R-13-01-24-K3 - 1/24/2013RESOLUTION NO. R -13-01-24-K3
WHEREAS, the City of Round Rock has duly advertised for bids for the Southwest
Downtown Infrastructure Improvements — San Saba Street and West Liberty Avenue Project, and
WHEREAS, Patin Construction, LLC has submitted the lowest responsible bid, and
WHEREAS, the City Council wishes to accept the bid of Patin Construction, LLC, Now
Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City a contract
with Patin Construction, LLC for the Southwest Downtown Infrastructure Improvements — San Saba
Street and West Liberty Avenue Project.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 24th day of January, 2013.
ATTEST:
SARA L. WHITE, City Clerk
O:\wdox\S CC Ints\0112\ 1304\MUNICIPAL\00265873. DOC/rmc
City of Round Rock, Texas
Kris yr kk t-Fte u) N114YbrTr-o JM
ROUND ROCK, TEXAS City Council Agenda Summary Sheet
PURPOSE PASSION. PROSPERITY.
Item No. K3.
Consider a resolution authorizing the Mayor to execute a contract with Patin Construction
LLC for the Southwest Downtown Infrastructure Improvements — San Saba Street and
Agenda Caption: West Liberty Avenue Project.
Meeting Date:
Department:
January 24. 2013
Transportation
Staff Person making presentation: Gary Hudder
Transportation Director
Item Summary:
The scope of work for Southwest Downtown Infrastructure Improvements (San Saba Street and Liberty Street) from
San Saba Street to Round Rock Avenue and San Saba Street from Main Street to Round Rock Avenue includes all
items necessary for the successful construction of infrastructure and surface improvements for West Liberty Avenue
and San Saba Street, consistent with the work previously completed in southwest downtown.
The bid opening was held on December 5, 2012 at 2:00 p.m. Two sealed bids were received. Patin Construction, LLC
submitted a bid in the amount of $3,470,511. Cash Construction Company, Inc. submitted a bid in the amount of
$4,182,743. The apparent low bid of $3,470,511 was submitted by Patin Construction, LLC.
After reviewing and certifying the attached bid tabulation, Page Southerland Page and the Transportation
Department staff recommend that Patin Construction Company, LLC, with a base bid of $3,470,511 be awarded the
contract for the construction of this project. The Engineering estimate for this project was $4,200,000.
Cost:
Source of Funds:
$3,470,511
Type B Corporation
Recommended Action: Approval
James c Alvis, PE
Vice President
ARCHITECTURE INTERIORS CONSULTING ENGINEERING
December 06, 2012
Mr. Gary Hudder, Transportation Director
City of Round Rock
Transportation Department
2008 Enterprise Dr.
Round Rock, TX 78664
Attn: Todd Keltgen, Operations Manager, Transportation Services, City of Round Rock
RE: SWDT Infrastructure Improvements Project - San Saba and West Liberty Streets
Dear Mr. Hudder
Bids were opened at 2:00 on December 5, 2012, for the Southwest Downtown Infrastructure
Improvements Project- San Saba and West Liberty Streets. PSP has reviewed the documents and
tabulated the bids. The bid tabulation is attached and will be forwarded electronically. The Bid
documentation appears to be in order.
.,
was the, appamnt IwArb-i-dide-r- We Focco-M—mend that the prqjerat be,
awarded to Patin on this basis. Please call me at 512-382-3404 if you have any questions.
Sincerely,
James C Alvis, PE
Vice President, Director of Civil Engineering
Xc: File 109034.01
AUSTIN I PAGE SOUTHERLAND PAGE, LLP
DALLAS 400 West Cesar Chavez Street tel: 512 472 6721
HOUSTON Suite 500 fax: 512 477 3211
i
WASHINGTON DC Austin, Texas 78701 www.pspaec.com
BID TABULATION
THE CITY OF ROUND ROCK
Infrastructure Development and Construction Management
2008 Enterprise Dr. BY: ERM, PSP
Round Rock, Texas. 78664 DATE: 12/6/2012
(512) 218-5555
SHEET: I of
1 RI.N.
III
Cash Construction
Jraun Ldt;
CIINN ONTRACT: Southwest Downtown - San Saba Street and
West Liberty Avenue
Cris Mardnka
Jimmy Patin
3800 W. 2nd Street
18607 Heatherwide Blvd.
Pflugerville, TX 78660
Taylor, TX 76574
(512) 251-2578
(512) 269-1071
jimmy@padncon.com
cris@ccctex.com
Statement of Safety? Y
Addendum(s) Y
Bid Bond? y
Statement of Safety? Y
Addendum(s) Y
Bid Bond? Y
111,11!" 11"M 11
1;�:�:!,,;ilih"!,,.-,.;j�j.,;!��7fi�
11111i'�4!1i!H$1110
51110110i,1I
1 M1
IN
IJI'm
UNIT
ITEM A
ITEM DESCRIPTION
UNIT
QTY.
PRICE
COST
PRICE
COST
Demolition
Street Excavation, Excavation, complete in
place and Properly Dispose Offsite (by Method
I
B - Plan Quantity).
