R-13-02-28-I7 - 2/28/2013RESOLUTION NO. R-13-02-28-17 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Chasco Constructors for the Round Rock Sports Complex Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with Chasco Constructors for the Round Rock Sports Complex Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 28th day of February, 2013. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: n SARA L. WHITE, City Clerk O:\wdox\SCCI nts\0112\ 1304\MUNICIP AL\00268730.DOC/rmc 08112 Department: General Services Project Name: Sports Center City Project ID Number Contract Quantity Adjustment/ Change Order Page 1 of 3 EXHIBIT "Aa Date: 2/28/13 Change Order/Quantity Adjustment No. 2 r "aa....... a.v.. rhe original base bid from Chasco Constructors provided a railing system that consisted of Painted Carbon Steel Post and Cap Rail with stainless Steel Cable infill. The Viva System provides Stainless Steel Post and Cap Rail with a glass infill. This Stainless Steel Viva system will )rovide a beautiful railing system and with the glass inserts and a less restrictive view for spectators in bleacher seating. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Contractor: 11 C _✓� Signature �/ Gay Project Manager: Signature Submitted for Approval Larry Madsen, Construction Manage Printed Name, Title, Company Approvals 3. Glace Jr. Chasco C wo cnange $64,451.00 0.00 $188,374.00 0.01 _ $252,825.00 0.02 $14,780,120.00 $252,825.00 3 -Dec -13 3 -Dec -13 Date irs Z-S'l'j Printed Name, Title, Company Date Chad McDowell, Director General Services ��— Printed Name, Mayor/City Manager Alan McGraw, Mayor Signature Printed Name, Title Date Contract Quantity Adjustment/ Change Order rel, o8/iz Project Name: Sports Center Quan. Adj./Change Order No.: r'hanna nrdar data Page 2 of 3 Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount Viva Stainless Steel Rail & Glass Infill 1 System 1 $188,374.00 $188,374.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL 4.00 Change Order PROJECT: (name, address) Round Rock Sports Events Center 2400 CNsho'.m Trail Round Rost, TX TO (CONTRACTOR): (name, address) Chasco Constructors P.O. Box 1057 Round Rock, Texas 78680 The Contract is changed as follows: Distribution to. OWNER X ENGINEER X CONTRACTOR X FIELD X CONSTRUCTION MANAGER X Add and delete the following items as per the attached CHANGE LOG Viva Stainless Steel Rail k Glass Infill System CHANGE ORDER N0: Two(2) DATE: 8 -Feb -13 PROJECT NO: 11154 CONTRACT DATE: 26 -Jan -12 CONTRACT FOR: General Construction $188,374 TOTAL: $188,374 \or valid unnl sigurd by the Ouw, Architect end Contractor. signature of the Contractor indicates his agreement heremtk inducting any 4ustment in the Convaet Sum or Contract Tune The Original Contract Stun was 514,527,295 Net change by previously authorized Change Orders 564,451 The Contract Sum prior to this Change Order was S14,591,746 The Contract Sum will be increased by this Change Order 5188.374 The neje Contract Sum including this Change Order will be S14,780,120 The Date of Substantial Completion as of the date of this Change Order has been affected by Marmon Mok ARCHITECT Address: 700 North St. Mar} s, Ste 1600 San Antonio, TX 78205 By: Shawn Bacon DATE: Chasco Constructors, Ltd., L.L.P. CONTRACTOR Address: P.O. Box 1057 Round Rock, Texas 78680 By: a"—es GI ��I- 1, Glace, (1 DATE: 7—' ?,-19 February 8, 2013 TO: City of Round Rock 212 Commerce Cove Round Rock, TX 78664 ATT: Larry Madsen RE: Round Rock Sports Center — Chasco Job No, 11154 CP -009 — VIVA Circa Glass Handrail System P.O. Box 