Loading...
R-13-05-23-I7 - 5/23/2013RESOLUTION NO. R-13-05-23-17 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with J.D. Ramming Paving Company, LLC for the 2012 Street Maintenance Program (Arterial Repairs) Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with J.D. Ramming Paving Company, LLC for the 2012 Street Maintenance Program (Arterial Repairs) Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of May, 2013. �?M/L,-� ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk 0:\wdox\SCC1nts\0112\1304\MMCIPAL\00274471.D0C/ me EXHIBIT Page 1 of Contract Quantity Adjustment/ Change Order iKwnu gcx:r r rev, 08112 Department: Transportation Project 2012 Street Maintenance Project (Arterial Name: Repairs) Date: 4/29/13 City Project Change Order/Quantity ID Number TX05MNT12 Adjustment No. i Justification rhis Change Order/Quantity Adjustment is due to an unforeseen increase in pavement repairs on AW Grimes, Sunrise Rd. and Greenlawn Blvd. rhese issues were a result of a desegregating pavement surface. The Change Order portion of this increase is due to some intersection mprovements required on Sunrise at Double File Trail, thus increasing the turn lane stacking ability for southbound Sunrise traffic and an acceleration lane for southbound Double File Trail traffic. This work was refered to us by our Wlliamson County Comissioner and our Traffic SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment this Quan. Adj./Change Order: Calendar Calendar Calendar Amount % Change 129 0 60 New Contract Time:1 189 $0.00 0.00 $120,000.00 0.07 $120,000.00 0.07 $1,879,591.0 $610,321.00 Prepared By: D'Signature Printed Name, Title, Company V��A-• ate Contractor: S � 1'- 1ZM ^G M' l ?Y�V,-h Pfwd--% ignature Printed Namy, Title, Company J Date I City Project -- l Manager: Signature Printed Name, -ritleV Date Mayor/City Manager Signature Printed Name, Title Date Contract Quantity Adjustment/ Change Order rev, 08/12 Project Name: 2012 Street Maintenance Project (Arterial Repairs) Quan. Adj./Change Order No. Chanqe Order Data Pa.ae 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Davs) 1 Pavement Repair Ton 1,000 $120.00 $120,000.0 10 2 Minor Pavement Repair Ton $150.00 $0.00 3 Manhole Adjustment EA $650.00 $0.00 4 Valve Can Adjustment EA $450.00 $0.00 5 R & R Concrete Curb & Gutter LF $56.00 $0.0 6 R & R Reinforced Concrete Sidewalk SF $15.00 $0.0 7 R & R Reinforced Concrete Driveway SF $24.00 $0.00 8 R & R Reinforced Concrete /Gutter SF $36.00 $0.00 9 Traffic Control MO $7,500.00 $0.00 10 Reflectorized Pavement Markings LF $2.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: 120000.00 10 Page 3 of 3 Contract Quantity Adjustment/ Change Order rev, 08112 Project Name: 2012 Street Maintenance Project (Arterial Repairs) Quan. Adj./Change Order No. Ouantitv Adiustment Data Bid Item # Item Description p Unit Qty. Unit Price Contract Time Adjustment Amountf navel 1 Pavement Repair Ton 3,500 $120.00 $420,000.0 45 2 Minor Pavement Repair 7Manhole Ton $150.00 $0.00 3 Adjustment EA $650.00 $0.00 4 Valve Can Adjustment EA $450.00 $0.00 5 R & R Concrete Curb & Gutter LF 566 $56.00 $31,696.00 2 6 R & R Reinforced Concrete Sidewalk SF 2,575 $15.00 $38,625.00 7 R & R Reinforced Concrete Driveway SF $24.00 $0.003 8 R & R Reinforced Concrete /Gutter SF $36.00 $0.00 9 Traffic Control MO $7,500.00 $0.00 10 Reflectorized Pavement Markings LF $2.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS:J $490,321.001s0 City of Round Rock AROUND ROCK TEXAS vu�vog. neon rxoAsmn Agenda Item Summary Agenda Number: 1.7 Title: Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 1 with J.D. Ramming Paving Company, LLC for the 2012 Street Maintenance Program (Arterial Repairs). Type: Resolution Governing Body: City Council Agenda Date: 5/23/2013 Dept Director: Gary Hudder, Transportation Director Cost: $610,321.00 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: Resolution, Exhibit A Text of Legislative File 13-313 The bid submitted by J.D. Ramming Paving Co., LLC for $1,269,270 for the 2012 Street Maintenance Program (Arterial Repairs) was approved by the City Council on September 27, 2012. The contract provided for pavement and concrete repairs along Sam Bass Road, Sunrise Road, A.W. Grimes Boulevard, Greenlawn Boulevard, Dell Way, Forest