CY
8,962
$20.00
$179,240.00
$20-00
$179,240.00
Hemove F.L;. L;oncrete L;urb and Gutter and
Properly Dispose Offsite, complete in place per
2
lineal foot,
LF
485
$6.00
$2,910.00
P.00
$1,455.00
Remove P.C. Concrete Sidewalk, Driveway,
and other Miscelleaneous Concrete
Appurtenances and Properly Dispose Offsite,
3
complete in place per square foot
SF
8,609
$2.00
$17,218.00
$3.00
$25,827.00
Remove Trees and Properly Dispose site,
4
complete in place per each
EA
39
$300.00
$11,700.00
$250-00
$9,750.00
Remove, Wrap, and Manifest Asbestos
Containing Pipe (Sheet C2.01), complete in
5
place.
LF
25
$80.00
$2,000.00
$100.00
$2,500.00
Environmental
Tree Protective Fencing Type A Chain Link
fence, Temporary Tree Protection Fencing, ,
complete in place, maintained thoughout the
6
project, per lineal foot.
LF
2,159
$3.00
$6,477.00
$3.00
$6,477.00
Tree Protective Fencing Type B Wood Fence -
Tree Protection - Tree Bark Protection
Planking, complete in place, maintained
7
thoughout the project, per lineal foot.
LF
141
$6.50
$916.50
$5.00
$705.00
Rock Berm Protection for areas of
Concentrated Runoff, complete in place,
8
maintained thoughout the project.
LF
20
$20.00
$400.00
$33-00
$660.00
Filter Inlet Protection (includes area inlets,
curb inlets, and trench drains), complete in
9
place, maintained thoughout the project.
EA
21
$80.00
$1,680.00
$75,600
$1,575.00
Slit Fence and/or Triangular Filter Dike,
complete in place, maintained thoughout the
10
project-
LF
870
$2.50
$2,175.00
$2.00
$1,740.00
Stabilized Construction Entrance, complete in
11
place, maintained thoughout project.
EA
1
$2,000.0.0
$2,000.00
$1,000,00
$1,000.00
Contech StormFilter" per plans, complete in
place, maintained thoughout the project and
unit cleaned and filter contents replaced at
12
completion of project. f
EA
1
$100,000.00
$100,000.00
$100,000.00
$100,000.00
Page 1 of 10
BID TABULATION
THE CITY OF ROUND ROCK
Infrastructure Development and Construction Management
2008 Enterprise Dr. BY: ERM, PSP
Round Rock, Texas. 78664 DATE: 1216/2012
(512) 218-5555
SHEET: 1 of
............
Cash Construction
Patin Uonsuuctlon LLC
CONTRACT: Southwest Downtown - San Saba Street and
West Liberty Avenue
Cris Martinka
Jhnmy Patin
380 W. 2nd Street
18607 Heatherwide Blvd.
Taylor, TX 76574
Pflugerville, TX 78660
(512) 251-2578
(512) 269-1071
ommy@patincon-com
ctis@ccctex.com
Statement of Safety? Y
Addendum(s) Y
Bid Bond? Y
Statement of Safety? Y
Addendum(s) Y
Bid Bond? Y
UNIT
UNIT
ITEM I
ITEM DESCRIPTION
UNIT
QTY.
PRICE
COST
PRICE
COST
Contractor management of activities
associated with and Contractors full
compliance with Texas Commission on
Environmental Quality Regulations and
Programs specifically including, but not limited
to, Storm Water Pollution Prevention Plan,
Water Pollution Abatement Plan and Sewage
Collection System Plan requirements. (These
project documents are hereby made part of the
Contract). Contractor documentation of
compliance is also inclued as a deliverable for
13
this task
LS
1
$5,000.00
$5,000.00
$2,500,00
$2,500.00
Miscelleaneous
Total Mobilization Payment (distributed per
14
Spec Section 700)
LS
1
$120,000.50
$120,000.50
$130,W0.00
$130,000.00
Remove Existing Fountain and Components
and Re -install, including electrical service, on
property Owners property, complete in place
15
per lump sum.
LS
1
$2,500.00
$2,500.00
$2,500.00
$2,500.00
Remove Existing Chain Link Fence and Re -
Install including man gates and driveway gate
on property Owners property, complete in
16
place per linear foot.
LF
250
$60.00
$15,000.00
$20.00
$5,000.00
Remove Existing Grease Trap in ROW at
Golden Chick at NE end of West Liberty
Avenue, and dispose of all materials including
contents property, and coordinate reinstallation
of new on same day, complete in place per
lump sum, Install New Grease Trap on Owner
Property at Golden Chick at NE end of West
Liberty Avenue same day as demo, coordinate
with Owner to minimize Owner disruption,
17
complete in place per lump sum,
LS
1
$6,000.00_
$6,000.00
$5,000.00
$5,000.00
Install New Dumpster Pad (Concrete Pad
Only) on Owner Property at Golden Chick at
NE end of West Liberty Avenue, complete in
18
place per lump sum,
LS
1
$1,500.00
$1,500.00
$2,500.00
$2,500.00
Page 2 of 10
BID TABULATION
THE CITY OF ROUND R0CK
Infrastructure Development and Construction Management
2008 Enterprise Dr. BY: ERM, PSP
Round Rock, Texas. 78664 DATE: 12/6/2012
(512) 218-5555
SHEET: 1 of
Cash Construction
raun Construcillon
CONTRACT: Southwest Downtown - San Saba Street and
West Liberty Avenue
Cris Martinka
18607 Heatherwide Blvd.
Jimmy Patin
3800 W. 2nd Street
Pflugerville, TX 78660
Taylor, TX 76574
(512)251-2578
(512)269-1071
cris@ccctex.com
jinnny@patincon.com
Statement of Safety? Y
Addendum(s) Y
Bid Bond? y
Statement of Safety? Y
Addendum(s) Y
Bid Bond? Y
OWN;
il i'21iffliii!
