Loading...
CM-2016-1109 - 5/13/2016 i Page 1 of 3 i Contract Quantity Adjustment/Change Order ROUNU RUCK TEXAS rev,01(16 Department: PARD Project Name: Old Settlers Park Multipurpose Field=Complex Date: 4/11/16 City Project Change Order/Quantity ID Number Adjustment No. #1 Vendor ]oeris General Contractors 823 Arion Parkway,San Antonio,TX 78216 210-494-1638 Company Name Address Phone No. Justification See attached Summary Form SUMMARY Amount %Change Original Contract Price: $22,994,973.00 Previous Quantity Adjustment(s): This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.001 Total Contract Price with Quantity Adjustment(s): $22,994,973.00 Previous Change Order(s): 0% This Change Order: $0.00 0% Total Change Order(s)To Date: $0.00 0% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $22,994,973.00 Difference between Original and Adjusted Contract Prices: $0.00 Original Contract Time: 696 days Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 0 New Contract Time: 696 days Submitted for Approval Prepared By: � �� �/ fir✓ CDe p � � M�� / / �Lz![� Signature Printed Name,Title, mpany Dat ® ' Approvals e �•(-1^,CAx- Se-v-, eQ l�aNis, 7 6�� cme-1 Contra r ' h , CeHei4( ��H✓ —lS_l� Signatu aPrinted Name,Title,Company Date City Project y1 � Manager: �� r�2K DEQ �1AN�tv��2 �f Z 6 Si n ure Printed Name,Title Date Mayor/City Manager IF- FkDLZ-q n( hEi;-2- 5 gnatur Printed Name,Title Date nfnn,2ol�- llo�' Page 2of3 Contract Quantity Adjustment/Change Order ROUND ROQ(TEXAS rev,01/16 Project Name:,Old Settlers Park Multipurpose Field Complex Quan.Adj./Change Order No.: #1 Change Order Data Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount (Days) 1 Sanitary Sewer Revisions LS 1 -$14,493.00 -$14,493.00 0 2 Widen Trench Drain at Fields 3-6 LS 1 $8,124.60 $8,124.60 3 Delete Sidewalk at Fields 8&10 LS 1 -$6,543.00 -$6,543.00 4 Add 250 LF drainage for Quarry Wall LS 1 $8,969.00 $8,969.00 5 Delete Field Striping at Natural Turf LS 1 -$23,000.00 -$23,000.00 6 Delete Well Demo from Scope LS 1 1 -$10,284.00 -$10,284.00 7 Elevator Requirements LS 1 $959.00 $959.00 8 Add Silt Fence near second spoil site LS 1 $2,175.00 $2,175.00 9 Dimantling Joint at Reuse Vault LS 1 $1,306.00 $1,306.00 10 Ductile Iron Offset in Reuse Line LS 1 $5,114.00 $5,114.00 Delete trees,add picnic areas at center 11 walkway LS 1 1 $11,924.00 $11,924.00 Transfer to Owners Betterment Allowance 12 to offset price of dillo dirt LS 1 $15,748.40 $15,748.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $0.001 0 Page 3 of 3 Contract Quantity Adjustment/Change Order 1-26. ND ROpC TD(AS rev,01/16 Project Name: Old Settlers Park Multipurpose Field Complex Quan.Adj./Change Order No.: #1 Quantity Adjustment Data Contract Time Adjustment Bid Item # Item Description Unit Qty. Unit Price Amount f Dave) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $0.00 0 Old Settlers Park Multipurpose Field Complex Change Order #1 Summary Date:04/29/2016 Change Order#1 to the contract with Joeris General Contractors includes changes to the current phase of construction.These changes include: Sanitary Sewer Revisions: During the planning and design phase,the sewer line for the southern restroom building was discovered to have constructability issues. Upon realizing these issues,the contractor;consultant, and City worked to modify the plans to connect to new sewer lines being installed within the complex. The redesign actually ended up requiring less pipe and subsequent trenching, as well as one less manhole. Cost: ($14,493.00) Widen Trench Drain at Fields 3-6: During construction of the natural turf fields, it was observed that the fields would be on solid rock. The contractor was asked to use 6" of existing clay material above the rock to provide extra growing medium for the turf grass at no additional cost(this did, however, add 7 days to the sod installation date). Due to this change in elevation,there would be an elevation change between the pavilion areas and the field surface. The trench drain running along the field needed to be widened to allow for a field rail. Cost: $8,124.60 Delete Sidewalk along Fields 8&10: During construction it was observed that the retaining wall alongside the fields would be within the monarch trees' critical root zone. The sidewalk located at the top of the retaining wall was removed and the wall moved in 4 feet to stay out of the critical root zone of these trees. Cost: ($6,543.00) Add 250 LF Drainage for Quarry Wall: The drainage area behind the quarry wall was not connected to any storm sewer or given the opportunity to daylight. Therefore,the water would stand behind the quarry wall and jeopardize the integrity of the wall. Drainage pipe was added to provide an outlet for this water. Cost:$8,969.00 Delete Field Striping at Natural Turf: One of the requirements for the contractor in the specifications was for them to provide field striping for the natural turf fields. This will not be necessary since the fields will not be played on immediately. Our team would have had to re-stripe the fields prior to the first game anyway, so this was deleted from the scope. Cost: ($23,000.00) Delete Well Demo: After an investigation, no well was found on the property so the entire scope of this item was deleted. Cost: ($10,284.00) Elevator Requirements: While completing shop drawings, it was found that a couple of items required to meet state elevator code were not included in the original plans. Items included additional GFI receptacles and relocating disconnects to the Elevator Machine Room. Cost: $959.00 Add Silt Fence at Second Spoil Site: During