Loading...
R-05-05-26-12E2 - 5/26/2005RESOLUTION NO. R -05-05-26-12E2 WHEREAS, the City of Round Rock has previously entered into an Agreement for Engineering Services ("Agreement") with Gray-Jansing & Associates, Inc. for design work on the Doublecreek Drive and Forest Creek Drive Project, and WHEREAS, Gray-Jansing & Associates, Inc. has submitted Supplemental Agreement No. 3 to the Agreement for a change in the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 3 with Gray-Jansing & Associates, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 3 to the Agreement with Gray-Jansing & Associates, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 26th day of May, 2005. ATTES ji njth.L. _ %E L V 1 , NY E Mayo City of Round Rock, Texas CHRISTINE R. MARTINEZ, City Secretar ®PFDesktop\::ODMA/WORLDOX/O:/WW%/RESOLUTI/R50526E2.WPD/sc STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 3 TO AGREEMENT FOR ENGINEERING SERVICES FIRM: Gray — Jansing & Associates, Inc. ("Engineer") ADDRESS: 8217 Shoal Creek Blvd., Suite 200, Austin, TX 78757 PROJECT: Doublecreek Drive and Forest Creek Blvd. This Supplemental Agreement No. 3 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Gray — Jansing & Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinafter called the "Agreement", on the 24th day of July, 2003 for the Doublecreek Drive and Forest Creek Blvd Project in the amount of $94,155.90; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 1 on January 8, 2004, to modify the provisions for the scope of services, to modify the Term of the Agreement, and to increase the compensation by $15,475.00 for a total of $109,630.90; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 2 on September 9, 2004, to modify the provisions for the scope of services, to increase the compensation by $15,500.00 for a total of $125,130.90, and to modify the provision for notices to proceed; and WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services, and to increase the compensation by $10,400.00 for a total of $135,530.90, and to modify the provision for notices to proceed; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scope Of Services To Be Performed By Engineer and Exhibit B, Services To Be Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit B. Supplemental Agreement Rev.03/02/04 gray-jansing-dblcrk/frstcrk; TX02DCRK/TX02FCRK; 85688 64836 EXHIBIT "An Il. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $10,400.00 the lump sum amount payable under the Agreement for a total of $135,530.90, as shown by the attached Addendum to Exhibit D. Article 7, Notice to Proceed shall be amended to read as follows: The Engineer shall not proceed with any task listed on Exhibit B until the City has issued a written Notice to Proceed regarding such task. The City shall not be responsible for work performed or costs incurred by Engineer related to any task for which a Notice to Proceed has not been issued. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. GRAY — JANSING & ASSOCIATES, INC. By: —.�>4v.0 -.2sji Date CITY OF ROUND ROCK APPROVED AS TO FORM: By: Nyle Maxwell, Mayor Stephan L. Sheets, City Attorney Date Supplemental Agreement Rev.03/02/04 gray-jansing-dblcrk/frstcrk; TX02DCRK/TX02FCRK; 85688 64836 2 ADDENDUM TO EXHIBIT B Services to be Provided by the Engineer The changes to the scope of this project are as follows: The scope of work to be performed under this supplemental agreement shall be in accordance with the general terms and conditions as outlined in the original agreement dated July 24, 2003. The additional scope of work to be performed by the Engineer will include the following: Item 1 Review existing survey data to design a tie-in to the 16 -inch waterline with plan and profile drawing to connect to new waterline in Rusk Road. Analyze and design additional drainage improvements including curb inlet and storm sewer pipe to accommodate additional intersections. Design two additional street intersections with Forest Creek Drive at Rusk Road and at Paradise Ridge. Prepare plan and profile sheets to establish vertical grades. Provide revised designs to CORR Transportation Department for approval. Assist City Staff in negotiations with Contractor for cost of installation. Prepare and issue contract change order to construction contract. Provide staff for field observation in order to document installation of improvements. Provide additional construction administration services to cover the increased contract scope. ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: The budget for this additional work is estimated to be $10, 400.00. The breakdown of these changes is as follows: Waterline $1,500.00 Rusk Intersection $4,100.00 Paradise Ridge $4,100.00 TOTAL $10.400.00 RUSK RD FOREST CREEK DR DOUBLE CREEK D GATTIS SCHOOL RD DATE: May 20, 2005 SUBJECT: City Council Meeting - May 26, 2005 ITEM: *12.E.2. