Loading...
R-05-03-24-12D1 - 3/24/2005RESOLUTION NO. R -05-03-24-12D1 WHEREAS, §8.503, Code of Ordinances (1995 Edition) provides for the reimbursement for the oversizing of wastewater mains, and WHEREAS, Canteberry Development, Ltd. has submitted a reimbursement request for the oversizing of wastewater mains associated with the Eagle Ridge Section 14, Phase III subdivision (within the Longhorn Trail right-of-way and abutting Public Utility Easement), and WHEREAS, the City Council wishes to approve said reimbursement, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the City Council hereby authorizes the reimbursement to Canteberry Development, Ltd. of $14,742.00, which is the cost of oversizing wastewater mains associated with Eagle Ridge Section 14, Phase III subdivision (within the Longhorn Trail right-of-way and abutting Public Utility Easement). The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this the 24th day of Marc ATTE NYL City CHRISTINE R. MARTINEZ, City Secretary @PFDesktop\ODMA/WORLDOX/O:/WDOX/RESOLUTI/R50324D1.WPD/sc ELL, Mayor Round Rock, Texas S. D. KALLMAN, L.P. Engineers and Environmental Consultants February 24, 2005 Mr. Danny Halden, P.E. City Engineer City of Round Rock Public Works Department 2008 Enterprise Round Rock, Texas 78664 RE: EAGLE RIDGE SECTION 14, PHASE III SUBDIVISION WASTEWATER LINE REIMBURSEMENT LETTER Dear Mr. Halden: Please accept this letter as a request for reimbursement in the amount of $14,742 for the oversizing of the wastewater lines in the above -referenced subdivision. This subdivision consists of 23 single-family Tots, which requires only an 8" wastewater line. During the review of the construction plans, the City required the developer to re -install 590 L.F. of existing 15" wastewater line and 154 L.F. of existing 18" wastewater line. These existing wastewater lines were installed in the 1980's per the street and lot layout of the Vista Heights Section 4A recorded plat. However, the wastewater lines were not installed on proper assignment along the street centerline and common side lot line resulting in the developer having to replace the wastewater lines. Below is a breakdown of the reimbursement fee. 15" wastewater line — ($2.60/inch/L.F.)*(7 inches)*(590 L.F.) = $10,738 18" wastewater line — ($2.60/inch/L.F.)*(10 inches)*(154 L.F.) = $ 4,004 Total = $14,742 Please contact me if you have any additional questions or comments. Cordially, S.D. KALLMAN, L.P. -- ENGINEERS AND ENVIRONMENTAL CONSULTANTS Bryan N. Sims, P.E. Project Manager cc: Mr. Cosmo Palmieri, Canteberry Development, Ltd. J9Wpdocs\Eagle.16 Ph II, III, IV, V\PHASE IllbversizeFeeReimb(D Halden)doc Phone: 512/218-4404 1106 S. Mays, Suite 100 Fax: 512/218-1668 Round Rock, Texas 78664 CANTEBERRY DEVELOPMENT LTD. PO BOX 28398 AUSTIN, TX 78755 February 24, 2005 Mr. Danny Halden, P.E. City Engineer City of Round Rock Department of Public Works 2008 Enterprise Drive Round Rock, Texas 78664 RE: EAGLE RIDGE SECTION 14, PHASE 111 SUBDIVISION WASTEWATER LINE REIMBURSEMENT Dear Mr. Halden: On behalf of Canteberry Development, Ltd., owner of the above referenced subdivision, please let this letter serve as verification that Canteberry Development, Ltd. installed and paid for the improvements for which reimbursement is requested. Canteberry Development, Ltd. has the rights to and is due any reimbursement for oversizing and has not assigned those rights away to another. Specifically, the reimbursement due for Eagle Ridge Section 14, Phase III Subdivision are calculated as follows: 15" wastewater line - ($2.60/inch/L.F.)*(7 inches)*(590 L.F.) = $10,738 18" wastewater line - ($2.60/inch/L.F.)*(10 inches)*(154 L.F.) = $ 4,004 Total = $14,742 Once this request receives the required City Council approval, we ask that the reimbursement be forwarded to Canteberry Development, Ltd. at the following address: Canteberry Development, Ltd. Attn: Cosmo A. Palmieri 6907 Capital of Texas Hwy., N., #332 Austin, Texas 78731 Should you have any questions or need any additional information, do not hesitate to call. Sincerely, osmo A. P mieri Canteberry Development, Ltd. cc: Bryan N. Sims, P.E., S.D. Kallman, L.P. J:1Wpdocs`Eagle.14 Ph II, III, IV, VPPHASE III `OversdeWLorVWVReimb.Ltr(D.HaIden)Aoc DATE: March 17, 2005 SUBJECT: City Council Meeting - March 24, 2005 ITEM: 12.D.1. Consider a resolution approving a reimbursement to Canteberry Development, Ltd. for the cost of oversizing wastewater mains associated with the Eagle Ridge, Section 14, Phase III development. Department: Engineering and Development Services Staff Person: Danny Halden, City Engineer Justification: The developer of Eagle Ridge Section 14, Phase III installed 590 linear feet of 15 -inch wastewater main and 154 linear feet of 18 -inch wastewater main within the Longhorn Trail Right -of -Way and within an abutting 40 -foot Public Utility Easement. According to documentation from the developer's engineer, existing 15 -inch and 18 -inch wastewater mains that were in place, had to be realigned and the depth adjusted to assure the needs of the development complied with current City specifications. The 15 -inch and 18 - inch main diameters are necessary in order to provide service for future development in that particular service area. Funding: Cost: $14,742 Source of funds: Oversize Account Outside Resources: S.D. Kallman, L.P. Canteberry Development, Ltd. Background Information: The City requested as part of the Eagle Ridge Section 14, Phase III wastewater system improvements, that the 15 -inch line be constructed to replace an older 15 -inch line that was no longer compliant with current City specifications regarding alignment and depth. The city also requested that the 18 -inch line be constructed to replace an older 15 -inch line that was no longer compliant with City specifications regarding alignment and grade. According to engineering documentation provided at the time of platting, an 8 -inch main would have been sufficient for the needs of the development. Public Comment: N/A