Loading...
R-05-04-14-14A1 - 4/14/2005RESOLUTION NO. R -05-04-14-14A1 WHEREAS, §8.503 Code of Ordinances (1995 Edition) provides for the reimbursement for the oversizing of water mains, and WHEREAS, Zena Land Development, L.P. has submitted a reimbursement request for the oversizing of water mains associated with the Stoney Brook Sections 5 and 6 Subdivision, and WHEREAS, the City Council wishes to approve said reimbursement, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the City Council hereby authorizes the reimbursement to Zena Land Development, L.P. of $25,157.60, which is the cost of oversizing water mains associated with the Stoney Brook Sections 5 and 6 Subdivision. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this the 14th day of April, 2005. ST: tiffu2JP natt/yuk) CHRISTINE R. MARTINEZ, City Secret @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R50414A1.WPD/sc NY - TEL , ' ayor City .f Round Rock, Texas ry RANDALL JONES ENGINEERING, INC. Engineering Consultants / Planners / Surveyors March 9, 2005 Mr. Robert Betancur Zena Land Development 720 S. Kimball South Lake, Texas 76092 RE: Stoneybrook Sections 5 and 6 Waterline Reimbursements RJE Project #1126 Dear Mr. Betancur, The purpose of this letter is to provide you with information regarding reimbursements from the City of Round Rock that you may be eligible for over sizing certain waterlines within the above referenced project. Per the City of Round Rock's Development Code and more specifically the Water and Wastewater Oversize Policy, "If a development is required to oversize utility lines in excess of the developments direct needs, the development will be given credit for the amount oversized." It is the opinion of Randall Jones Engineering, Inc. that the 12" water line located within Sandy Brook Drive was oversized beyond the needs of this development. Typically an 8" would have been sufficient and adequate to serve the 80 single-family lots within these two sections of development. Therefore, in accordance with the City's policy you may request reimbursement of $2.60 per inch diameter oversized per linear foot of line installed. For Section 5 of Stoneybrook, 842 feet of 12" line was constructed. Within Section 6 of Stoneybrook, 1,577 feet of 12" line was constructed The reimbursement calculation is $2.60/inch-foot x 4" x 2,419 feet = $25,157.60. Approved construction plans are on file at the City of Round Rock for this project that shows the water line location and sizing. Please let us know if you need any additional information regarding this reimbursement request. Sincerely, . Keith Collins, P.E. Project Manager File:reimburse 3 • g* • JKEITH COLI •���N•••N•..N..1.ea a 80579 f/9 /O5 1212 E. Braker Lane • Austin, Texas 78753 • 512 / 836-4793 • FAX 512 / 836-4817 Mar 29 05 10:O1a Zena ZONA March 10, 2005 Mr. Danny Halden, P.E. Chief Engineer City of Round Rock Department of Public Works 2008 Enterprise Dr. Round Rock, TX 78664 8174216910 p.2 Fort Worth • Dallas • Austin Re: Stoney Brook Section 5 & 6 Oversize Waterline Reimbursement Dear Mr. Halden, On behalf of Austin Stoney Brook LP, by Zena GP 5, LLC, it's general partner, owner of the above referenced subdivision, please let this letter serve as a request for the Water Oversize Reimbursement for the above referenced subdivision. This reimbursement is being requested in accordance with the City of Round Rock's Oversize Policy which states: "if a development is required to oversize utility lines in excess of the development's direct needs, the development will be given credit for the amount oversized." Attached, we have included a letter from Randall Jones Engineering, Inc., which shows the calculations and also sununarizes the total Oversize Reimbursement Fee to be $25,157.60. Additionally, as the letter states, the Approved plans, which can be used as documentation, are currently on file with the City of Round Rock. Once this request receives the required City Council approval, we ask that the reimbursement be forwarded directly to Austin Stoney Brook LP as noted below: Austin Stoney Brook LP P.O. Box 92864 Southlake, TX 76092 Should there he any questions or issues with this request, please contact me immediately. Your attention to this request is greatly appreciated. Sinc 2obert J. B a recur Vice PresiSent Austin Stoney Brook LP By: Zena GP 5, LLC, it's general partner P.O. Box 92864, Southlake, Texas 76092 Metro (817) 424-1392 Fax (817) 421-6910 03/29/2005 TUE 09:54 [TX/RX NO 5071] e1002 P r i L.F. of 12" Waterline Canstructed With Stoney rook/ Section 1577 L.F. of 12"Waterline ' z. Constructed With Stoney Brook/Section 6 �� r; w STONEY BROOK PROPOSED WATERLINES r r Pw xw n� 4 r w . r y u a u " 3 yy� i' r ar � a x "'�RW�ND R�µQ(:K,aiewviv