1057 Round Rock, TX 78680 (512) 244-0600 Fax (512) 244-0489 We hereby submit our Change Proposal for your consideration and approval to execute a change to the contract for the above referenced project. For your review and per your request, we have provided pricing for labor, equipment and material to make revisions per Chasco Letter of February 8, 2013, see attached. Changes per attached Chasco CP No. 009 Pricing Sheet dated February 8, 2013: $188,374.00 If approved, this change will result in a change to the Contract Amount by the sum of $188,374.00. Please Indicate if we are to proceed with this work by February 28, 2013. If approved, this CP will be incorporated into the next Owner Change Order. Respectfully, CHASCO CONSTRUCTORS APPROVED BY: Scott Badgett Vice President — Building Estimating cc: File: 107_02_002 Field Date UJIA111 NSTAUCTOAS Chasco CP No: CP -009 Arch. PR No: NIA Change Proposal Priclnp Sheet Rond Rock Sports Center 11154 Architect Project No: 11037 08 February 2013 Prepared by: Scott Badgett Description: Fumish and install a complete stainless steel rail and glass system by VIVA in lieu of the painted carbon steel post & cap rail with SS cable infill included in the original contract. System to be the VIVA Circa glass infill system. 11TEMCost code DESCRIPTION Ory LABOR s UNIT TOTAL MATERIALS UNIT TOTAL Sales Tax Materials (on:y) SUBCONTRACT UNIT TOTAL TOTAL SUBTOTAL $183,042 Fee 1.250% $2,288 SUBTOTAL 5185,330 Insurance 0.642% $1,191 P&P Bond 1.000% 05-5713 Glass Rails b Viva 1 0.00 SO 0.00 50 235 331.00 $235,331 $235,331 2 05-1000 Deduct original cable rails k31 1 0.00 $0 0.00 SO -54,254.00 $54.254 $54,254 09-9000 Deduct painting original rails 1 0.001 So 0.00 $0 -3,368.00 ($3,366) ($3.3 HEso SUBTOTALS 1 0,001 Sol 0.00 $177,711 1 3177711 Further descriptan: Overhead 3.000% $5,331 Sales Tax Materials (on:y) 0.000% $0 SUBTOTAL $183,042 Fee 1.250% $2,288 SUBTOTAL 5185,330 Insurance 0.642% $1,191 P&P Bond 1.000% $1,853 GRAND TOTAL $188,374 February 08, 2013 Marmon Mok Architecture 700 N. St. Mary's, Suite 1600 San Antonio, TX 78205 Attention: Shawn Bacon, AIA Ref: City of Round Rock Sports Center — VIVA Circa Glass Handrail System Shawn: RO. Box 1057 Round Rock,'Icxas 75680 (512)244-0600 1-855-441-4109 Fax: (512) 2,14-0489 mail chasco.com Chasco Constructors proposes to flu-nish and install a complete stainless steel rail and glass system by VIVA in lieu of the painted carbon steel post & cap rail with SS cable infill included in the original contract for the sum of $188,374.00. System to be the VIVA Circa glass infill system. If you have any question regarding our proposal enclosed herein please let me know. Sincerely, . Chasco Constructors Scott Badgett Vice President — Building Estimating f AiMERIC'AN SOCIETY OF a CcmcRe'rr: c ON rRAc rOxs City of Round Rock ROUND ROCK, TEXAS w�rosr. n�swn rcaarexrtY Agenda Item Summary Agenda Number: 17. Title: Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 2 with Chasco Constructors to upgrade railings to a Viva System Stainless Steel Circa Glass System for the Round Rock Sports Complex Project. Type: Resolution Governing Body: City Council Agenda Date: 2/28/2013 Dept Director: Chad McDowell, General Services Director Cost: $188,374.00 Indexes: General Self -Financed Construction; Venue Tax Project Fund Attachments: Resolution, Exhibit "A", Chasco Viva System Text of Legislative File 13-046 The original base bid from Chasco Constructors provided a railing system that consisted of Painted Carbon Steel Post and Cap Rail with Stainless Steel Cable