R-2016-3362 - 4/14/2016RESOLUTION NO. R-2016-3362
MEN I I MEN P I I R I I I III I I I I 111�IIII
I 1111111111�1:r qllr
MEMUMNEEM 111 11111411 111
WHEREAS, the Council has determined that it is necessary to make adjustments/changes to
!nfflt4T4ff
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
IIIIIIIIIIIII illiIilillililli IIIIIIIIIIII III
I �13111 11 I I'111�1
Downtown District Infrastructure Improvements Phase 5A Project, a copy of said quantity
11;iirlitl�ii iiii� Iti 11�� I � I � I
The City Council hereby finds and declares that written notice of the date, hour, place and
M�� - I III '1 1111 iiiiiii iiiiiiiiiiiii III , 111 1111111 1 1111111 / I . .
NVINIM=4 "Malwyor-us �*=- �
RESOLVED this 14th day of April, 2016,
ALAN MCGRAW, Mayor
City of Round Rock, Texas
ATTEST:
SARA L. WHITE, City Clerk
W �1 11604 003549 3
1=ww Contract Quantity Adjustment/Change Order
W12
)epartment: 2221portation.....
)roject
Jame: CORR SWDT Ph SA
.1ty Project
.D Number SWDTS
lustification
IrM Olt 0 Irliff7i 10]r -W-4 9 IM;I;r- Wd M1111;11zM—s-7ff; I Nis K414 1UH 0 111 p7s= 1
;UMMARY
)dginal Contract Price:
Irevious Quantity Adjustment(s):
bis Quantity Adjustment:
Quantity Adjustment(s):
Irevious Change Order(s):
-his Change Order:
'otal Change Order(s) To Date:
idjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)
11us Change Order(s)]:
)Ifference between Original and Adjusted Contract Prices:
EXHIBIT Page I of 3
"A"
Change Order/Quantity
Adjustment
& ect), water, & wastewater. Change order items for Demo inlet top & repour,
Amount % Change
$629,321.00
$190,947A0
$1,172,318.40
)dglnal Contract time: 720 Calendar D
Ime Adjustment by previous Quan. Adj./Change Order: 35 Calendar Days
Ime Adjustment by this Quan. AdjJChange Order: 0 Calendar Days
le w Contract Time: 755 Calendar Days
F
M-47-70-Mll
G2=
Printed Name, Tide, Company
Bill Stablein, Project Manager, CORR
-Sign-Jfu—re Printed Name, Title Date
layor/City
so"ItumNa eDabe
Elam
Contract Quantity Adjustment/Change Order
Project Name: CORR SWDT Ph SA
lslma� =�
Chance Order Data
Item #
Item Description
Unit
Qty.
Unit Price
Contract
Time
Adjustment
Amount (Davs)
7, 221,2-7 77777,,L
4
—LLLL
316
Demo New Inlet Top, and Repour Inlet Tops with
Manholes on Mays
EA
7
$10,075.00
$70,525.00
317
Te—moVilization for Gateway Arch (North East Shaft)
EA
1
$2,270.00
$2,270.00
318
Move Gas Line for WW Line C
LS
1
$5,675.00
$5,675.00
319
Gravel for Tavarn Bar
LS
1
$800.00
$906.00
320
TTY 211 Curb Inlet on Main Street
EA
1
$6,850.00
$6,850.00
321
Galvinized Hand Rail at Round Rock Tavern
LS
1
$5,400.00
$5,400.00
322
White Limestone Rock Fagade at Round Rock Tavern
LS
1
$1,890.00
$1,890.00
323
Liberty and Mays —Leak Repair
LS
1
$9,065.65—
$6,065.00
324
Concrete FND for Turndown Mortared Rock Wall
LF
175
$82.00
$14,350.00
325
Double Grate Inlet Apron
LS
1
