R-13-03-28-I9 - 3/28/2013RESOLUTION NO. R -13-03-28-I9 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction for the Chisholm Trail Road Reconstruction / Parkway Extension Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with Cash Construction for the Chisholm Trail Road Reconstruction / Parkway Extension Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 28th day of March, 2013. �,l ALA CGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk O:\wdox\SCClnts\0112\ 1304\MUNICIPAL\00270031.DOC Contract Quantity Adjustment/Change Order ` 1111.�pi RIM:19tiYAl ra,�,z Department: Transportation Project Chisholm Trail Road Page I of 3 EXHIBIT „A„ Name: Reconstruction/Chisholm Pkwy. Extension Dade: _ 2/22/13 City Project Change Carder/Quantity ID Number STI l i.SM Adjustment No. 2 austification More 8' and 6' wet connections were needed than previously thought in Quantity Adjustment/Change order # 1. The rest of the change order Items in Quantity Adjustment/Change Order # 2 were discovered during the construction process. SUMMARY Original Contract Price: Previous Quantity Adjustment(s)- This Quantity Adjustment: Total Quantity Adjustment(,): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To gate: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Dfi'erence between Original and Adjusted Contract Prices: Original Contract Time: Tim Adjustment by previous Quan. Adj./Change Order. Time Adjustment by this Quart. Adj./Change Order: New Contract Time: "repared By: L' ( w Signature -ontractor. ?' C'k Slg ure ;Ity Project Zanager: Signature 4ayor/City 9anag r Signature Submitted for Approval BJ. Printed Name, Title, Company Approvals 8.3. Cash, Cash Construction Printed Name, Title, Company Printed Name, Tide Amount % Change $141,445.00 $0.00 $144,445.00 $7,385,688.00 $52,995.00 1% $79,775,00 1% $132,770.00 2% E$7,518,458.00 $277,215.00 535 Calendar Days 52 Calendar Days 5 Calendar Days 592 Calendar Days Manager, CORR Date Contract Quantity Adjustment/Change Order rev, X4112 Project Name: Chisholm Trail Road Reconstruction/Chisholm Pkwy- Extension Quan. Adj./Change Order No.: CB—...... ^".. Page 2 of 3 Contract Time item # Item Description UnitQty- Unit Price Amount Adjustment pe vs) 6" Wet Connection Sta. 5+35, 7+45, 9+03, 13+75, 71+30, 22+71 (eastside) 3+20, 6+25, & 5+45(westside) EA 9 $3,795.00 $34,155.00 B" Wet Connection Sta.3+25-a-nTT0—+11 (eastside) & Fire line Fix EA 3 $4,385.00 $13,155.00 Cut in 12" x 6" Tee at station 8+44 JChisholm Parkway I - EA 1 $2,400.00 $2,400.00 Cast in Place Type M Storm Manhole 5' i I 6- -EA —4T 1 $-6,285.00,— $6,285.00 Cast in Place Type M Storm ManFoTe x- 41 EA 1 $4,220.00 $4,220.00 Metal BeR Guard Rail LF ----150 $25.00 $3,750.00 Terminal AncRor Section EA 1 610.001 --W-0100 ISIngle Guardrail Termainal -,U— 1 $1,000.001 $1,000.0 10" AC Water Line Fix Sta 18—+85' LS —ff— 1 2 900.00 $2,900.00 B" Water Line Fix Sta 9+75-- 1 $3,890.00 53,890.00-- 1 8" x 8" Tapping Sleeve and Valve Fire Line Fix EA 1 $7,410.00 $7,410.00 -00 0.00 $0.00 $a.05 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/Change order Mv, Project NBMe: Chisholm Trail Road Recorbqrudion/Chisholm Pkwy. E\tenslon Quan. Adj./Change Order No.: I Quantity Adjustment Data Bid Item # Item Description Contract T e Unit QW. Unit Price Amount Adjustment . ......... . Unit Price Amount Adjustment 0.00 0.00 10.001 $O_C.0 $0.G0 0 0 C,0 CO $000 $0.00 $0.00 50.00 $0.00 $0.00 -001- $0.001 $0.001 $O.OD $0.00 $0.00W $0.00 0.0 ......... . $0.00 City of Round Rock ,ROUND ROCK, TEXAS nnrn¢ a�aion raasvegirr Agenda Item Summary Agenda Number: 1.9 Title: Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 2 with Cash Construction for the Chisholm Trail Road Reconstruction/Chisholm Parkway Extension Project. Type: Resolution Governing Body: City Council Agenda Date: 