R-05-05-12-11C2 - 5/12/2005RESOLUTION NO. R -05-05-12-11C2 WHEREAS, the City of Round Rock has duly advertised for bids for the Water Treatment Plant High Service Pump Generator Project, and WHEREAS, Electrique Corporation has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Electrique Corporation, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Electrique Corporation for the Water Treatment Plant High Service Pump Generator Project. The City Council hereby finds anddeclares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. .RESOLVED this 12th day of May, 2005. ailtvhpyi CHRISTINE R. MARTINEZ, City Secr @PFDesktop\::ODMA/WORLDOX/O:/NDOX/RESOLUTI/R50512C2.WPD/sc WE L, M- or City of Round Rock, Texas 12357-A Riata Trace Parkway, Suite 210 Austin,Texas 78727 tel: 512 346-1100 fax: 512 345-1483 April 21, 2005 Mr. Don Rundell, P.E. Chief Utility Engineer City of Round Rock 212 Commerce Cove Round Rock, TX 78664 Subject: City of Round Rock WTP High Service Pump Generator Recommendation of Award Dear Mr. Rundell: On April 12, 2005, bids were opened for the Water Treatment Plant High Service Pump Generator Project. Three bids were received and are summarized below: Electrique Corporation $777,050.00 T Morales Company $800,625.00 Keystone Construction, Inc. $812,510.00 The low bidder was Electrique Corporation with a bid of $777,050.00. This project provides for back-up generator power for high service and/or backwash pumping. A detailed bid tabulation is attached to this letter. The engineer's construction cost estimate for the project was $950,000. As you are aware, Electrique Corporation's bid included a technicality in the bid form. Attached is a letter from the Electrique Corporation addressing the bid technicality. The Electrique Corporation is an approximate $5,000,000.00 a year construction company that has experience in water and wastewater treatment facilities. We have checked their references and based on the information obtained we believe that the Electrique Corporation is capable of satisfactorily completing the WTP High Service Pump Generator Project. W:\City of Round Rock\High Service Pump Generator\Correspondence \ ROA DR_ April 22 2005.doc consulting • engineering • construction • operations Mr. Don Rundell April 21, 2005 Page 2 Therefore, we recommend that the City of Round Rock award the WTP High Service Pump Generator Project to Electrique Corporation in the amount of $777,050.00 If you have any questions or comments regarding this recommendation, please let me know. Sincerely, 71, Greg T. Swoboda, P.E. Project Manager Camp Dresser & McKee Inc. Attachments xc: Allen Woelke, CDM W:\City of Round Rock\High Service Pump Generator \ Correspondence \ROA_DR_ April 22 2005.doc 0 0 o E. a d. ..c"E. o 0 E N o a i 8 ix ". C 0 " 0 d 0 o Q N cc Ei2 E 7F. oF'a a U.E a w 0 cn P r co a) Bid Tab Details 4/13/2005 T Morales Company Keystone Construction, Inc. Electrique Corporation PO Box 859 PO Box 160938 PO Box 6004 Florence, TX 76527 Austin, TX 78716-0938 Texarkana, TX 75505 Contact: Farrell Prewitt Contact: Charlie Carlisle Contact: Mike Lilly Phone: 254-793-4344 Phone: 512-288-6437 Phone: 903-838-6578 Unit Price I o I Amt UUUVL 1 I $ 500 0 o 0 n UUV' ) 0 ) 0 - v ) 0 L) r� r 0 0 o r0 0 0 o 10 R $ 2.000 $ 2.000 I ) 0 0 > o N 0 0 c N 0 R n 0 00 A N 0 r 0) N Cr)O 0 Total Amt. 1 $ 783,280 1 $ 783.280 $ 40 $ 2,000 $ 0 0 N o co N. n 3,200 O to Cf) n N O 0NI O �$ 25,450.00 $ 1,780 $ 1,780 $ 1,780.00 $ 812,510.00 UO) 'C a c D O N T 0 Unit Price Total Amt. $ 772,550 I $ 772,550 �a o 0N ce)IR 64 $ 3,200 L)o $ 20,000 $ 26,225.00 _o T 0 0 69 69- CO H) N EA T (A O 0 N U) 0 0 r d3 ESTIMATED ITEM DESCRIPTION QUANTITY UNIT 'TOTAL Base Bid Additive Alternates u .-1 w�>) ,-7 vc U vi -1 Overall Bid Excepting following Bid Items: 1 Trench Safety System in place as detailed and specified 50 400 250 0 o0 O TOTAL TOTAL NOTAL Base Bid and Additive Alternates a. 4" Thick Sidewalk N U C W 0) b-0 ' cn U ' d. Urouting For selling and delivering insurance, general 2 and administrative and aerial photographs 1 Z rr Bid Tab Details 4/13/2005 ELECTRIQUE CORPORATION ELECTRICAL CONTRACTOR Greg Swoboda Camp Dresser and McKee 12357-A Riata Trace Parkway Suite 210 Austin, TX 78727 Reference: Round Rock Generator Project Mr. Swoboda: Electrique Corporation apologizes for the confusion created by the failure to circle Kohler as the generator manufacturer used in the preparation of Electrique Corporation's bid for this project. As stated in the Bid Documents, failure by the Bidder to provide an indication of one of the three (3) listed generator manufacturers "defaults" the generator manufacturer to Cummins. Electrique Corporation recognizes this "default" condition as part of the contract documents and is prepared to provide a Cummins manufactured unit to the City of Round Rock, Texas for this project with no change to Electrique Corporation's Bid Proposal. Please note that due to the rather short construction time for this project, Electrique Corporation has a real concern regarding the generator delivery timeframes quoted by Cummins and Caterpillar. Due to this concern Electrique Corporation would like to discuss these delivery issues with all parties involved before a final generator manufacturer is determined. Should you have any questions, need any additional information, or need Electrique Corporation to meet with CDM and/or the City of Round Rock, Texas, please do not hesitate to contact me. Respectfully submitted, Mike Lilly, President Electrique Corporation 710 N. Kings Highway P.O. Box 6004 Texarkana, Texas 75505 (903) 838-6578 FAX (903) 838-9032 LU w rt 00 g LLi !Agenda Iteme\Engineering@004\Water Utility\WTP Pha to DATE: May 6, 2005 SUBJECT: City Council Meeting - May 12, 2005 ITEM: 11.C.2. Consider a resolution authorizing the Mayor to execute a contract with Electrique Corporation for the Water Treatment Plant High Service Pump Generator Project. Department: Water and Wastewater Utilities Staff Person: Tom Clark, Director of Utilities Justification: On April 12, 2005 three bids were received for the Water Treatment Plant (WTP) High Service Pump Generator Project and the low bid of $777,050.00 was from Electrique Corporation. The average bid was $796,728.33. Based on the review of the bids by staff and CDM Engineering, Inc. staff recommends awarding the project to Electrique Corporation. Funding: Cost: $777,050.00 Source of funds: Capital Project Funds (Self -Financed Utility) Outside Resources: Electrique Corporation Background Information: To provide adequate back up power and control functions to operate 3 of the WTP's High Service Pumps to provide 24 mgd of Treatment Capacity during an emergency loss of electrical power. The backup generator will allow us to pump approximately 24 MGD during emergency situations and operate the chlorine facility, WTP Phases 3 & 4 process equipment, and the Mechanical Control Center (MCC). Public Comment: N/A