infill. The Viva System provides Stainless Steel Post and Cap Rail with a glass infill. This Stainless Steel Viva system will provide a beautiful railing system and with the glass inserts and a less restrictive view for spectators in bleacher seating Staff recommends approval City or Round Rock Page 1 Printed on 2/22/2013 n,Si I Ir EXECUIEDORIGINAL DOCUMENTS FOLLO\A/ { } 4.. Contract Quantity Adjustment/ Change Order uxan�mrwu��c rer, 08/12 Department: General Services Project Name: Sports Center City Project ID Number ]ustification Date: 2128/13 Change Order/Quantity Adjustment No. 2 Page 1 of 3 'he original base bid from Chasco Constructors provided a railing system that consisted of Painted Carbon Steel Post and Cap Rail with stainless Steel Cable Infill. The Viva System provides Stainless Steel Post and Cap Rail with a glass Infill. This Stainless Steel Viva system will )rovide a beautiful railing system and with the glass inserts and a less restrictive view for spectators in bleacher seating, SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustments) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Change $0.0061' $0.00 Printed Name, Title, Company $14,527,295.00 $64,451.00 _ 0.00 $188,374.00 0.01 $252,825.00 0.02 $14,780,120.00` $252,825.00 Signature 3 -Dec -13 3 -Dec -13 Submitted for Appr wal Larry Madsen, Construction Manager SignatJe Printed Name, Title, Company Date Approvpl3 Contractor: I ��tYn�^ ' L , Charles 1. Glace Jr. Chasco Constructors Signature Printed Name, Title Signature Printed Name, Title, Company Date City Project �""��! 2 o Manager; Chad McDowell, Director General Services Signature Printed Name, Title Date Mayor/City ��M 2 ZILO) , 13 Manaaer Alan McGraw, Mayor Signature Printed Name, Title Contract Quantity Adjustment/ Change Order ka.�n•nn:�rxac rev, 08112 Project Name: Sports Center Quan. Adj./Change Order No.: Chnnne Order rhata Page 2 of 3 F a Item # Item Description Unit ty. Unit Price Contract Time Adjustment Amount v 7177 ." viva Stainless Steel Rail & Glass Infill 1 System 1 $188,374.00 $188,3 .00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 ,Q Change Distribution to: Order OWNER X ENGINEER x CONTRACTOR X FIELD x CONSTRUCTION MANAGER X PROJECT: (name, address) Round Rode Sports Events Center 2400 Chtstto:m TnA Round Rode, TX TO (CONTRACTOR): (name, address) Chasco Constructors P.O. Box 1057 Round Rock, Texas 78680 The Contract is changed as follows: Add and delete the following items as per the attached CHANGE LOG Viva Stainless Steel Rail & Glass Infill System Not %slid until signed by the Omer, Ard itect and Contractor. Swwture of the Contractor indicates his agreement herexidt. including arty adtu;totent in the Contract Sum or Conuact Time. CHANGE ORDER NO: Two (2) DATE: 8 -Feb -13 PROJECT NO: 11154 CONTRACT DATE: CONTRACT FOR: $188,374 TOTAL: $188,374 The Original Contract Sum was $14,527,295 Net change by previously authorized Change Orders $64,451 The Contract Sum prior to this Change Order vas $14,591,746 The Contract Sum will be increased by this Change Order $188,374 The new Contract Sum including this Change Order will be $14,780,120 The Date of Substantial Completion as of the date of this Change Order has been affected by Marmon Mok ARCHITECT Address: 700 North St. Marys, Ste 1600 San Antonio, TX 78205 By: Shawn Bacon DATE: Chasco Constructors, Ltd., L.L.P. CONTRACTOR Address: P.O. Box 1057 Round Rock, Texas 78680 By: �. Charles J. Ulacc, r. DATE: 2'?ig �� 26 -Jan -12 General Construction 9HASCO HSTAUCTOAS February 8, 2013 TO: City of Round Rock 