.00 $1,400.00 Reflectorized Type I Thermoplastic Pavement Markings; 4 inches in width, 100 mils in 41 thickness per lineal foot LF 1,963 $1.00 $1,963.00 $1.50 $2,944.50 Reflectorized Type I Thermoplastic Pavement Markings; 8 inches in width, 100 mils in 42 thickness yellow in color per lineal foot LF 1,348 $2.50 $3,370.00 $2.25 $3,033.00 Reflectorized Type I Thermoplastic Pavement Markings; 24 inches in width, 100 mils in 43 white in color per lineal foot LF 87 $8.00 $696.00 $12.00 $1,044.00 -thickness Street Lights 44 Street Light Including Foundation, per plans, complete in place. EA 27 $6,000.00 $162,000.00 $5,350.00 $144,450.00 45 T79r5—ia70M;T6 PVC Street Light Conduit, complete in place. LF 1,350 $6.00 $8,100.00 $5.20 $7,020.00 46 I" Dia. SCH40 PVC Street Light Conduit, complete in place. LF 2,450 $6.00 $14,700.00 $5.50 $13,475.00 47 4* Dia. SCH40 PVC Street Light C-o-nTu—it, complete in place. LF 2,900 $10.00 $29,000.00 $9.00 $26,100-00 120V, 20A GFI Receptacle With Single Gang 48 Back Box 2-3/4" and Single Gang Vertical In - Use Cover, complete in place per each, EA 27 $500.00 $13,500.00 $375..100 $10,125.00 49 Electric Pull Box, H20 load capable, color to match pavers, complete in place. EA 18 $700.00 $12,600.00 $630,00 $11,340.00 Complete Street Electric Wiring, Furnishing 50 and Installation, as shown on the plans and specifications, complete in place. LS 1 $30,000.00 $30,000-00 $28,500.00 $28,500-00 Page 5of10 BID TABULATION THE CITY OF ROUND ROCK Infrastructure Development and Construction Management 2008 Enterprise Dr. BY: ERM, PSP Round Rock, Texas. 78664 DATE: 12/6/2012 (512) 218-5555 SHEET: 1 of 0 'R 01,0106, Cash Construction ralun UonStraCUon CONTRACT: Southwest Downtown - San Saba Street and West Liberty Avenue Cris Martinka 18607 Heatherwide Blvd. Jimmy Patin 3800 W. 2nd Street Pflugervitle, TX 78660 Taylor, TX 76574 (512) 251-2578 (512) 269-1071 jimmy@patincon.com cris@ccctex.com Statement of Safety? Y Addendum(s) Y Bid Bond? y Statement of Safety? Y Addendum(s) Y Bid Bond? Y OR 211IA UNIT UNIT ITEM i ITEM DESCRIPTION UNIT QTY. PRICE COST PRICE COST Trees, Landscape, & Irrigation ?,�Fasso�Ing, complete in place per square 51 yard, SY 15 $5.00 $275.00 $6.00 $330.00 Hydromulch restoration including temporary irrigation of Contractor temporary storage, temp. office and laydown area, complete in 52 place per square yard, SY 1,500 $0.80 $1,200.00 $0,50 $750.00 4" Sch. 40 PVC Irrigation sleeve, including all 53 fittings and appurtenances, complete in place. LF 1,864 $9.00 $16,776.00 $5.00 $9,320.00 Sch 40 PVC Irrigation Line including all fittings 54 and appurtenances, complete in place. LF 1,230 $4.00 $4,920.00 $1.20 $1,476.00 T-f/TrW-ate-r 9-eter, including cast Iron `va!v—e 55 box, complete in place. EA 1 $800.00 $800.00 $1,500.00 $1,500.00 T-7727TFac-Rfro-w-Preventer, Inc ludIng "Eca-57i—ron 56 valve box, complete in place. EA 1 $400.00 $400.00 $680M $680.00 1 -1/2 -Gate Valve, including cast iron valve 57 box, complete in place. EA 1 $600.00 $600.00 $100-00 $100.00 Irrigation Valves with Battery Operated Solenoid, including cast iron valve box, 