N I 11E
1
" .; I I
17,
UNIT
UNIT
ITEM A
ITEM DESCRIPTION
UNIT
QTY.
PRICE
COST
PRICE
COST
Remove and Relocate Menu Board, including
foundation to match existing, electrical and
lighting From ROW at Golden Chick at NE end
of West Liberty Avenue to Owner Property,
coordinate with -Owner to minimize Owner
19
disruption, complete in place per lump sum,
LS
1
$5,000.00
$5,000.00
$5,000.00
$5,000.00
1 rencri safety an and Trench Safety (all
20
depths), complete in place.
LF
7,855
$1.00
$7,855.00
$0.50
$3,927.50
New 6' tall Chain Link Fencing, man gate(s),
and driveway gate(s), as needed, installed
21
complete in place per lump sum,
LS
100
$40.00
$4,000.00
$301,00
$3,000.00
Install Type A Survey Marker(s) with
Adjustable Valve Box, complete in place per
each, location to be as directed by City Project
22
Manager.
EA
1
$300.00
$300.00
$1,5010.00
$1,500.00
New Dumpster Pad Structure; including but not
limited to: Sawcut, Remove Pavement, Base
and Fill under footprint of New Double
Dumpster Pad at West end of West Main
Street, and dispose property, Install New
Double Dumpster Pad, Walls. Bollards, Gates
and Warning Signs, etc., per plans, complete
23
in place per lump sum,
LS
1
$10,000.00
$10,000.00
$5,000.00
$5,000.00
Pavement, Flat Work
Subgrade Preparation - 6* Scarified Moisture
Conditoned then Recompacted Subgrade
Materials (CH Subgrade Area), complete in
24
place per square yard.
SY
13,355
$3.00
$40,065.00
$5.00
$66,775.00
Asphalt Stabilized Base: Hot Mix Asphaltic
Concrete Base 10.5" Thick TxDOT Item 340,
Type B (Black Base), complete in place per
25
square yard (Measurement Method B).
SY
8,447
$55.00
$464,585.00
$47.00
$397,009-00
Asphalt Stabilized Base: Hot Mix Asphaltic
Concrete Base 8" Thick TxDOT Item 340,
Type B (Black Base), complete in place per
square yard (Measurement Method B) (under,
and 1.5 feet behind, roadway curbs and under
26
concrete pavement at hammerhead).
SY
1,443
$42.00
$60,606.00
$37.00
$53,391.00
Hot Mix Asphaltic Concrete Pavement Surface
Course, 2 inches, Type D, complete in place
27
per square yard, (Measurement Method B).
SY
6,572
$13.00
$85,436.00
$13.00
$85,436.00
Page 3 of 10
BID TABULATION
THE CITY OF ROUND ROCK
Infrastructure Development and Construction Management
2008 Enterprise Dr. BY: ERM, PSP
Round Rock, Texas. 78664 DATE: 12/6/2012
(512) 218-5555
SHEET: 1 of
CONTRACT: Southwest Downtown - San Saba Street and
Cash Construction
ratin ons on LLU
West Liberty Avenue
Cris Martinka
Jimmy Patin
3800 W. 2nd Street
18607 Heatherwide Blvd.
Taylor, TX 76574
Pflugerville, TX 78660
(512) 251-2578
(512) 269-1071
jinuny@patincon.com
cris@ccctex.com
Statement of Safety? Y
Addendum(s) Y
Bid Bond? y
Statement of Safety? Y
Addendum(s) Y
Bid Bond? Y
MY
;;ill INN,!
5-Prii'N 1HIMM
21
110! 1
NE
UNrr
UNIT
ITEM I
ITEM DESCRIPTION
UNIT
QTY.
PRICE
COST
PRICE
COST
Construct Portland Cement Reinforced
Concrete Pavement with integral monolithic
curb (-250 If), Pavement 8 -Inch minimum
Thickness, complete in-place per square foot
28
(hammerhead).
