Loading...
R-2016-3370 - 4/14/2016RESOLUTION NO. R-2016-3370 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with Page Southerland Page, Inc. for the Southwest Downtown Infrastructure Improvements — Final Phase Project, and WHEREAS, Page Southerland Page, Inc. has submitted Supplemental Contract No. 1 to the Contract to modify the provisions for the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 1 with Page Southerland Page, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 1 to the Contract with Page Southerland Page, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 14th day of April, 2016. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: �,,A q4t' r V - SARA L. WHITE, City Clerk 0112.1604,00354910 EXHIBIT "All 0� STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: PAGE SOUTHERLAND PAGE, INC. ("Engineer") ADDRESS: 400 West Cesar Chavez Street, Suite 500, Austin, TX 78701 PROJECT: Southwest Downtown Infrastructure Improvements — Final Phase This Supplemental Contract No. I to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Page Southerland Page, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 24th day of November, 2015 for the Southwest Downtown Infrastructure Improvements — Final Phase Project in the amount of $284,599.29; and TIIV1'premises consiclerea, tn-e7--Tiy-ffffa7ffe-Engineer agree tnat saia contracl is amended as follows: 11 Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. 11. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $89,012.00 the lump sum amount payable under the Contract for a total of $373,611.29, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev. 12/01/08 0199.1583; 00354228 84275 PAGE SOUTHERLAND PAGE, INC. La Date CITY OF ROUND ROCK La Alan McGraw, Mayor Date Supplemental Contract 0199.1583;00354228 APPROVED AS TO FORM: Stephan L. Sheets, City Attorney Rev. 12/01/08 84275 ADDENDUM TO EXHIBIT B Engineering Services PROJECT: Southwest Downtown Infrastructure Improvements — Phase 513 Scope: 1) Subcontract Surveyor scope is added for property and easement boundaries, exhibits and documentation in support of recordation for the UP Railroad ROW (including a triangle parcel to be purchased by the City) and 5 easements. 2) Page will provide extended coordination efforts for the McNeil roadway alignment to obtain concurrence with Gypsum tract consultants and City for the McNeil Road segment that meets at the Mays St. Bridge. 3) Page will provide expanded Scope beyond the Blair St intersection west to Lake Creek Bridge with a requested lane addition. 4) Page will add subcontracted lighting electrical services for the west extension to Lake Creek Bridge and the east extension to the Mays Street Bridge. 5) Page will add plan and profile for — 115 feet of 12" dia .water line to extend across McNeil Road to the edge of the U.P.R.R. ROW. 6) Page will add design services and plan and profile for — 1000' of storm line in McNeil Road as required to convey additional future impervious cover. 