212 Commerce Cove Round Rock, TX 78664 ATT: Larry Madsen RE: Round Rock Sports Center — Chasco Job No, 11154 CP -009 — VIVA Circa Glass Handrail System P.O. Box 1057 Round Rock, TX 78680 (612) 244.0600 Fax (512) 244.0489 We hereby submit our Change Proposal for your consideration and approval to execute a change to the contract for the above referenced project. For your review and per your request, we have provided pricing for labor, equipment and material to make revisions per Chasco Letter of February 8, 2013, see attached. Changes per attached Chasco CP No. 009 Pricing Sheet dated February 8, 2013: $188,374.00 If approved, this change will result in a change to the Contract Amount by the sum of $188,374.00. Please Indicate if we are to proceed with this work by February 28, 2013. If approved, this CP will be incorporated into the next Owner Change Order. Respectfully, APPROVED BY: Date CHASCO CONSTRUCTORS Scott Badgett Vice President — Building Estimating cc: File: 107—_02 002 Field a 9Tl1MISIlu CTOaS Chasco CP No: CP -009 Arch. PR No: N/A Change Proposal Pricing Sheet Rond Rock Sports Center 11154 Architect Project No: 11037 08 February 2013 Prepared by: Scott Badgett Furnish and install a complete stainless steel rail and glass system by VIVA in lieu of the painted carbon steel post & cap rail with SS cable Infill Included in the original contract. System to be the VIVA Circa glass infill system. 11TEMCost code DESCRIPTION City LABOR UNIT TOTAL MATERIALS UNIT TOTAL Sales Tax Materials (only) SUBCONTRACT UNIT TOTAL TOTAL SUBTOTAL $183,042 Fee 1.250% $2,288 SUBTOTAL $185,330 Insurance 0.642% $1,191 PAP Bond 1.000% 1 05-5713 Glass Rails by Viva 1 0.00 $0 0.00 $0 235 331.00 $235,331 $236,331 2 05-1000 Deduct original cable rails 1 0.00 $0 0.00 $0 -54 254.00 354,254 S54,254 3 09-9000 Deduct painting ori incl rails 1 0.00 $0 0.00 $0 -3.366.00 ($3,M) ($3,3 SUBTOTALS I Sol 0.00 $01 0.00 $177,711 1 $177 711 Further description: Overhead 3.000% $5,331 Sales Tax Materials (only) 0.000% s0 SUBTOTAL $183,042 Fee 1.250% $2,288 SUBTOTAL $185,330 Insurance 0.642% $1,191 PAP Bond 1.000% $1,853 GRAND TOTAL $188,374 §ONSTRUCTORS February 08, 2013 Marmon Mok Architecture 700 N. St. Mary's, Suite 1600 San Antonio, TX 78205 Attention: Shawn Bacon, AIA Ref: City of Round Rock Sports Center — VIVA Circa Glass Handrail System Shawn: PO. Boa 1057 Round Rock, Texas 78680 (512) 244-0600 1-855-441-4109 Fax: (512) 244-0489 mailWhasco.com Chasco Constructors proposes to furnish and install a complete stainless steel rail and glass system by VIVA in lien of the painted carbon steel post & cap rail with SS cable infill included in the original contract for the sum of $188,374.00. System to be the VIVA Circa glass infill system. If you have any question regarding our proposal enclosed herein please let me know. Sincerely, Chasco Constructors :!��( is> Scott Badgett Vice President — Building Estimating IIIE AMERICAN SOCIETY OF �. ce�t'cnNc[tcTr CON'iltAC l'c )RS LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: General Services Project Mgr/Resource: Larry Madsen Council Action: ORDINANCE Project Name: Round Rock Sports Complex ContractorNendor: Chasco Constructors RESOLUTION Agenda Wording Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 2 with Chasco Constructors to upgrade railings to a Viva System Stainless Steel Circa Glass System for the Round Rock Sports Complex Project. City Manager Approval CMA Wording Attorney Approval dttorney Notes/Comments Date 11 1 g,1 13 0:\wdox\SCClnts1019917163\MISC100268395.XLS Updated 6/3/08