1 58 complete in place. EA 2 $170.00 $340.00 $280.00 $560.00 Tree Bubblers, including 4' of flex pipe, fittings 59 and appurtenances, complete in place. EA 26 $2100 $572.00 $26.00 $676.00 Installation of Street Tree including excavation (6'x 6'x 30"), planting mix, tree installation (trees to be provided by City of Round Rock), and mulch installation (mulch provided by City 60 of Round Rock) complete in place per each, EA 13 $6,000.00 $78,000.00 $270.00 $3,510.00 Installation of Tree Well w/ Tree Grate and wl Mulch including excavations, concrete retainer curbs, weather-proof grounded electrical receptacle, grate retainer, and tree grate, installation of mulch (mulch provided by City of 61 1 Round Rock), complete in place per each, EA 13 $7,000.001 $91,000.00 1 $4,600.00 1 $59,800.00] Page 6 of 10 BID TABULATION THE CITY OF ROUND ROCK Infrastructure Development and Construction Management 2008 Enterprise Dr. BY: ERM, PSP Round Rock, Texas. 78664 DATE: 12/6/2012 (512) 218-5555 SHEET: 1 of 00! N!"! 10 !1! 0 N NI 001 $!IN, 90MIN 0 111! iiii!VII ��P, w N!"Kii! 10 lip 10p. li�i i�01111 111 111! !ill !I0 0I Y!� 4 N i. q Cash Construction rann Construedon LLU CONTRACT: Southwest Downtown - San Saba Street and West Liberty Avenue Cris Martinka 18607 Heatherwide Blvd. Jimmy Patin 3800 W. 2nd Street Pflugerville, TX 78660 Taylor, TX 76574 (512) 251-2578 (512)269.1071 cris@ccctex.com jimmy@patincon.com Statement of Safety? Y Addendum(s) Y Bid Bond? y Statement of Safety? Y Addendum(s) Y Bid Bond? Y UNIT UNI ITEM 4 ITEM DESCRIPTION UNIT QTY. PRICE COST PRICE COST Installation of Tree Well For Existing Trees w/ Mulch including excavations, concrete retainer curbs, weather-proof grounded electrical receptacle, installation of mulch (mulch provided by City of Round Rock), complete in 62 place per each, EA 11 $7,000.00 $77,000.00 $2,500.00 $27,500.00 Waste Water New WW Manhole, 48" Dia., including ring adjustments, lid, interior coatings, etc, 63 complete in place. EA 8 $5,000.00 $40,000.00 $3,500.00 $28,000.00 Ve—w-W-0-ro-p-Panhole, 48" Dia., complete in 64 place per each, EA 4 $6,000.00 $24,000.00 $4,000.00 $16,000.00 6" PVC ASTM D2241 SDR26 Pipe, complete 65 in place. LF 368 $73.00 $26,864.00 $70.00 $25,760.00 8" PVC ASTM D2241 S13R26 Pipe, complete 66 in place. LF 1,362 $120.00 $163,440.00 $80.00 $108,960.00 2241 SDR26 Pipe, complete 67 in place. LF 167 $160.00 $26,720.00 $90.00 $15,030.00 15" PVC ASTM D3034 SDR26 Pipe, complete 68 in place. LF 126 $150.00 $18,900.00 $110.001 $13,860.00 can Out Assembly for 6" PVC ASTM D2241 69 SDR26 Pipe, complete In place. EA 9 $600.00 $5,400.00 $900,00 $8,100.00 can Out Assembly for 8" PVC AST9TFffW 70 SDR26 Pipe, complete in place. EA 5 $700.00 $3,500.00 $1,000.00 $5,000.00 Reconnect existing wastewater service with new 4 -inch dia. (min.) transition pipe from existing services to new stubs. service size shall match existing where existing is larger than 4" dia. pipe, complete in place per lineal 71 foot, LF 600 $92.00 $55,200.00 $00.1010 $36,000.00 Abandon In Place Existing WW Manholes, 72 complete in place per each, EA 5 $700.00 $3,500.00 $500.00 $2,500-00 Water 12- PIPE (PVC AWWA C-900 Class 200, or DI AWWA C-100 Min. Class 200), complete in 73 place. LF 1,445 $102.00 $147,390.00 $50.00 $72,250.00 8- PIPE (PVC AWWA C-900 Class 200, or DI AWWA C-100 Min. Class 200), complete in 74 place. LF 622 $80.00 $49,760.00 $40.00 $24,880.00 6- PIPE (DI AWWA C-100 Min. Class 200), 75 complete in place. LF 1 $70.00 , $70.00, $100.00, $100.001 Page 7 of 10 BID TABULATION THE CITY OF ROUND ROCK Infrastructure Development and Construction Management 2008 Enterprise Dr. BY: ERM, PSP Round Rock, Texas. 78664 DATE: 12/6/2012 (512) 218-5555 SHEET: 1 of CONTRACT : Southwest Downtown - San Saba Street and Cash Construction Iratin Construction A West Liberty Avenue Cris Martinka 18607 Heatherwide Blvd. Jimmy Patin 3800 W. 2nd Street Pflugerville, TX 78660 Taylor, TX 76574 (512) 251-2578 (512) 269-1071 cris@ccctex.com jinnny@padneon.com Statement of Safety? Y Addendum(s) Y Bid Bond? Y Statement of Safety? Y Addendum(s) Y Bid Bond? Y 1N;Nl1'ij M !Offi i�;100* ON R illw,'l [idqjw ii;l i i0li ill 11 MOIR T;; lilt! 11; 1111M X �1111491111'10N!21111 Iiii 110 0 H 1: t! IM 011110i I 4M .•j:i::':y:,: i.'j; i i � �' I i i � 2 i �' I i 0. 1 Mill!' 1•+-7 j, 1 ".1 UNIT UNIT ITEM I ITEM DESCRIPTION UNIT QTY. PRICE COST PRICE COST 4- PIPE (PVC AWWA C-900 Class 200, or DI AWWA C-100 Min. Class 200), complete in 76 -place. LF 678 $75.00 $50,850.00 $35.00 $23,730.00 Domestic Potable Water Service Line, 77 complete in place. LF 500 $45.00 $22,500.00 $30:00 $15,000.00 Installing or Reconnecting Lateral Water Service to Existing, or Replaced Pipe (Single 1 - 78 1/2" Water Service Connection) EA 13 $1,300.00 $16,900.00 $1,500,00 $19,500.00 79 12" Gate Valve, complete in place. EA 26 $1,400.00 $36,400.00 $2•,950;010 $76,700.00 80 8" Gate Valve, complete in place. EA 10 $1,300.00 $13,000.00 $1,600.00 $16,000.00 are_Vave, comp Iete in place, not 81 associated with Fire Hydrant Assembly EA 0 $1.800.00 $0.00 $1'500.00 $0.00 82 4" Gate Vale, complete in place. EA 13 $1,000.00 $13,000.00 $935,00 $12,155.00 Fire Hydrant Assembly (per detail), includes leads and 6" Gate Valve, complete in place per 83 each. EA 4 $4,400.00 $17,600.00 $4,800.00 $19,200.00 Ductile Iron Fittings 4 inch through 12 inch, 84 complete in place per ton, TON 2 $14,000.00 $28,000.00 $19,500.00 $39,000.00 Jacking or Boring 18" Steel Encasement Pipe, ASTM A-252, Grade 2 , including grouting, 85 complete in place per lineal foot, LF 60 $600.00 $36,000.00 $400.00 $24,000.00 TTrSt-e-eTen—casement Pipe, ASTM A-252, 86 Grade 2, complete in place LF 610 $60.00 $36,600.00 $70.00 $42,700.00 18" Steel Encasement Pipe, ASTM A-252, 87 Grade 2, complete in place LF 320 $80.00 $25,600.00 $951-00 $30,400.00 Storm Water 88 5' Curb Inlet, complete in place. EA 5 $4,000.00 $20,000.00 $2,500.00 $12,500.00 89 10' Curb Inlet complete in place. EA 1 $6,500 00 $6,500.00 $3,'ON-00, $3,000.00 go 2'x2' Area Inlet, complete in place. EA 6 $2,200.00 $13,200.00 $1,000.00 $6,000.00 91 3'x3' Area Inlet, complete in place. EA 3 $3,500.00 $10,500.00 $1:i200.00 $3,600.00 92 4'x4' Area Inlet, complete in place. EA 