R-2015-2211 - 2/12/2015 RESOLUTION NO. R-2015-2211 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with S. J. Louis Construction of Texas, LTD for the University Boulevard (Phase I) and Parcel 150 (Phase II) 36-In Water Lines Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with S. J. Louis Construction of Texas, LTD for the University Boulevard (Phase I) and Parcel 150 (Phase II) 36-In Water Lines Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of February, 2015. Orn ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: .91P14,111 • (AB/te-- SARA L. WHITE, City Clerk 0112.1504;00328513 / Page 1 of 4 EXHIBIT Contract Quantity Adjustment/Change Order „A„ rev,08/12 Department: Utilities&Environmental Services Project University Boulevard&Parcel 150-36" Name: Water Lines Date: 1/5/15 City Project Change Order/Quantity ID Number UNV36/PL150 Adjustment No. 1 Justification Contract Quantity Adjustment/Change Order#1 is needed to adjust quantities for bid items listed. This will increase contract by$107,964.27 or 1.85%. SUMMARY Amount %Change Original Contract Price: $5,829,401.61 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $107,964.27 Total Quantity Adjustment(s): $107,964.27 Total Contract Price with Quantity Adjustment(s): $5,937,365.88 0.00 Previous Change Order(s): This Change Order: $0.00 0.00 Total Change Order(s)To Date: $0.00 0.00 Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $5,937,365.88 Difference between Original and Adjusted Contract Prices: $107,964.27 Original Contract Time: 330 Time Adjustment by previous Quan.Adj./Change Order: Time Adjustment by this Quan.Adj./Change Order: New Contract Time: 330 Submitted for Approval Prepared By:,;' (//, r_ /kildte Eddie Zapata, Project Manager, City of Round Rock //4-1/-:: Signature / �! Printed Name,Title,Company / Date A ( Approvals Contractor: POW/v`1k,0,-/./0414,--- 1AvipA,Q1U4 5'401S IMi6AfEA14 1571.0‘4►5 04451, Ila 1� Signature 1 ,'} Printed Name,Title, Company Date City Project , /'/7/ /� • Manager: ;'1,- Vii« i , 21\l 21 Eddie Zapata, Project Manager / /��_ Signature / / Printed Name,Title Date Mayor/City Manager Signature Printed Name,Title Date Page 2 of 4 Contract Quantity Adjustment/Change Order rev,08/12 Project Name: University Boulevard &Parcel 150-36"Water Lines Quan. Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount (Days) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $0.00 0 Page 3 o14 Contract Quantity Adjustment/Change Order rev,08/12 Project Name: University Boulevard &Parcel 150-36"Water Lines Quan. Adj./Change Order No.: 1 Quantity Adjustment Data Contract Time Adjustment Bid Item # Item Description Unit Qty. Unit Price Amount (Davc) 3 Jacking or Boring 24 in. Pipe,Class 150 (Univ. Blvd) per Section 501 LF 45.338 $315.00 $14,281.47 0 4 Jacking or Boring 30 in. Pipe,Class 150 (Univ. Blvd) per Section 501 LF 34 $400.00 $13,600.00 6 Encasement Pipe 24 in. Dia.,Type Steel (Univ. Blvd) per Section 505 LF -32 $47.00 -$1,504.00 7 Encasement Pipe 30 in. Dia.,Type Steel (Univ. Blvd) per Section 505 LF -34 $84.00 -$2,856.00 18 Ductile Iron Fittings 4 in.through 24 in. (Univ. Blvd) per Section 510 Ton 0.2 $1.00 $0.20 1 Jacking or Boring 54 in. Pipe,Class 150 (Parcel 150) per Section 501 LF 172 $665.00 $114,380.00 Encasement Pipe, 54 in. Steel ASTM A 4 134 (all depths) including excavation and (Parcel 150) backfill, per Section 505 LF -10 $224.00 -$2,240.00 Pipe, 36 in., Ductile Iron Class 200 Factory Restrained Joint(all depths) 8 including excavation and backfill, per (Parcel 150) Section 510 LF -60 $262.00 -$15,720.00 Pipe, 36 in., Ductile Iron Class 200 9 Factory Restrained Joint Carrier Pipe, (Parcel 150) Including Spacers, per Section 510 LF 60 $245.00 $14,700.00 25 (Parcel 150) Chain Link Fence, 6 ft., per Section 701 LF -1725.16 $15.00 -$25,877.40 26 Chain Link Vehicular Gate, per Section (Parcel 150) 701 EA -1 $800.00 -$800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 4 of 4 Contract Quantity Adjustment/Change Order rev,08/12 TOTALS: $107,964.27 0