SF
3,464
$8.00
$27,712.00
$6.00
$20,784.00
Construct Portland Cement Reinforced
Concrete Sidewalks to 4- Inch Thickness,
complete in-place per square foot ( as needed
to match ROW back to walk on site at each
29
address);
SF
300
$6.00
$1,800.00
$6.00
$1,800.00
Sidewalk Concrete Paver Units, Sidewalk
Paver Section: Sidewalk Concrete Paving Unit
(2-3/8" thick) with 1" Sand, 6" min. 2 sack
Cement Stabilized Crushed Limestone Flexible
Base, and 6" Re -Compacted Moisture
Conditioned Subgrade, complete in place per
30
square foot,
SF
30,464
$6.50
$198,016.00
$5.50
$167,552.00
Sidewalk Curb Ramp Concrete Paving Unit
with 1" Sand, 6" Cement Stabilized Crushed
Limestone Flexible Base, and 6" Re -
Compacted Moisture Conditioned Subgrade,
including contrasting detectable warning unit
31
pavers, complete in place per each,
SF
933
$8.00
$7,464.00
$6.00
$5,598.00
Portland Cement Reinforced Concrete
32
Driveway, complete in place per square foot.
SF
7,525
$7.00
$52,675.00
$6.00
$45,150.00
P_or_tra_n37e_ment Reinforced Concr-e-te-MUffi-r
33
Gutter, complete in place per lineal foot.
LF
3,408
$20.00
$68,160.00
$20,00
$68,160.00
P_ort ra_nU_Ce_ment Reinforced Concr-e—te Vaffe—y
34
Gutter, complete in place per lineal foot.
LF
1,148
$32.00
$36,736.00
$42.00
$48,216.00
Portland Cement Reinforced Concrete
Retainer Curb Type "A", complete in place per
35
lineal foot (includes tree wells).
LIF
3,125
$14.00
$43,750.00
$25o00
$78,125.00
Mortared Rock Limestone Block (8" x 8" x up
to 24") Wall, with mortared joints, up to 3- feet
tall, including foundation, complete in place per
36
square foot.
SF
200
$20100
$4,000.00
$40.00
$8,000-00
Portland Cement Reinforced Concrete
Handicap Ramp to Structure (each 5' wide and
20' long with 5'x 5' landings at each end),
37
complete in place per lineal foot (if needed).
LF
20
$150.00
$3,000.00
$60.00,
$1,200.0
I
1 Signage Striping
Page 4 of 10
BID TABULATION
THE CITY OF ROUND ROCK
Infrastructure Development and Construction Management
2008 Enterprise Dr. BY: ERM, PSP
Round Rock, Texas. 78664 DATE: 12/6/2012
(512) 218-5555
SHEET: I of
R-77=77—
_sR
g
Cash Construction
Irann k;onstrucuon LLIL;
CONTRACT: Southwest Downtown - San Saba Street and
West Liberty Avenue
Cris Marfinka
18607 Heatherwide Blvd.
Jimmy Patin
3800 W. 2nd Street
Taylor, TX 76574
Pflugerville, TX 78660
(512) 251-2578
(512) 2694071
jimmy@padneon.com
cris@ccctex.cwn
Statement of Safety? Y
Addendum(s) Y
Bid Bond? y
Statement of Safety? Y
Addendum(s) Y
Bid Bond? Y
M 111:I:IxI M? 1 fil 11 7T, II517itlY
UNIT
UNIT
ITEM i
ITEM DESCRIPTION
UNIT
QTY.
PRICE
COST
PRICE
COST
Contractor Traffic Control Plan including
Barricades, Signs, Traffic handling, throughout
38
the project, complete in place per month.
LS
1
$20,000.00
$20,000.00
$10,000.00
$10,000.00
Traffic Signs (24" Stop), including "ALL WAY"
or "4 WAY", and STREET NAMES SIGNS,
including installation per "Stop Sign/Street
Name Assembly Detail", complete in place per
39
each sign.
EA
18
$500.00
$9,000.00
$225.00
$4,050.00
Accessible Parking Signs and Fire Zone Signs
including installation per "Typical Sign
Mounting Detail", complete in place per each
40
sign.
EA
8
$500.00
$4,000.00
$175.00
$1,400.00
Reflectorized Type I Thermoplastic Pavement
Markings; 4 inches in width, 100 mils in
41
thickness per lineal foot
LF
1,963
$1.00
$1,963.00
$1.50
$2,944.50
Reflectorized Type I Thermoplastic Pavement
Markings; 8 inches in width, 100 mils in
42
thickness yellow in color per lineal foot
LF
1,348
$2.50
$3,370.00
$2.25
$3,033.00
Reflectorized Type I Thermoplastic Pavement
Markings; 24 inches in width, 100 mils in
43
white in color per lineal foot
LF
87
$8.00
$696.00
$12.00
$1,044.00
-thickness
Street Lights
44
Street Light Including Foundation, per plans,
complete in place.
EA
27
$6,000.00
$162,000.00
$5,350.00
$144,450.00
45
T79r5—ia70M;T6 PVC Street Light Conduit,
complete in place.
LF
1,350
$6.00
$8,100.00
$5.20
$7,020.00
46
I" Dia. SCH40 PVC Street Light Conduit,
complete in place.
LF
2,450
$6.00
$14,700.00
$5.50
$13,475.00
47
4* Dia. SCH40 PVC Street Light C-o-nTu—it,
complete in place.
LF
2,900
$10.00
$29,000.00
$9.00
$26,100-00
120V, 20A GFI Receptacle With Single Gang
48
Back Box 2-3/4" and Single Gang Vertical In -
Use Cover, complete in place per each,
EA
27
$500.00
$13,500.00
$375..100
$10,125.00
49
Electric Pull Box, H20 load capable, color to
match pavers, complete in place.