7) Page will attend Utility Coordination meetings and add plan and profile for —670' of duct bank east to Lake Creek Bridge and west near Lee's Body shop from the traffic island at the south end of Blair St. SUPPLEMENT 1- Services Not Included: As listed in the original Agreement. Fee Schedule City of Round Rock \ Southwest t Downtown Infrastructure Improvements(SWDT P1 5 fir St A.v�—W—NEw Ra. \\\\\\\\ \\\\\ \\ l � V SAL ED FEE TOTAL R . 000 S Services S 3,979.47 $ 51M.21 $ 9,948.68: $ .87 $ 10.943.54 E. 010 Conceptual Design Development $ 5,106.00 S 7,659.00 :$ 12,765.00 $ 1,276.50 $ 14,041.50 7_C,020 Preliminary Design/ plans $ 5,106.00 $ 7,659.00 $ 12,765.00 $ 1,276.50 :$ 14,041.50 _.`1.030 FkW DaisgrV ,90%,100%pians $ 26,220.00 $ 39,330.00 $ 65,550.00 $ 6,555.00 $ 72,105.00 FC.040 EleGWcWEngI $ 3,220.00 $ 4,830.00 $ 8,050.00 $ 805.00 $ 8,855.00 =.--.110 Compile Project Manual $ 13,814.70 $ 20,722.05 :$ 34,536.75 $ 3,453.68 $ 37,9W,43 nC 120 Constr.Senr.-Bid and Award: $ 3,201.18 $ 4,801.77 $ 8,002.95 $ 800.30 $ 8,883.25 :130 Constr.Serv.-Constr.Admin.:(58 ) $ 13,182.80 $ 19,774.20 $ 32,957.00 $ 3,295.70 4 36,252.70 C 150 Constr.Serv.-Weekly Meetings:(58 a) $ 13,264,90,. $ 19,897.35 $ 33,162.25 $ 3,316.23 S 36,478.48 _yr-160 Constr.Sena.-Project Final Cl $ 2,560.00 $ 3,840.00 $ 6,400.00'$ 640.00 $ 7,040.00 170 Permitting Services(T'CE4 Close Out Services) $ 1,454.86 $ 2,182.29 $ 3,637.15 $ 383.72 $ 4,000.87 ---200 PROJECT MANAGEMENT( weeks) $ 8,418° '. $ 12,827.00 S 21,045.00 $ 2,104.50 $ 23,149.", , i`.!t 001 Surveyor Services $ 5,796.00 $ 8,694.00 $ 14,490.001$ 1,449.00 $ 15,939.00 A.,t-OttGypsum Tract Coordination $ 2,944.00 $ 4,416.00 S 7,360.00 S 735.00 $ 8,096.00 F 012 Extend Lim to Lake Crk Bridge $ 3,624.00 $ 5,436.00 $ 9,060.00!$ 9W00 $ 9,966.00 PageSoutherland Page Sheet 2 of 5 Southwest Downtown Infrastructure Improvements BLAIR PLUS PHASE City of Round Rock FC 130 Constr. Serv. - Constr. Admi Manhours Rate Pirect Labor Project Engineer 240 $42,79 $ 16,269.60 Engineer 101 $35,10 $ 3,545.161.' Senior Civil Designer 0 $27.40 $ 4,212 ' 00 Civil Designer 0 $26A4 $ 3,836Z Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 $18:99 $ - Sub -total 341 $18.99 $ 13,814.70 FC 1120 Ponstr. Serv, - Wid and Awai Manhours Rate $ Direct Labor 'Project Engineer 42 I i I., i $42.79 1 .1 RR R R91i $ 1,79718 Engineer 40 $35,10 $ 1,404-00 'Senior Civil Designer 0 $27.40 $ - Civil Designer 0 $26.44 $ - ,Junior Civil Designer 0 $25,48 $ - Administrative Assistant 0 $18-99 $ - Sub -total 82 $ 3,201.18 FC 130 Constr. Serv. - Constr. Admi Manhours Rate Pirect Labor Project Engineer 120 $4219 $ 5,134.80 Engineer 120 $3510 $ 4,212 ' 00 �$enior Civil Designer 140 $27,40 $ 3,836Z Civil Designer ,Junior Civil Designer 0 $25A8 $ Administrative Assistant 0 $18.99 $ Sub-t6tal 7�: 380 $ 13,182.80 FC IW�Rqqnstr.;$en�� Manhours Rate Pirect Labor Project Engineer13,264-90 Engineer 0 $35.10 $ - Senior Civil Designer 0 $27 - 40 $ - Civil Designer 6 $26,44 $ - Julnior Civil r- ,. -Assistant 0 $1&99 $ - Sub -total 316- $ 13,264.90 Poutherland Page Sheet 3 of 5 Southwest Downtown Infrastructure Improvements BLAIR PLUS PHA City of Round Rock trigineer 1 # r SeniorDesigner Engineer 10 $46.00 $ 460.00 Engineer / $46.00 I ie�ijbr Civil Designer/ A46inistrative Assistant I I $18.99 n DesignerCivil I $42.00 Junior Civil esigner • II ' ♦ •, .47 Manhours $34.00 Direct Labor R 4 0 ,.. • ...... $46.00 ,,..y, 4�6b.dd- trigineer 1 # r SeniorDesigner 0 t" $27.40 Civil Designer Civil Designer { JuniorDesigner I Juniore' -. A46inistrative Assistant i $18.99 n Sub -total a Engineer# # r SeniorRe.