3/28/2013 Dept Director: Gary Hudder, Transportation Director Cost: $79,775.00 Indexes: 2004 General Obligation Bonds; 2007 General Obligation Bonds; RR Transportation and Economic Development Corporation (Type B) Attachments: Resolution, Exhibit "A" . Text of Legislative File 13-094 The City Council approved the bid of Cash Construction for this project on May 24, 2012, at a cost of $7,241,243. The scope of this project is to upgrade Chisholm Trail Road to a five -lane urban roadway with curb and gutter section, install a new water line along Chisholm Trail Road, and extend Chisholm Parkway from its current termini to Chisholm Trail Road. Quantity Adjustment/Change Order No. 1 increased the cost of this construction contract by $197,440. Quantity adjustments for Class C concrete for the retaining wall, trench safety systems, pipe, additional fittings, a fire hydrant, gate -type valves, and reflectorized pavement markers cost $144,445. The change order portion added wet connections and tapping sleeves and valves at a cost of $52,995. Quantity Adjustment/Change Order No. 2 is requesting additional six inch and eight inch wet connections, two additional manholes, and a metal beam guard rail with an anchor section. The cost would be $79,775. The total cost of the construction contract would be $7,518,458. Staff recommends approval. City of Round Rock Page 1 Printed on 312512013 t z i' B C Y S 5 k' E s f L k { 1 Page 1 of 3 Contract Quantity Adjustment/Change order ^ UMD ROCiC�TEJ.4t5 rev, 08/12 Department: Transportation Project Chisholm Trail Road Name: Reconstruction/Chisholm Pkwy. Extension Date: 2/22/13 City Project Change Order/Quantity ID Number ST11CHSM Adjustment No. 2 .justification More 8" and 6" wet connections were needed than previously thought in Quantity Adjustment/Change Order # 1. The rest of the change order items in Quantity Adjustment/Change Order # 2 were discovered during the construction process. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Amount % Change $7,241,243.00 $144,445.00 $0.00 $144,445.00 By:.U-2�N— B.I.Cash, Cash Construction Signature Printed Name, Title, Company Date 0111 Contractor: B.J. Cash, Cash Construction Z ZZ i City Project � Signature Printed Name, Title, Company Dat Manager: Bill Stablein, Project Manager, CORR 2�_A 2--A 113 ignature Printed Name, Title Date Mayor/City Manager � Alan McGraw, Mayor, CORR 2 2'� J 3 Signature Printed Name, Title Date Page 2 of 3 Contract Quantity Adjustment/Change Order rev, 08/12 Project Name: Chisholm Trail Road Reconstruction/Chisholm Pkwy. Extension Quan. Adj./Change Order No. TOTAL&I $9,775.001 a Nlu NYC vlucu Vail Contract Time Item # Item Description Unit Qty. Unit Price Amount Adjustment Da s 6" Wet Connection Sta. 5+35, 7+45, 9+03, 13+75, 71+30, 22+71 (eastside) 3+20, 6+25, & 5+45(westside) EA 9 $3,795.00 $34,155.00 8" Wet Connection Sta.3+25 and 20+11 (eastside) & Fire line Fix EA 3 $4,385.00 $13,155.00 Cut in 12" x 6" Tee at station 8+44 Chisholm Parkway EA 1 $2,400.00 $2,400.00 1 Cast in Place Type M Storm Manhole 5' x 6' Cast in Place Type M Storm Manhole 4' x EA 1 $6,285.00 $6,285.00 1 4' Metal Beam Guard Rail EA LF 1 150 $4,220.00 $25.00 $4,220.00 1 Terminal Anchor Section EA 1 $610.00 $3,750.00 0.00 $61 $610.00 Single Guardrail Termainal EA 1 $1,000.00 $1 10" AC Water Line Fix Sta 18+85 LS 1 $2,900.00 ,00 $2,900.00 1 8" Water Line Fix Sta 9+75 LS 1 $3,890.00 $3,890.00 1 8" x 8" Tapping Sleeve and Valve Fire Line Fix EA 1 $7,410.00 $7,410.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL&I $9,775.001 ROUND ROCK�MTIXAS rev, 08/12 Bid Item # Contract Quantity Adjustment/Change Order Project Name: Chisholm Trail Road Reconstruction/Chisholm Pkwy. Extension Quan. Adj./Change Order No. Item Unit Data Unit Price I Amount Page 3 of 3 Contract Time Adjustment