Loading...
R-05-04-28-10D4 - 4/28/2005RESOLUTION NO. R -05-04-28-10D4 WHEREAS, the City of Round Rock has duly advertised for bids for the Onion Branch/Georgetown Railroad Culvert Improvements Project, and WHEREAS, Chasco Contracting, Inc. has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Chasco Contracting, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Chasco Contracting, Inc. for the Onion Branch/Georgetown Railroad Culvert Improvements Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 28th day of April, 2005. NY .%WELL, ayor City of Round Rock, Texas CHRISTINER. MARTINEZ, City Secret ®PFDesktop\::ODMA/WORLDOX/O,/WDOX/RESOLVPI/R50428D4.WPD/sc y Re Espey Consultants, Inc. ■ Environmental & Engineering Services March 30, 2005 Michael Thane, P.E. City of Round Rock Public Works Depai lment 2008 Enterprise Drive Round Rock, Texas 78704 Re: Onion Branch/Georgetown Railroad Culvert Improvements Contract Award Recommendation EC Project No.2042.102 Dear Mr. Thane: On March 22, 2005, bids solicited for the Onion Branch/Georgetown Railroad Culvert Improvements Project were opened publicly and read aloud. Four bids were received. The apparent low bidder is Chasco Contracting, with a bid amount of $353,530.00. The next lowest bid amount is $421,150.00 and the Engineer's Opinion of Probable Construction Costs is $358,775.00. A tabulation of the bids is enclosed for your reference. Espey Consultants, Inc. performed a contractor evaluation of Chasco Contracting. After reviewing the contractor's statement of experience and contacting several references, Chasco Contracting appears to be qualified to complete this project. Copies of the contractor's evaluation forms are enclosed for your reference. Based upon the bid amount received and subsequent contractor evaluation, Espey Consultants, Inc., recommends awarding the Onion Branch/Georgetown Railroad Culvert Improvements Project to Chasco Contracting for the amount of $353,530.00. It has been a pleasure working with you and your staff on this project and we look forward to its completion. If you have any questions, please call me at (512) 326-5659. Sincerely, Keith A. Moody, P.E. Managing Engineer Enclosures P:Iactive12042.102 Onion Branch Design&Letters1050329MThane.doc 3809 South 2nd Street, Suite B-300 O Austin, Texas 78704 O (512) 326-5659 O FAX (512) 326-5723 480 North Sam Houston Pkwy. East, Suite 180 0 Houston, Texas 77060 0 (281) 591-8916 0 FAX (281) 591-8925 N CC Carlton Industries, Inc. j 0 F,-1 O X Q 0 0 0 N coO m 64 0 0 0 o re 69 V3 FA 0 0 0 0 0 6 coO O N v N Vi 06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O N 6 O o v N r N 00 vi 00 .p d 06 69 06 69 �N 0 0 0 0 0 0 O O o co N O o 6 o en v) 6991' 64 N 69 EA 0 0 0 0 0 0 O 0 .+ V N R 69 E" V aM Ci 0 0 0 0 0 0 N M. f9 co 0 O\ 699 PI o co 0 O 0 64 69 O 0 O O vi ON �' M O O co O co 0 0 0 N 0 0 0 0 0 0 S '4 O 69 69 '0 "' ni 66. 69 O O O 0 O 0 0 vi 0 o us CD o N 69 69 O 0 0 0 0000000000000 o N0 N us AMO1 INT r j 0 o 00000 tel v T 6. 0 0 0 0 O co v 00 V V 6.69 0 o o a N 69 0 0 0 0 0 0 0 0 0 0 0 0 o vi vi o 00000 o O T N 41 0 N r a N 0 v ..P.'N - V 64 r� 69 69 69 69 6991 6 0 0 0 0 0 0 6 0 00 N v1 N V v 69 0 0 M vI [16 69 69 0 M 69 N 0 0 O N 69 $21.00 0 0 > 0 W 9 6699 < r 6 AMOUNT 1 pY/An) cn cc 00 O O O O 69 69 O P N 69 $1.80I coo Ann nn 0 0 O O N O1 64 6A BID TABULATION o o 0 0 0 0 0 0 0 0 o 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 O O 0 0 0 0 0 0 0 N O O Vi O O O O N N N N 6 O h 0 0 6 O N N 0 N N 0 N 0 eel O O 6 P N N 64 O N V 44 N N 0 0 41 6A 6. fA 69 V EA 61 69 69 69 N )0 vl N 69 69 M V 69 z� Ua O N 69 0 0 O 6. O 0 69 0 69 69 0 0 69 69 0 91 O N 69 O 6A 0 vi O 0 O 69 O 99 0 O O 69 0 0 0 69 6, L) U N a k. %` N