EA
18
$700.00
$12,600.00
$630,00
$11,340.00
Complete Street Electric Wiring, Furnishing
50
and Installation, as shown on the plans and
specifications, complete in place.
LS
1
$30,000.00
$30,000-00
$28,500.00
$28,500-00
Page 5of10
BID TABULATION
THE CITY OF ROUND ROCK
Infrastructure Development and Construction Management
2008 Enterprise Dr. BY: ERM, PSP
Round Rock, Texas. 78664 DATE: 12/6/2012
(512) 218-5555
SHEET: 1 of
0 'R 01,0106,
Cash Construction
ralun UonStraCUon
CONTRACT: Southwest Downtown - San Saba Street and
West Liberty Avenue
Cris Martinka
18607 Heatherwide Blvd.
Jimmy Patin
3800 W. 2nd Street
Pflugervitle, TX 78660
Taylor, TX 76574
(512) 251-2578
(512) 269-1071
jimmy@patincon.com
cris@ccctex.com
Statement of Safety? Y
Addendum(s) Y
Bid Bond? y
Statement of Safety? Y
Addendum(s) Y
Bid Bond? Y
OR 211IA
UNIT
UNIT
ITEM i
ITEM DESCRIPTION
UNIT
QTY.
PRICE
COST
PRICE
COST
Trees, Landscape, &
Irrigation
?,�Fasso�Ing, complete in place per square
51
yard,
SY
15
$5.00
$275.00
$6.00
$330.00
Hydromulch restoration including temporary
irrigation of Contractor temporary storage,
temp. office and laydown area, complete in
52
place per square yard,
SY
1,500
$0.80
$1,200.00
$0,50
$750.00
4" Sch. 40 PVC Irrigation sleeve, including all
53
fittings and appurtenances, complete in place.
LF
1,864
$9.00
$16,776.00
$5.00
$9,320.00
Sch 40 PVC Irrigation Line including all fittings
54
and appurtenances, complete in place.
LF
1,230
$4.00
$4,920.00
$1.20
$1,476.00
T-f/TrW-ate-r 9-eter, including cast Iron `va!v—e
55
box, complete in place.
EA
1
$800.00
$800.00
$1,500.00
$1,500.00
T-7727TFac-Rfro-w-Preventer, Inc ludIng "Eca-57i—ron
56
valve box, complete in place.
EA
1
$400.00
$400.00
$680M
$680.00
1 -1/2 -Gate Valve, including cast iron valve
57
box, complete in place.
EA
1
$600.00
$600.00
$100-00
$100.00
Irrigation Valves with Battery Operated
Solenoid, including cast iron valve box,
1
58
complete in place.
EA
2
$170.00
$340.00
$280.00
$560.00
Tree Bubblers, including 4' of flex pipe, fittings
59
and appurtenances, complete in place.
EA
26
$2100
$572.00
$26.00
$676.00
Installation of Street Tree including excavation
(6'x 6'x 30"), planting mix, tree installation
(trees to be provided by City of Round Rock),
and mulch installation (mulch provided by City
60
of Round Rock) complete in place per each,
EA
13
$6,000.00
$78,000.00
$270.00
$3,510.00
Installation of Tree Well w/ Tree Grate and wl
Mulch including excavations, concrete retainer
curbs, weather-proof grounded electrical
receptacle, grate retainer, and tree grate,
installation of mulch (mulch provided by City of
61 1
Round Rock), complete in place per each,
EA
13
$7,000.001
$91,000.00
1 $4,600.00
1 $59,800.00]
Page 6 of 10
BID TABULATION
THE CITY OF ROUND ROCK
Infrastructure Development and Construction Management
2008 Enterprise Dr. BY: ERM, PSP
Round Rock, Texas. 78664 DATE: 12/6/2012
(512) 218-5555
SHEET: 1 of
00! N!"! 10 !1! 0 N NI 001 $!IN, 90MIN 0 111! iiii!VII ��P, w N!"Kii! 10 lip 10p. li�i i�01111 111
111! !ill !I0 0I Y!� 4 N i. q
Cash Construction
rann Construedon LLU
CONTRACT: Southwest Downtown - San Saba Street and
West Liberty Avenue
Cris Martinka
18607 Heatherwide Blvd.
Jimmy Patin
3800 W. 2nd Street
Pflugerville, TX 78660
Taylor, TX 76574
(512) 251-2578
(512)269.1071
cris@ccctex.com
jimmy@patincon.com
Statement of Safety? Y
Addendum(s) Y
Bid Bond? y
Statement of Safety? Y
Addendum(s) Y
Bid Bond? Y
UNIT
UNI
ITEM 4
ITEM DESCRIPTION
UNIT
QTY.
PRICE
COST
PRICE
COST
Installation of Tree Well For Existing Trees w/
Mulch including excavations, concrete retainer
curbs, weather-proof grounded electrical
receptacle, installation of mulch (mulch
provided by City of Round Rock), complete in
62
place per each,
EA
11
$7,000.00
$77,000.00
$2,500.00
$27,500.00
Waste Water
New WW Manhole, 48" Dia., including ring
adjustments, lid, interior coatings, etc,
63
complete in place.