1 $3,600.00 $3,600.00 $1,500.00 $1,500.00 Trench Drain (Type A) and Grate 8" x 10' (EJIW #V-7381), complete in place per 93 each.linear foot. LF 10 $1,000.00 $10,000.00 $300.00 $3,000.00 Trench Drain (Type A) and Grate 10" x 10' (EJIW #V-7382), complete in place per 94 each.linear foot. LF 10 $1,100.00 $11,000.00 $320.00 $3,200.00 Trench Drain (Type B) and Grate 10" x 16' (EJIW #V-7382), complete in place per 1 1 95 each.linear foot. . LF 16 $1,000.00 $16,000.00 $330.001 $5,280.00 Page 8 of 10 BID TABULATION THE CITY OF ROUND ROCK Infrastructure Development and Construction Management 2008 Enterprise Dr. BY: ERM, PSP Round Rock, Texas. 78664 DATE: 12/6/2012 (512) 218-5555 SHEET: 1 of : Southwest Downtown - San Saba Street and Avenue TEM 4 ITEM DESCRIPTION Dia., including x- Excavation ancT-- 96 Backfill, complete in place. la.—,including xcava Ionan97 Backfill, complete in place. la., Inc u IngExcavation—an-T- 98 xcava Ionan98 Backfill, complete in place. Dia., including Excavation an 99 Backfill, complete in place. la., Inc U Ing xcava Ion an 100 Backfill, complete in place. la., Inc U IngExcavation---a-ncr- 101 Backfill, complete in place. Dia., including Excavation an 102 Backfill, complete in place. recast tormwater Manhole, compete Ir 103 place per each, recast tormwater Manhole, compete Ir 104 place per each, Precast ormwater Manhole, compete it 105 place per each, Outfall Headwall with Energy Dissipaters and 106 Rip Rap for 42" Dia. RCP, complete in place. Duct Bank Duct Bank ( lectricallommunlcatlons, 107 complete in place. 10 each 4" Schedule 40 PVC conduits in duct 108 bank (Communications), complete in place T7--D-u-c-t-ffa-nR7Electrlca1 l09 Communications), complete in place. Duct Bank (Electrical 110 Communications), complete in place. 4- uct an(Electrical & 111 Communications), complete in place. uct an c ectnca ommurncatio s 112 complete in place. Duct BanW (Electrical& 113 Communications), complete in place. 1 an or 0Duct Bank (Elec-tric-aT& 114 Communications), complete in place. L11"11" LF LF LF LF LF LF LF EA EA EA 96 148 65 636 394 115 30 4 3 1 Cash Construction Cris Martinka 18607 Heatherwide Blvd. Pflugerville, TR 78660 (512)251-2578 cris@ccctex.com Statement of Safety? Y Addendum(s) Y Bid Bond? Y Lil;yljalln.YM;Hnr:ili:.ipripy ti . i i ..::n ica lih:auutn i:u ,.I:n: UNTf PRICE $80.00 $130.00 $140.00 $200.00 $260.00 $340.00 EA 1 $9 LF 168 9 LF LF LF LF LF LF LF 157 116 878 137 115 72 55 $190.00 $230.00 $2,60.00 $360.00 $310.00 $410.00 Page 9 of 10 Jimmy Patin 38M W. 2nd Street Taylor, TR 76574 (512)269-1071 jimmy@patincon.com Statement of Safety? Y Addendum(s) Y Bid Bond? Y ''.RMii Ix'. I ujii:;iiip;JA I11110..I1;:�:+iiGwfu?i'U!Id:'lly!i :�ra::;;lkl�nna::::::�xu�° aL: .y, :.6 is ai•:q;.6,;� " UNIT COST $4,8 COST PRICE $7,680.00 $50,00. $17,760.00 $60.00 $8,450.00 $70.00 $89,040.00 $8:00. $78,800.00 $90,00 $29,900.00 $100.00 $10,200.00 WQ 00 $19,600.00 $4,000.00 $19,500.00 $5,000.00. $8,000.00 _$15,000:00 $9,000.00 $2,5000 $33,600.00 $190.00 $29,830.00 $170.00 $26,680.00 $220.00 $228,280.00 $230.00 $49,320.00 $350.00 $31,050.00 $25-0.00 $22,320.00 $290.00 $22,550.00 $360.00 $4,550. $50,880. $11,500. $3,600. $16,000. $15,000. $15,000. $31 $201,940 $47,950 $28,750 $19 BID TABULATION THE CITY OF ROUND ROCK Infrastructure Development and Construction Management 2008 Enterprise Dr. BY: ERM, PSP Round Rock, Texas. 