+ 1 $27.40 Civil Designer { $26.44 Juniore' -. 0 $25.48 e Ir Sub -total • ♦ •, .47 Manhours Rate Direct Labor .... N.� Engineer V 126 $46.00 $ 5,796.00 Engr Spec I $46.00 Engineer f $42.00 Engr SpecI $42.00 $: Engineer 1 1 $38.00 Engr Tech 111 I', $34.00 Sub -total 126 $ 5,796.00 Manhours Rate Direct Labor Engineer V 64 I4'. 2,944.00 Engr Spec1 $46.00 Engineer1' $42.00 Engr Spec 1 11 Engineer ! $38.00 • C $34.00 Sub-total64 2,944.00 PageSoutheriand Page Sheet 4 of 5 Southwest Downtown Infrastructure Improvements BLAIR PLUS PHA City of Round Rock Conceptual Design Manhours Rate $ Direct Labor ftw� Engineer V 36 $46.00 $ 1,656.00 Engr Spec V 75 $46.00 $ 3,450.00 Engineer 111 0 $42.00 $ - Engr Spec III 0 $42.00 $ - Engineer 1 0 $38.00 $ - Engr Tech 111 0 $34.00 $ - Sub -total ill $46.00 $ 5,106.00 Preliminary DerAqn/ Manhours Rate Direct Labor Engr Spec V 75 $46.00 $ 3,450.00 Engineer Ill 0 $42.00 $ - Engr Spec III 0 $42.00 $ Engineer 1 0 $38.00 $ Enqr Tech Ill 0 $34.00 $ - S -total Sub -total Ill $ 5,106.00 C. 200, PROJECT MANAGE manh22rs Rate Direct Labor Engineer V 183 $46.00 $ 8,418.00 Engr Spec V 0 $4&00 $ - Engineer Ill 0 $42.00 $ - Engr Spec 1111 0 $42M $ - Engineer 1 0 $38.00 $ - EAnr Tech Ill 0 $34M $ - Sub -total 183 $ 8,418.00 19 Milll�! �41 '16, E Manhours Rate Direct Lab—or Engr Spec V 380 $46.00 $ 17,480.00 Engineer Ill 0 $42.00 $ - Engr Spec III 0 $42.00 $ Engineer 1 0 $38.00 $ Sub -total 570 $ 26,220.00 F.C. 040 Electrical Engineer Manhours Rate Direct Labor Engineer V 70 $46.00 $ 3,220.00 Engr Spec V 0 $46.00 $ - Engineer Ill 0 $42.00 $ - Engr Spec III 0 $42.00 $ - Engineer 1 0 $38.00 $ - Engr Tech Ill 0 $34.00 $ --total 70 $ 3,220.00 Peoutherland Page Sheet 5 of 5 Southwest Downtown Infrastructure Improvements BLAIR PLUS PHASE 0 k anhours Rate Direct Labor Engineer V 6,0 2,346.00 Engr Spec V 0 $46.00 $ - Engineer III 0 $42.00 $ - Engr Spec III 0 $42.00 $ - ngineer 1 0 $38.00 $ - Engr Tech III 0 $34.00 - Sub -total 51 $ 2,346.0 ff.ez ;;. ii .; r. anhours ate Dire Labor Engineer V 24 $46.00 1,104.0 Engr Spec V 0 $46.00 $ - Engineer III 0 $42.00 $ - Engr Spec III 0 $42.00 - Engineer 1 0 $38.00 $ - n r Tech ill 0 $34.00 - Sub -total 24 $ 1,104.00 -�N anhours Rate Direct Labor n ineer V 6.00 $ 3,680.00 Engr Spec V 0 $46.00 $ - Engineer III 130 $42.00 $ 5,460.00 Engr Spec III 0 $42.00 $ - Engineer 1 0 $38.00 - nr Tech III 34.00 - Sub -total 210 $ 9,140.00 N sEngineer anhours Rate Direct Labor V 18 6. 828.00 Engr Spec V 0 $46.00 $ - Enineer III 90 $42.00 $ 3,780.00 Engr Spec 111 0 $42.00 $ - Engineer 1 0 $38.00 $ - nr Tech III 34.00 - Sub -total 108 $ 4,608.00 anhours Rate Labor Engineer V 61 $46.00 .Dired 2,80 .00 Engr Spec V 0 $46.00 $ - Enineer 111 0 $42.00 $ - Engr Spec III 0 $42.00 $ - nineer 1 0 $38.00 $ - Engr Tech III 0 $34.00 $ Sub -total 61 $ 2,806.00