EA
8
$5,000.00
$40,000.00
$3,500.00
$28,000.00
Ve—w-W-0-ro-p-Panhole, 48" Dia., complete in
64
place per each,
EA
4
$6,000.00
$24,000.00
$4,000.00
$16,000.00
6" PVC ASTM D2241 SDR26 Pipe, complete
65
in place.
LF
368
$73.00
$26,864.00
$70.00
$25,760.00
8" PVC ASTM D2241 S13R26 Pipe, complete
66
in place.
LF
1,362
$120.00
$163,440.00
$80.00
$108,960.00
2241 SDR26 Pipe, complete
67
in place.
LF
167
$160.00
$26,720.00
$90.00
$15,030.00
15" PVC ASTM D3034 SDR26 Pipe, complete
68
in place.
LF
126
$150.00
$18,900.00
$110.001
$13,860.00
can Out Assembly for 6" PVC ASTM D2241
69
SDR26 Pipe, complete In place.
EA
9
$600.00
$5,400.00
$900,00
$8,100.00
can Out Assembly for 8" PVC AST9TFffW
70
SDR26 Pipe, complete in place.
EA
5
$700.00
$3,500.00
$1,000.00
$5,000.00
Reconnect existing wastewater service with
new 4 -inch dia. (min.) transition pipe from
existing services to new stubs. service size
shall match existing where existing is larger
than 4" dia. pipe, complete in place per lineal
71
foot,
LF
600
$92.00
$55,200.00
$00.1010
$36,000.00
Abandon In Place Existing WW Manholes,
72
complete in place per each,
EA
5
$700.00
$3,500.00
$500.00
$2,500-00
Water
12- PIPE (PVC AWWA C-900 Class 200, or DI
AWWA C-100 Min. Class 200), complete in
73
place.
LF
1,445
$102.00
$147,390.00
$50.00
$72,250.00
8- PIPE (PVC AWWA C-900 Class 200, or DI
AWWA C-100 Min. Class 200), complete in
74
place.
LF
622
$80.00
$49,760.00
$40.00
$24,880.00
6- PIPE (DI AWWA C-100 Min. Class 200),
75
complete in place.
LF
1
$70.00 ,
$70.00,
$100.00,
$100.001
Page 7 of 10
BID TABULATION
THE CITY OF ROUND ROCK
Infrastructure Development and Construction Management
2008 Enterprise Dr. BY: ERM, PSP
Round Rock, Texas. 78664 DATE: 12/6/2012
(512) 218-5555
SHEET: 1 of
CONTRACT : Southwest Downtown - San Saba Street and
Cash Construction
Iratin Construction A
West Liberty Avenue
Cris Martinka
18607 Heatherwide Blvd.
Jimmy Patin
3800 W. 2nd Street
Pflugerville, TX 78660
Taylor, TX 76574
(512) 251-2578
(512) 269-1071
cris@ccctex.com
jinnny@padneon.com
Statement of Safety? Y
Addendum(s) Y
Bid Bond? Y
Statement of Safety? Y
Addendum(s) Y
Bid Bond? Y
1N;Nl1'ij M !Offi i�;100* ON
R illw,'l
[idqjw ii;l i i0li ill 11 MOIR
T;; lilt! 11; 1111M
X
�1111491111'10N!21111
Iiii 110 0 H 1: t!
IM
011110i I 4M .•j:i::':y:,: i.'j;
i i � �' I i i � 2 i �' I i 0. 1
Mill!'
1•+-7
j, 1 ".1
UNIT
UNIT
ITEM I
ITEM DESCRIPTION
UNIT
QTY.
PRICE
COST
PRICE
COST
4- PIPE (PVC AWWA C-900 Class 200, or DI
AWWA C-100 Min. Class 200), complete in
76
-place.
LF
678
$75.00
$50,850.00
$35.00
$23,730.00
Domestic Potable Water Service Line,
77
complete in place.
LF
500
$45.00
$22,500.00
$30:00
$15,000.00
Installing or Reconnecting Lateral Water
Service to Existing, or Replaced Pipe (Single 1 -
78
1/2" Water Service Connection)
EA
13
$1,300.00
$16,900.00
$1,500,00
$19,500.00
79
12" Gate Valve, complete in place.
EA
26
$1,400.00
$36,400.00
$2•,950;010
$76,700.00
80
8" Gate Valve, complete in place.
EA
10
$1,300.00
$13,000.00
$1,600.00
$16,000.00
are_Vave, comp Iete in place, not
81
associated with Fire Hydrant Assembly
EA
0
$1.800.00
$0.00
$1'500.00
$0.00
82
4" Gate Vale, complete in place.
EA
13
$1,000.00
$13,000.00
$935,00
$12,155.00
Fire Hydrant Assembly (per detail), includes
leads and 6" Gate Valve, complete in place per
83
each.