Creek Drive, and Donnell Drive. After the contract had been issued, the Transportation Department decided to increase the scope of the project to include modifications to the center median on Sunrise Road north of Old Settlers to improve safety for access to and from Double File Trail. We have continued to have requests from community members and County Commissioners to make these improvements. The value of this scope change is $120,000 to the original contract. In addition, we have also had a significant quantity increase to the project. When we go out for bid on repair projects like this, it is extremely difficult for us to know for certain what the necessary limits for the repairs will be at bid time. Once we get into the field and begin the actual repair work, we make the appropriate adjustments to the project limits to allow for the repairs to be made correctly, for the long term. The quantity adjustments relative to this supplemental request are $490,321. Therefore Quantity Adjustment/Change Order No. 1 is necessary for increased actual pavement repair quantities and the project expansion to include the safety improvements along Sunrise Road at a combined cost of $610,321. Cost. $1,879,591 Source of Funds: Round Rock Transportation and Economic Development Corporation (Type B) Staff recommends approval. City of Round Rock Page 1 Printed on 512112013 � J F i � z L o LLJ X w 4 0 � Page 1 of 3 Contract Quantity Adjustment/ Change Order rlo*— rev, 08/12 Department: Transportation PrO,j�t #� Mbena� Prcaje€� {Artesia iFt1e: i!:4/29/13 City Project Change Order/Quantity ID Number TX05MNT12 Adjustment No. 1 Justification "his Change Order/Quantity Adjustment is due to an unforeseen increase in pavement repairs on AW Grimes, Sunrise Rd. and Greenlawn Blvd. hese issues were a result of a desegregating pavement surface. The Change Order portion of this increase is due to some intersection mprovements required on Sunrise at Double File Trail, thus increasing the turn lane stacking ability for southbound Sunrise traffic and an acceleration lane for southbound Double File Trail traffic. This work was refered to us by our Wlliamson County Comissioner and our Traffic SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Tin? Amount % Change Calendar 129 Calendar 0 Calendar 60 189 $0.00 0.00 $120,000.00 0.07 $120,000.00 0.07 $1,879,591.0 $610,321.00 Prepared By: � —✓ ' J PIQ-nn3646C0n-'e'(50, 5 ture Printed Name, Title, Company Date � � w Contractor: �- '�M� �. �'i �1 3 Signature Printed Na e, Title, Company Date City Project Manager: S' natur Printed Nam itle Date Mayor/Cityj G Manager AA v► � w A �� .1s ignature Printed Name, Title I i Date <- t2 -- Contract Quantity Adjustment/ Change Order IM]UNU ROC14 TE%.l5 rev, 08/12 Project Name: 2012 Street ka ienance f (Atterla1 emirs) Quan. Adj./Change Order No. Chanae Order Data Page 2 of 3 Item # Item Description 1 Unit Qty. Unit Price Amount Contract Time Adjustment (Davs) 1 Pavement Repair Ton 1,000 $120.00 $120,000.00 10 2 Minor Pavement Repair Ton $150.00 $0.00 3 Manhole Adjustment EA $650.00 $0.00 4 Valve Can Adjustment EA $450.00 $0.00 5 R & R Concrete Curb & Gutter LF $56.00 $0.00 6 R & R Reinforced Concrete Sidewalk SF $15.00 $0.00 7 R & R Reinforced Concrete Driveway SF $24.00 $0.00 8 R & R Reinforced Concrete /Gutter SF $36.00 $0.00 9 Traffic Control MO $7,500.00 $0.00 10 Reflectorized Pavement Markings LF $2.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS:J M"00.001 1 Page 3 of 3 Contract Quantity Adjustment/ Change Order rev, 08/12 Project Name: 2012 Street Maintenance ftJect (Afterial ) Quan. Adj./Change Order No. Ouantitv Adiustment Data Bid Item # Item Description p Unit Qty. Unit Price Contract Time Adjustment Amount 1 Pavement Repair Ton 3,500 $120.00 $420,000.00 45 2 Minor Pavement Repair Ton $150.00 $0.00 3 Manhole Adjustment EA $650.00 $0.00 4 Valve Can Adjustment EA $450.00 $0.00 5 R & R Concrete Curb & Gutter LF 566 $56.00 $31,696.00 2 6 R & R Reinforced Concrete Sidewalk SF 2,575 $15.00 $38,625.0 7 R & R Reinforced Concrete Driveway SF $24.00 $0.003 8 R & R Reinforced Concrete /Gutter SF $36.00 $0.00 9 Traffic Control MO $7,500.00 $0.00 10 Reflectorized Pavement Markings LF 1 $2.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TAL $490.321.001 50