Loading...
R-2016-3362 - 4/14/2016RESOLUTION NO. R-2016-3362 MEN I I MEN P I I R I I I III I I I I 111�IIII I 1111111111�1:r qllr MEMUMNEEM 111 11111411 111 WHEREAS, the Council has determined that it is necessary to make adjustments/changes to !nfflt4T4ff BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, IIIIIIIIIIIII illiIilillililli IIIIIIIIIIII III I �13111 11 I I'111�1 Downtown District Infrastructure Improvements Phase 5A Project, a copy of said quantity 11;iirlitl�ii iiii� Iti 11�� I � I � I The City Council hereby finds and declares that written notice of the date, hour, place and M�� - I III '1 1111 iiiiiii iiiiiiiiiiiii III , 111 1111111 1 1111111 / I . . NVINIM=4 "Malwyor-us �*=- � RESOLVED this 14th day of April, 2016, ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk W �1 11604 003549 3 1=ww Contract Quantity Adjustment/Change Order W12 )epartment: 2221portation..... )roject Jame: CORR SWDT Ph SA .1ty Project .D Number SWDTS lustification IrM Olt 0 Irliff7i 10]r -W-4 9 IM;I;r- Wd M1111;11zM—s-7ff; I Nis K414 1UH 0 111 p7s= 1 ;UMMARY )dginal Contract Price: Irevious Quantity Adjustment(s): bis Quantity Adjustment: Quantity Adjustment(s): Irevious Change Order(s): -his Change Order: 'otal Change Order(s) To Date: idjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) 11us Change Order(s)]: )Ifference between Original and Adjusted Contract Prices: EXHIBIT Page I of 3 "A" Change Order/Quantity Adjustment & ect), water, & wastewater. Change order items for Demo inlet top & repour, Amount % Change $629,321.00 $190,947A0 $1,172,318.40 )dglnal Contract time: 720 Calendar D Ime Adjustment by previous Quan. Adj./Change Order: 35 Calendar Days Ime Adjustment by this Quan. AdjJChange Order: 0 Calendar Days le w Contract Time: 755 Calendar Days F M-47-70-Mll G2= Printed Name, Tide, Company Bill Stablein, Project Manager, CORR -Sign-Jfu—re Printed Name, Title Date layor/City so"ItumNa eDabe Elam Contract Quantity Adjustment/Change Order Project Name: CORR SWDT Ph SA lslma� =� Chance Order Data Item # Item Description Unit Qty. Unit Price Contract Time Adjustment Amount (Davs) 7, 221,2-7 77777,,L 4 —LLLL 316 Demo New Inlet Top, and Repour Inlet Tops with Manholes on Mays EA 7 $10,075.00 $70,525.00 317 Te—moVilization for Gateway Arch (North East Shaft) EA 1 $2,270.00 $2,270.00 318 Move Gas Line for WW Line C LS 1 $5,675.00 $5,675.00 319 Gravel for Tavarn Bar LS 1 $800.00 $906.00 320 TTY 211 Curb Inlet on Main Street EA 1 $6,850.00 $6,850.00 321 Galvinized Hand Rail at Round Rock Tavern LS 1 $5,400.00 $5,400.00 322 White Limestone Rock Fagade at Round Rock Tavern LS 1 $1,890.00 $1,890.00 323 Liberty and Mays —Leak Repair LS 1 $9,065.65— $6,065.00 324 Concrete FND for Turndown Mortared Rock Wall LF 175 $82.00 $14,350.00 325 Double Grate Inlet Apron LS 1 $2,935.00 $2,935.00 326 Tapping Sleeve at Reids Cleaners LS 1 $3,960.00 $3,960.00 327 Riprap for Median and 221 Rail at Bagdad and Mays LS 1 $1,220.00 $1,220.00 328 Cast in P ace 10'Ty IIR Inlet SL F LS 1 $25,595.00 $25,595.00 329 Plug 12" Well 180' Deep at Jorge's LS 1 $6,435.00 $9,435.00 330 JAdditional Colored Concrete at Traffic Circle T7771777= $5.001 $8,325.00 TOTAI Contract Quantity Adjustment/Change Order ev, 82 Project Name: CORR SWDT Ph SA Quantity Adjustment Data Bid Item # Item Description Unit Qty- Unit Price Amount Contract Time Adjustment Days1 261 CURB RAMPS (TY 1TXDOT-531) EA 30 $1,300.00 $39,000.00 234 New P.C. Concrete Sidewalks, 5 in Thick SF 1123 $11.00 $12,353.0-0 163 Concrete Valley Gutters SF 568 $12.00 $6,816.00 260 CONC CURB & GUT -TER (TY II) (TXD LF 84 $24.00 $2,016.00 162 P.C. Concrete Driveways SF 943 $13.00 $12,259.00 156 Hof Mix Asphaltic Concrete Pavement, (Typ6-8)-(PG 64- 22) Base (8 in) (Waterline Black Base on Mays) SY 467 $47.00 $21,949.00 67 Pipe, ASTM D2241 SDR26 WW (all dFpths), including excavation and backflll LF 102 $160.00 $16,320.00 70 Clean Out Assem6ly for Pipe, 8" Dia. PVC ASTM D2241 SDR26 WW (all depths), including Excavation and EA 2 $400.00 $800.00 68 Pipe, -8"-U—ia. PVC ASTM D2241 SDR26 WW (aff-d­epft)-, including excavation and backfill LF 40 $140.00 $5,600.00 11 -9BT Asp K55i iz-ed Base: Hot Mix Asphaltic Concrete Base (10.5" Thick), TxD0T Item 340, Type B (Black Base) (Method A) under, and 1.5 feet behind roadway SY 554 $63.60 $35,234.40 15 P.C. Reinforced Concrete Valley Gutter SY 39 $100.00 $3,900.00 24 P.C. Reinforced -Concrete -Steps LF 1 25 $136.00 $3,400.00 236 Tree Well (8'x8') No Grate EA 2 $24,000.00 $48,000.00 21 17" R -Winer Curb with M -orb -red Rock men one BlocR (6"x6"xup to 24") all, with mortared joints up to 3 - feet tall, Including foundation, (measured square feet of face of block) complete In place per square foot) ADDIT WALL @ LIBERTY SF 226 $83.00 $18,758.00 314 Concrete Coating Base Coat for Conc. Bridge WaT1- (Traffic Side Only Including Top of Wall) =SF 5900 $1.00 $5,900.00 51 Thermop1antic Pavement Mar kings-Reflectorized Type 1, 12 inches in width (SLD) (W) cross walks, 100 Mils in Thickness LF 69 $8.00 $552.00 52 2ffi—ermoplastic Pavement Markings-ReflectoTrz-e-d —Type I, 4 Inches in width (SLD)(Y), 100 Mils In Thickness LF 327 $4.00 $1,308.00 53 Thermoplastic Pavement Markings-Reflectorized Type 1, 4 inches in width (SLD)(W), 100 Mils In Thickness LF 695 $4.00 $2,780.00 59 TFe-rm-o-pTa—stic Pavement Markings-Reflectorized Type 1, WORD (W), 100 Mils In Thickness EA 1 $300.00 $300.00 204 WK ZN PAV MRK NON REMOV (W) 24" (SLD) LF 78 $9.00 $70400 177 8" C-900 SDR 14 PVC Pipe LF 65 $200.00 $13,000.00 203 Portable Changeable Message Sign EA -3 $20,000.00 -$60,000.00 $0.00 $0.00 $0.00 T- $0.00 TOTAL $190,94Z,40 0—