EA
4
$4,400.00
$17,600.00
$4,800.00
$19,200.00
Ductile Iron Fittings 4 inch through 12 inch,
84
complete in place per ton,
TON
2
$14,000.00
$28,000.00
$19,500.00
$39,000.00
Jacking or Boring 18" Steel Encasement Pipe,
ASTM A-252, Grade 2 , including grouting,
85
complete in place per lineal foot,
LF
60
$600.00
$36,000.00
$400.00
$24,000.00
TTrSt-e-eTen—casement Pipe, ASTM A-252,
86
Grade 2, complete in place
LF
610
$60.00
$36,600.00
$70.00
$42,700.00
18" Steel Encasement Pipe, ASTM A-252,
87
Grade 2, complete in place
LF
320
$80.00
$25,600.00
$951-00
$30,400.00
Storm Water
88
5' Curb Inlet, complete in place.
EA
5
$4,000.00
$20,000.00
$2,500.00
$12,500.00
89
10' Curb Inlet complete in place.
EA
1
$6,500 00
$6,500.00
$3,'ON-00,
$3,000.00
go
2'x2' Area Inlet, complete in place.
EA
6
$2,200.00
$13,200.00
$1,000.00
$6,000.00
91
3'x3' Area Inlet, complete in place.
EA
3
$3,500.00
$10,500.00
$1:i200.00
$3,600.00
92
4'x4' Area Inlet, complete in place.
EA
1
$3,600.00
$3,600.00
$1,500.00
$1,500.00
Trench Drain (Type A) and Grate 8" x 10'
(EJIW #V-7381), complete in place per
93
each.linear foot.
LF
10
$1,000.00
$10,000.00
$300.00
$3,000.00
Trench Drain (Type A) and Grate 10" x 10'
(EJIW #V-7382), complete in place per
94
each.linear foot.
LF
10
$1,100.00
$11,000.00
$320.00
$3,200.00
Trench Drain (Type B) and Grate 10" x 16'
(EJIW #V-7382), complete in place per
1 1
95
each.linear foot. .
LF
16
$1,000.00
$16,000.00
$330.001
$5,280.00
Page 8 of 10
BID TABULATION
THE CITY OF ROUND ROCK
Infrastructure Development and Construction Management
2008 Enterprise Dr. BY: ERM, PSP
Round Rock, Texas. 78664 DATE: 12/6/2012
(512) 218-5555
SHEET: 1 of
: Southwest Downtown - San Saba Street and
Avenue
TEM 4 ITEM DESCRIPTION
Dia., including x- Excavation ancT--
96 Backfill, complete in place.
la.—,including xcava Ionan97 Backfill, complete in place.
la., Inc u IngExcavation—an-T-
98
xcava Ionan98 Backfill, complete in place.
Dia., including Excavation an
99 Backfill, complete in place.
la., Inc U Ing xcava Ion an
100 Backfill, complete in place.
la., Inc U IngExcavation---a-ncr-
101 Backfill, complete in place.
Dia., including Excavation an
102 Backfill, complete in place.
recast tormwater Manhole, compete Ir
103 place per each,
recast tormwater Manhole, compete Ir
104 place per each,
Precast ormwater Manhole, compete it
105 place per each,
Outfall Headwall with Energy Dissipaters and
106 Rip Rap for 42" Dia. RCP, complete in place.
Duct Bank
Duct Bank ( lectricallommunlcatlons,
107 complete in place.
10 each 4" Schedule 40 PVC conduits in duct
108 bank (Communications), complete in place
T7--D-u-c-t-ffa-nR7Electrlca1
l09 Communications), complete in place.
Duct Bank (Electrical
110 Communications), complete in place.
4- uct an(Electrical &
111 Communications), complete in place.
uct an c ectnca ommurncatio s
112 complete in place.
Duct BanW (Electrical&
113 Communications), complete in place.
1 an or 0Duct Bank (Elec-tric-aT&
114 Communications), complete in place.
L11"11"
LF
LF
LF
LF
LF
LF
LF
EA
EA
EA
96
148
65
636
394
115
30
4
3
1
Cash Construction
Cris Martinka
18607 Heatherwide Blvd.
Pflugerville, TR 78660
(512)251-2578
cris@ccctex.com
Statement of Safety? Y
Addendum(s) Y
Bid Bond? Y
Lil;yljalln.YM;Hnr:ili:.ipripy ti
. i i ..::n ica lih:auutn i:u ,.I:n:
UNTf
PRICE
$80.00
$130.00
$140.00
$200.00
$260.00
$340.00
EA 1 $9
LF 168 9
LF
LF
LF
LF
LF
LF
LF
157
116
878
137
115
72
55
$190.00
$230.00
$2,60.00
$360.00
$310.00
$410.00
Page 9 of 10
Jimmy Patin
38M W. 2nd Street
Taylor, TR 76574
(512)269-1071
jimmy@patincon.com
Statement of Safety? Y
Addendum(s) Y
Bid Bond? Y
''.RMii Ix'. I ujii:;iiip;JA I11110..I1;:�:+iiGwfu?i'U!Id:'lly!i
:�ra::;;lkl�nna::::::�xu�° aL: .y, :.6 is ai•:q;.6,;�
" UNIT
COST
$4,8
COST PRICE
$7,680.00 $50,00.