contract negotiation, it was agreed that the contractor could spoil 23,000 cubic yards of material onsite over 2 acres at Rock N River for a cost savings to the City. However,the agreed upon amount was not able to be spoiled over only 2 acres. A second spoil spot was agreed upon, with additional erosion control measures necessary. Cost: $2,175.00 Dismantling Joint at Reuse Vault: Utility support requested the contractor to add a dismantling joint not show in the detail for ease of maintenance. Cost: $1,306.00 Ductile Iron Offset in Reuse Line: During construction, it was noticed that the flow line of a proposed storm sewer and the existing reuse water line were in direct conflict with one another. It was impossible to lower the sewer line without causing major problems and lots of money to repair. The decision was made that the best and cheapest option was to lower the reuse water line. Cost: $5,114.00 Delete Trees/Add Picnic Areas at Center Walkway: Test holes were dug for the trees and filled with water to determine feasibility of planting trees along the center walkway as planned. The tree wells did not drain due to rock condition and it was determined that installing tree drainage would be too costly ($48,172.30). The decision was made to delete the trees and install picnic pads(with umbrellas)to still provide a shady area for spectators to congregate. Cost:$11,924.00 Transfer to Owners Betterment Allowance: Since the work outlined above netted an overall credit to the City, it was decided to transfer it to the Owner's Betterment Allowance to offset the cost of the Dillo dirt amendment to the soil. Cost: $15,748.40 Total this Change Order: $0.00 Contingency Original Spent to Date Remaining $973,670.91 $0.00 $973,670.91 Betterment Allowance Original Spent to Date Remaining $200,000.00 $84,252 $115,748 Oncor Allowance Original Spent to Date Remaining $350,000.00 $343,687.00 $6,313.00 Architectural Revisions Allowance Original Spent to Date Remaining $250,000.00 $155,301.00 $94,699.00 2 ' Owner's Betterment Allowance Tracking Date Notes Starting Cost Impact Ending PARD Joeris Balance Balance Approval Approval 12-17-15 Original allowance $200,000.00 N/A N/A amount per signed I/n contract 3-21-16 Dillo amendment $200,000.00 $100,000.00 $100,000.00 Ian for soil 4-29-16 Credit for Change $100,000.00 ($15,748.00) $115,748.00 Order#1 �J Oncor Allowance Tracking Date Notes Starting Cost Impact Ending PARD Joeris Balance Balance Approval Approval 12-17-15 Original allowance $350,000.00 N/A N/A amount per signed contract 4-11-16 Oncor Civil by $350,000.00 $343,687.00 $6,313.00 Capital in Areas 1 and 2 and 320 LF of Area 3 Architectural Revisions Allowance Tracking Date Notes Starting Cost Impact Ending PARD Joeris Balance Balance Approval Approval 12-17-15 Original allowance $250,000.00 N/A N/A amount per signed contract 3-28-16 RFP #1b $250,000.00 $155,301.00 $94,699.00 City of Round Rock ROUND ROCK TExAs Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Joeris General Contractors, Ltd. for the Old Settlers Park Multipurpose Field Complex and Soccer Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 5/13/2016 Dept Director: Rick Atkins, Director Cost: Indexes: 2014 General Obligation Bonds Attachments: LAF-Quantity Adjustment-Change Order#1 w- Joeris General Contractors (00355923xA08F8).pdf, CO#1.xls, Change Order#1 Summary.docx Department: Parks and Recreation Department Text of Legislative File CM-2016-1109 This item will authorize the City Manager to execute Quantity Adjustment/Change Order No. 1 with Joeris General Contractors. Items in this Change Order include: sanitary sewer revisions, trench drain modifications, sidewalk modifications, drainage improvements, changes in contractor scope, and reuse water line modifications. This Change Order netted a$15,748.40 credit which has been transferred to the Owner's Betterment Allowance to help offset the price of the dillo dirt amendment at the natural turf fields. The Multipurpose Field Complex Project includes five (5) natural turf multipurpose fields, five (5) synthetic turf multipurpose fields, parking, sports lighting, restroom/concessions building, spectator amenities, playground, etc. The Soccer Complex Project will include renovation of the existing five (5) soccer fields to create two (2) multipurpose fields and three (3) individual soccer fields (1 full, 2 youth), replacement of the existing topsoil and sod, and ADA upgrades to the complex. The Multipurpose Field Complex will be completed first which will allow the City to move local leagues to the Multipurpose Complex while construction on the Soccer Complex occurs. This project is in line with numerous objectives within Strategic Plan Goals 1-High Value Services and Goal 4-Sports Capital for Tourism. Department official recommends approval of this item. City of Round Rock Page 1 Printed on 511212016 LEGAL DEPARTMENT APPROVAL.. FOR, CITY COUNCILICITYMANAGER ACTIO Required forSubmission of ALL City Council and City Manager Items- bld.Set&rs Park Multipurpose,Field;Cornplex.and, Department-Name: PARD Projg6t Name: so—' r'Contplex Improvemgnts Project MqrlResoulce; KaGe.Baker Cont4&bDWendOr: Joeris'General Contractors,W []Council Action: 0 ORDINANCE RESOLUTION Agenda Wording xX City Manager Approval CMA Wording Consider executing;Quanfity Adjustment/Change Order'No.1 with keris:General Contractors,Ltd.for the Old Settler.'s Park Multipurpose Fiek Complex,and Soccer Complex Improuerients Project. Attorney Approval a Attorney Date; 44 Notes%Comments O:\wdoxlSCClnts101"gg\1,5611MISC1O0355923.XLS Updated 6/3108