$2,935.00
$2,935.00
326
Tapping Sleeve at Reids Cleaners
LS
1
$3,960.00
$3,960.00
327
Riprap for Median and 221 Rail at Bagdad and Mays
LS
1
$1,220.00
$1,220.00
328
Cast in P ace 10'Ty IIR Inlet SL F
LS
1
$25,595.00
$25,595.00
329
Plug 12" Well 180' Deep at Jorge's
LS
1
$6,435.00
$9,435.00
330
JAdditional Colored Concrete at Traffic Circle
T7771777=
$5.001
$8,325.00
TOTAI
Contract Quantity Adjustment/Change Order
ev, 82
Project Name: CORR SWDT Ph SA
Quantity Adjustment Data
Bid Item #
Item Description
Unit Qty- Unit Price
Amount
Contract
Time
Adjustment
Days1
261
CURB RAMPS (TY 1TXDOT-531)
EA
30
$1,300.00
$39,000.00
234
New P.C. Concrete Sidewalks, 5 in Thick
SF
1123
$11.00
$12,353.0-0
163
Concrete Valley Gutters
SF
568
$12.00
$6,816.00
260
CONC CURB & GUT -TER (TY II) (TXD
LF
84
$24.00
$2,016.00
162
P.C. Concrete Driveways
SF
943
$13.00
$12,259.00
156
Hof Mix Asphaltic Concrete Pavement, (Typ6-8)-(PG 64-
22) Base (8 in) (Waterline Black Base on Mays)
SY
467
$47.00
$21,949.00
67
Pipe, ASTM D2241 SDR26 WW (all dFpths),
including excavation and backflll
LF
102
$160.00
$16,320.00
70
Clean Out Assem6ly for Pipe, 8" Dia. PVC ASTM D2241
SDR26 WW (all depths), including Excavation and
EA
2
$400.00
$800.00
68
Pipe, -8"-U—ia. PVC ASTM D2241 SDR26 WW (aff-depft)-,
including excavation and backfill
LF
40
$140.00
$5,600.00
11
-9BT
Asp K55i iz-ed Base: Hot Mix Asphaltic Concrete
Base (10.5" Thick), TxD0T Item 340, Type B (Black
Base) (Method A) under, and 1.5 feet behind roadway
SY
554
$63.60
$35,234.40
15
P.C. Reinforced Concrete Valley Gutter
SY
39
$100.00
$3,900.00
24
P.C. Reinforced -Concrete -Steps
LF
1 25
$136.00
$3,400.00
236
Tree Well (8'x8') No Grate
EA
2
$24,000.00
$48,000.00
21
17" R -Winer Curb with M -orb -red Rock men one BlocR
(6"x6"xup to 24") all, with mortared joints up to 3 -
feet tall, Including foundation, (measured square feet of
face of block) complete In place per square foot) ADDIT
WALL @ LIBERTY
SF
226
$83.00
$18,758.00
314
Concrete Coating Base Coat for Conc. Bridge WaT1-
(Traffic Side Only Including Top of Wall)
=SF
5900
$1.00
$5,900.00
51
Thermop1antic Pavement Mar kings-Reflectorized Type 1,
12 inches in width (SLD) (W) cross walks, 100 Mils in
Thickness
LF
69
$8.00
$552.00
52
2ffi—ermoplastic Pavement Markings-ReflectoTrz-e-d —Type I,
4 Inches in width (SLD)(Y), 100 Mils In Thickness
LF
327
$4.00
$1,308.00
53
Thermoplastic Pavement Markings-Reflectorized Type 1,
4 inches in width (SLD)(W), 100 Mils In Thickness
LF
695
$4.00
$2,780.00
59
TFe-rm-o-pTa—stic Pavement Markings-Reflectorized Type 1,
WORD (W), 100 Mils In Thickness
EA
1
$300.00
$300.00
204
WK ZN PAV MRK NON REMOV (W) 24" (SLD)
LF
78
$9.00
$70400
177
8" C-900 SDR 14 PVC Pipe
LF
65
$200.00
$13,000.00
203
Portable Changeable Message Sign
EA
-3
$20,000.00
-$60,000.00
$0.00
$0.00
$0.00
T-
$0.00
TOTAL
$190,94Z,40