R-2016-3428 - 5/12/2016RESOLUTION NO. R-2016-3428 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with APAC Texas, Inc. — Wheeler Companies for the 2014 Street Maintenance Program (Overlay) Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with APAC Texas, Inc. — Wheeler Companies for the 2014 Street Maintenance Program (Overlay) Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of May, 2016. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: bfiffl2: SARA L. WHITE, City Clerk 01111604;00356659 EXHIBIT «A„ Page 1 of 3 Contract Quantity Adjustment/ Change Order ROUND ROCK 7EXA5 rev, 01/16 Department: Transportation Project Name: 2014 -Street Maintenance Program (Overlay).. '.Date: 3/17/16 :. City Project Change Order/Quantity ID Number MNT14 Adjustment No. 2 Vendor APAC-Texas, Inc 1 Chisholm Trail Round Rack, Texas 78681 512-861-7100 Company Name Address Phone No. Justification Quantity Adjustment/Change Order # 2 is a final quantity adjustment to reflect actual project quantities for this project. These adjustments are the result of additional areas found during the pavement repairs and overlay for the 2014 Street Maintenance Program (Overlay). SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: Amount 0/0 $5,250,176.211,-111-1-4 - 1073 079.6 $4,177,096.64�� $51,600.00 1% $24,278.00 1% $75,878.00 2% $4,252,974.64 -$997,201.61 275 days 2 II New Contract Time: 288 Days City Project Manager: Signature Printed Name, Title, Company Date Signature Printed Name, Senior, City of Round Mayor/City Manager Signature Printed Name, Title Date F=� IRO'_ Contract Quantity Adjustment/ Change Order UNOROCKMAS rev, 01(16 Project Name: 2014 Street Maintenance Program (Overlay) Quan. Adj./Change Order No.: Chance Order Data Page 2 of 3 Item # Item Description Unit Qty. Unit Price Contract Time Adjustment Amount (Days) 901 Pavement Repair LS 1 $9,250.00 $9,250.00 1 902 Crack fill LS 1 $15,028.00 $15,028.00 10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $24,278.00 _ 11 Page 3 of 3 01Contract Quantity Adjustment/Change Order POUNDROCKTO(Av rev, 01/16 Project Name: 2014 Street Maintenance Program (Overlay) Quan. Adj./Change Order No.: 2 llnnntifir AAi,wtmmn1- nnfn Bid Item # Item Description Unit Qty. nt rtce moun Contract Time Adjustment 1 Machine -Laid Type D Overlay TON -2950.639318u $88.00 -$259,656.26 2 Machine -Laid Type FOverlay TON -115.1176 $100.00 -$11,511.76 3 Pavement Repair TON -8144.157843 $102.00 -$830,704.10 4 Type D HMAC Spot Level -Up TON -57.75 $120.00 -$6,930.00 5 Edge Milling SY 0 $1.60 $0.00 6 Surface Milling SY 0 $1.60 $0.00 7 Remove/Replace Concrete Curb & Gutter LF -125.4834426 $61.00 -$7,654.49 8 Remove/Replace Concrete Driveway SF 1 4550.71428 $21.00 $95,565.00 9 Remove/Replace Reinforced Concrete Sidewalk SF -1532.235294 $17.00 -$26,048.00 10 Manhole Adjustment EA -23.2928176 $905.00 -$21,080.00 11 Valve Can Adjustment EA -3.45945945 $740.00 -$2,560.00 12 Reinforced Concrete Sidewalk Ramp RA -0.83333333 $3,000.00 -$2,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 12, t� TOTALS:TOTALS:l 41,073,079.61