78664 DATE: 1216/2012 (512) 218-5555 SHEET: I of !, I. : j M 'IrFii �",! 10! i! I i ilil !�l lU 1411�� 111!! 0 !1!!! qi isK �' I 11ii i!!! !I! ilIII. 11!010! 1-H, 0! 11.0, 1!1! 1111 1!i I ;I 51i ml! 11�liiliqli�loll�.-R'qv Evil! _'010 I I .4".0 �jq mg.1 !:-'m�!?m P.O- Cash Construction raUn k;0nSUWt10n LLU CONTRACT: Southwest Downtown - San Saba Street and West Liberty Avenue Cris Martinka Jimmy Patin 3M W. 2nd Street 18607 Heatherwide Blvd. Taylor, TX 76574 Pflugerville, TX 78660 (512) 251-2578 (512)269-1071 jinuny@patlncon.com cris@ccctex.com Statement of Safety? Y Addendum(s) Y Bid Bond? y Statement of Safety? Y Addendum(s) Y Bid Bond? Y 11 I ppM., F=W—iiioc -01111144 NN ;1R1 11110 ii 111 i 11ifll illii fl 10 —1;m 11 UNIT UNIT ITEM 4 ITEM DESCRIPTION UNIT QTY. PRICE COST PRICE COST Round Rock Duct an 52 Manhole, 115 complete in place. EA 5 $4o000.0.0 $20,000.00 $3,800.00 $19,000.00 116 Round Rock - Pedestal, complete in place. EA 28 $0-00 $0.00 '$().00 $0.00 Oncor 12' x1 2'Octaganol Manhole, complete 117 in place. EA 4 $33,000.00 $132,000.00 $28,9,00.00 $115,600.00 P -recast ZFn-c-reTe Switch Gear Pad, complete 118 in place. EA 1 $7,000.00 $7,000.00 $6,500.00 $6,300.00 P-re-c-a-sfUo—ncrete Transformer Pad, complete 119 in place. EA 3 $3,000.00 $9,000-00 $2,800.00 $8,400.00 Coordination with Oncor Electric, including coordination of installation of Wring, complete 120 in place. LS 1 $8,000.00 $8,000.00 $7,350.00 $7,350.00 Coordination of Gas Systems lnstaTa-t16-ns`VtF 121 ATMOS, complete in place. LS 1 $22,000.00 $22,000.00 $19,00040 $19,000.00 7-im-e-W-a-m-e--=ale - Pedestal, complete In 122 place. EA 11 $700.00 $7,700.00 $600.00 $6,600.00 Time Warner Cable - Manhole, complete in 123 place. EA 5 $4,300.00 $21,500.00 $3,750t00 $18,750.00 Coordination with Time Warner Cable including coordination of installation of wiring, 124 complete in place. LS 1 $6,300.00 $6,300.00 $5,420.00 $5,420.00 Time Warner TelecommuRi—cations - Pedestal, 125 complete in place. EA 11 $700.00 $7,700.00 $6W,QO $6,600.00 Time Warner T05Eommunllcations - Manhole, 126 complete in place. EA5 $4,300.00 $21,500.00 $3,75040 $18,750.00 Coordination with Time Warner Telecommunications, including coordination of 127 installation of Wring, complete in place. LS 1 1 $6,300.00 $6,300.00 $5,420,00 $5,420.00 128 AT&T - Pedestal, complete in place. EA 28 8 $500.00 $14,000.00 $W;00, $11,200.00 129 AT&T - Manhole, complete in place. EA 5] $4,300.00 $21,500.00 $3,750:Q0 $18,750.00 Coordination with AT&T, including coordination of installation of wiring, complete 130 in place. LS 1 $6,000.00 $6,000.001 $5,110.001 $5,110-00 ---f— TOTAL T— F BASE BID $4,18 2,743.00 I T,511.00 $3,47 STATEMENT OF SEPARATE CHARGES: Materials: All Other Charges: TOTAL Page 10 of 10 $2,844,266.00 $1,338,477.00 $4,182,743.00 $2,137,565.50 $1,332,945.50 $3,470,511.001