a J v 00 a 000 0 N 0 N 0 DESCRIPTION d v n 0 U Y 021 C 3 00 N M N b 6 0) 0 'O • 0) z 0 z 00 rn O M 051 0 BidTabulation.xls y a 0 N I* 0 0 W O a j 0 F O\ o 0 o 000)000001/10)610010 49 69 o 0 o O W 69 00 0 0 O rn - 60A 0 0 O0i 0 0 0 O 669 N� 0 0 0 N CO 664 0 0 0 0 0 0 N M. f9 0 0 0 r 609 0 0 0 V'9 499 0 0 0 64 0 0 0 O O N r 69 0 0 0 o 0 0 P. b e1 69 [.y W 4FU9 o O 0000000000000 o N0 N us 0 O 06 0 0 S 69 0 N V 69 0 6 O O 696 69 0 O 00 69 o 6- 00 69 0000000 69 vi 4"90 69 0 M 69 N 0 0 O N 69 O 0 O b 69 I 3 Austin Engineering Co., Inc. AMOUNT 0 0000000000 C N N O N 69 00 O O O O 69 69 O P N 69 0 0 op r0 .--T 69 0 0 O O N O1 64 6A 0 6 O N V 69 0 0 O 00 )O 69 0 6 O N 69 0 o N 9- M EA $2,000.00 I tic() nn > 0 > O 1 06 ) 0 1 0 9 0 )O 661 0 o 0 0 .-. 69 0 0 0 v1 T en I-- V 69 UNIT PRICE �O O vi Vi 69 O O O O 0 O M 69 O O O 01 N 69 O o O) N 6A 0 0 6 O O 06 c 69 0 0 Ci tel 69 0 0 0 0o 69 0 0 '-, 69 0 0 vi N Vi 0 0 0 0 n 0 69 O 0 0 0 O b 69 0 0 O 0 0 G 69. Vf 9 UNITS c V) a 69 a WQ .a W SY SY SY LF EA LF LS LS QUANTITY 0 telo -.v 80 90 85 0 0 0 0 N Lel �o•nr^_^.T^_-^ DESCRIPTION A Z 4 0 C rnannei Excavation, Flan Quantity, complete Upstream Retaining, Wing, & Headwalls, complete Downstream Retaimng, Wing & Headwalls, complete Excavation Safety Systems, complete Concrete Box Culverts, complete Dry Rip Rap, complete Concrete Rip Rap, complete Non -Native Seedmg, complete Temporary Rock Berm, complete Stabilized Construction Entrance, complete Silt Fence for Erosion Control, complete Total Mobilization complete emporary onunng Wall, complete Tn'rsr 131c.,r�� A 0 LC F N M V 6) o 6- co cr.,0- ^ M. BidTabulation.xls CULVERT IMPROVEMENTS AREA 0\-P'G��PG�GR ONION CRc�� G) n O NE�M��PG�o� �0-o s�o 0 N EXHIBIT "A" A ONION BRANCH CULVERT IMPROVEMENTS ROUND ROCK,TEXAS ROUND ROCK, TEXAS "°�" S:1 raphics\CiouncllAp@nda\cip 2006ZnionSranchCulvery.mxd DATE: April 21, 2005 SUBJECT: City Council Meeting - April 28, 2005 ITEM: 10.D.4. Consider a resolution authorizing the Mayor to execute a contract with Chasco Contracting for the Onion Branch/Georgetown Railroad Culvert Improvements Project. Department: Engineering & Development Services Staff Person: Tom Word, Chief of Public Works Operations Justification: This project is to improve existing conveyance conditions along Onion Branch in the vicinity of the Hermitage subdivision. Currently, there are five 30 -inch diameter pipe culverts that are located on Onion Branch at the existing railroad tracks. During large storm events, these pipe culverts are not large enough to transport the stormwater past the railroad tracks without overtopping the tracks or backing up water into the streets. This project will replace the five existing pipe culverts with four 8 -foot box culverts, to improve the conveyance of stormwater under the railroad tracks. Georgetown Railroad Company will assist the City and Chasco with this project by removing the tracks and replacing the tracks as needed in order to keep at least one of the three railroad tracks operational at all times. On March 22, 2005, four bids were received and opened. The low bidder is Chasco Contracting with a bid amount of $353,530.00. The Engineer and the City Staff recommend award of the contract to Chasco. Funding: Cost: $353,530.00 Source of funds: Regional Detention Outside Resources: Chasco Contracting Espey Consultants, Inc. Georgetown Railroad Company Background Information: The eastern edge of the Hermitage subdivision is within the 100 -year flood plain. Although the houses in the subdivision are somewhat elevated and haven't experienced flooding, the streets in the subdivision do become inundated with water during intense rainfall events. Public Comment: N/A