$17,760.00 $60.00
$8,450.00 $70.00
$89,040.00 $8:00.
$78,800.00 $90,00
$29,900.00 $100.00
$10,200.00 WQ 00
$19,600.00 $4,000.00
$19,500.00 $5,000.00.
$8,000.00 _$15,000:00
$9,000.00 $2,5000
$33,600.00 $190.00
$29,830.00 $170.00
$26,680.00 $220.00
$228,280.00 $230.00
$49,320.00 $350.00
$31,050.00 $25-0.00
$22,320.00 $290.00
$22,550.00 $360.00
$4,550.
$50,880.
$11,500.
$3,600.
$16,000.
$15,000.
$15,000.
$31
$201,940
$47,950
$28,750
$19
BID TABULATION
THE CITY OF ROUND ROCK
Infrastructure Development and Construction Management
2008 Enterprise Dr. BY: ERM, PSP
Round Rock, Texas. 78664 DATE: 1216/2012
(512) 218-5555
SHEET: I of
!, I. : j
M 'IrFii �",! 10! i! I i ilil !�l lU 1411�� 111!! 0 !1!!! qi isK �' I 11ii i!!! !I! ilIII. 11!010! 1-H, 0! 11.0, 1!1! 1111 1!i I ;I 51i ml! 11�liiliqli�loll�.-R'qv
Evil! _'010
I I .4".0
�jq mg.1 !:-'m�!?m P.O-
Cash Construction
raUn k;0nSUWt10n LLU
CONTRACT: Southwest Downtown - San Saba Street and
West Liberty Avenue
Cris Martinka
Jimmy Patin
3M W. 2nd Street
18607 Heatherwide Blvd.
Taylor, TX 76574
Pflugerville, TX 78660
(512) 251-2578
(512)269-1071
jinuny@patlncon.com
cris@ccctex.com
Statement of Safety? Y
Addendum(s) Y
Bid Bond? y
Statement of Safety? Y
Addendum(s) Y
Bid Bond? Y
11 I ppM., F=W—iiioc
-01111144
NN ;1R1 11110
ii 111 i 11ifll
illii fl 10
—1;m
11
UNIT
UNIT
ITEM 4
ITEM DESCRIPTION
UNIT
QTY.
PRICE
COST
PRICE
COST
Round Rock Duct an 52 Manhole,
115
complete in place.
EA
5
$4o000.0.0
$20,000.00
$3,800.00
$19,000.00
116
Round Rock - Pedestal, complete in place.
EA
28
$0-00
$0.00
'$().00
$0.00
Oncor 12' x1 2'Octaganol Manhole, complete
117
in place.
EA
4
$33,000.00
$132,000.00
$28,9,00.00
$115,600.00
P -recast ZFn-c-reTe Switch Gear Pad, complete
118
in place.
EA
1
$7,000.00
$7,000.00
$6,500.00
$6,300.00
P-re-c-a-sfUo—ncrete Transformer Pad, complete
119
in place.
EA
3
$3,000.00
$9,000-00
$2,800.00
$8,400.00
Coordination with Oncor Electric, including
coordination of installation of Wring, complete
120
in place.
LS
1
$8,000.00
$8,000.00
$7,350.00
$7,350.00
Coordination of Gas Systems lnstaTa-t16-ns`VtF
121
ATMOS, complete in place.
LS
1
$22,000.00
$22,000.00
$19,00040
$19,000.00
7-im-e-W-a-m-e--=ale - Pedestal, complete In
122
place.
EA
11
$700.00
$7,700.00
$600.00
$6,600.00
Time Warner Cable - Manhole, complete in
123
place.
EA
5
$4,300.00
$21,500.00
$3,750t00
$18,750.00
Coordination with Time Warner Cable
including coordination of installation of wiring,
124
complete in place.
LS
1
$6,300.00
$6,300.00
$5,420.00
$5,420.00
Time Warner TelecommuRi—cations - Pedestal,
125
complete in place.
EA
11
$700.00
$7,700.00
$6W,QO
$6,600.00
Time Warner T05Eommunllcations - Manhole,
126
complete in place.
EA5
$4,300.00
$21,500.00
$3,75040
$18,750.00
Coordination with Time Warner
Telecommunications, including coordination of
127
installation of Wring, complete in place.
LS
1
1
$6,300.00
$6,300.00
$5,420,00
$5,420.00
128
AT&T - Pedestal, complete in place.
EA
28
8
$500.00
$14,000.00
$W;00,
$11,200.00
129
AT&T - Manhole, complete in place.
EA
5]
$4,300.00
$21,500.00
$3,750:Q0
$18,750.00
Coordination with AT&T, including
coordination of installation of wiring, complete
130
in place.
LS
1
$6,000.00
$6,000.001
$5,110.001
$5,110-00
---f—
TOTAL T—
F
BASE BID
$4,18 2,743.00
I T,511.00
$3,47
STATEMENT OF SEPARATE CHARGES:
Materials:
All Other Charges:
TOTAL
Page 10 of 10
$2,844,266.00
$1,338,477.00
$4,182,743.00
$2,137,565.50
$1,332,945.50
$3,470,511.001