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 3 to the Agreement for Engineering Services with Gray-Jansing & Associates, Inc. for design work on the Doublecreek Drive and Forest Creek Drive Project. Department: Transportation Services Staff Person: Tom Martin, Director of Transportation Justification: This agreement will allow Gray-Jansing & Associates, Inc., to provide design services incorporating two new street intersections into the Forest Creek Drive improvements, prepare revised drawings for the installation of additional utility and drainage improvements associated with the intersections, prepare and issue change order documents incorporating revised design into the existing construction contract, provide field observation to document installation of waterline, storm sewer improvements and paving and provide project representative to provide field observation to document installation of the additional improvements. Funding: Cost: $10, 400.00 Source of funds: Round Rock Transportation System Development Corporation Outside Resources: Gray-Jansing & Associates, Inc. Background Information: Completion of the arterial Forest Creek Drive will provide a four lane divided roadway, with curb and gutter section and is in accordance with the City's Master Transportation Plan. Public Comment: NA STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 3 TO AGREEMENT FOR ENGINEERING SERVICES FIRM: Gray — Jansing & Associates, Inc. ("Engineer") ADDRESS: 8217 Shoal Creek Blvd., Suite 200, Austin, TX 78757 PROJECT: Doublecreek Drive and Forest Creek Blvd. This Supplemental Agreement No. 3 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Gray — Jansing & Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinafter called the "Agreement", on the 24th day of July, 2003 for the Doublecreek Drive and Forest Creek Blvd Project in the amount of $94,155.90; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 1 on January 8, 2004, to modify the provisions for the scope of services, to modify the Term of the Agreement, and to increase the compensation by $15,475.00 for a total of $109,630.90; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 2 on September 9, 2004, to modify the provisions for the scope of services, to increase the compensation by $15,500.00 for a total of $125,130.90, and to modify the provision for notices to proceed; and WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services, and to increase the compensation by $10,400.00 for a total of $135,530.90, and to modify the provision for notices to proceed; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scope Of Services To Be Performed By Engineer and Exhibit B, Services To Be Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit B. Supplemental Agreement Rev.03/02/04 gray-jansing-dblcrk/frstcrk; TX02DCRK/TX02FCRK; 85688 64836 iP-05-c5-�10-/069 II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $10,400.00 the lump sum amount payable under the Agreement for a total of $135,530.90, as shown by the attached Addendum to Exhibit D. Article 7, Notice to Proceed shall be amended to read as follows: The Engineer shall not proceed with any task listed on Exhibit B until the City has issued a written Notice to Proceed regarding such task. The City shall not be responsible for work performed or costs incurred by Engineer related to any task for which a Notice to Proceed has not been issued. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. GRAY — JANSING & ASSOCIATES, INC. By: Date 5/5/0 7 - Date Supplemental Agreement APPROVED AS TO F I RM: (itvL . 't Stephan1L. Sheets, City Attorney Rev.03/02/04 gray-jansing-dblcrk/frstcrk; TX02DCRK/TX02FCRK; 85688 64836 2 ADDENDUM TO EXHIBIT B Services to be Provided by the Engineer The changes to the scope of this project are as follows: The scope of work to be performed under this supplemental agreement shall be in accordance with the general terms and conditions as outlined in the original agreement dated July 24, 2003. The additional scope of work to be performed by the Engineer will include the following: Item 1 Review existing survey data to design a tie-in to the 16 -inch waterline with plan and profile drawing to connect to new waterline in Rusk Road. Analyze and design additional drainage improvements including curb inlet and storm sewer pipe to accommodate additional intersections. Design two additional street intersections with Forest Creek Drive at Rusk Road and at Paradise Ridge. Prepare plan and profile sheets to establish vertical grades. Provide revised designs to CORR Transportation Department for approval. Assist City Staff in negotiations with Contractor for cost of installation. Prepare and issue contract change order to construction contract. Provide staff for field observation in order to document installation of improvements. Provide additional construction administration services to cover the increased contract scope. ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: The budget for this additional work is estimated to be $10, 400.00. The breakdown of these changes is as follows: Waterline $1,500.00 Rusk Intersection $4, 800.00 Paradise Ridge $4,100.00 TOTAL tin 411411111 REST CREEK DR o 44' is 4 - RUSK RD DOUBLE CREEK D GATTIS SCHOOL RD O 0 ▪ O /�L 0 0 > • L 0 Y 0 0 L 0 0 O L 0 L.L. 0a 0 > L 0 a) O L 0 0 .0 0 0