Loading...
R-05-07-14-11A1 - 7/14/2005RESOLUTION NO. R -05-07-14-11A1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with H. Deck Construction for the Wastewater Collection System Rehabilitation of Three Edwards Aquifer Basins, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with H. Deck Construction for the Wastewater Collection System Rehabilitation of Three Edwards Aquifer Basins, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 14th day of July, 2 y 05. ATTEST /' L' �� City of Round Rock, Texas � ALAA1 me G,e4t.), mgya,e Pe --rem CHRISTINE R. MARTINEZ, City Secrety OPPDesktop\::ODMA/WORLDOX/0:/WDOX/RESOLUTI/R50,14A1.WPD/sc CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Public Works PROJECT: 2003-2004 Wastewater Collection System Rehabilitation ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $1,200,298.00 $0.00 $76,551.00. $76,551.00 CHANGE DA PAGE 1 OF 1 DATE: 06-24-05 CHANGE ORDER NO: 1 JUSTIFICATION: 1 Upsize the 8" sewer line behind Cushing St. to 10" ITEM # DESCRIPTION OF - CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR? WORXING 1 Traffic control EA 1 $500.00 $500.00 2 Trench Safety LF 141 $1.00 $141.00 3 Exploratory Excavation EA 1 $750.00 $750.00 4 Alphalt removal and replacement LF 120 $10.00 $1,200.00 5 Curb/gutter removal and replacment LF 25 $40.00 $1,000.00 6 Tree protection EA 1 $200.00 $200.00 7 Fence replacement LF 60 $30.00 $1,800.00 8 Rock wall removal and replacement LF 30 $50.00 $1,500.00 9 Concrete flume removal and replc. EA 2 $3,750.00 $7,500.00 10 Point repair prior to pipe bursting EA 2 $2,500.00 $5,000.00 11 10" SDR26 6' to 10' deep by open cut LF 241 $50.00 $12,050.00 10.00 12 10" IPS sewer pipe by pipe bursting LF 341 $60.00 $20,460.00 10.00 13 Remove/replace MH 0-6' with epoxy EA 1 $5,000.00 $5,000.00 14 6" service line with lnserta Tee EA 9 $1,550.00 $13,950.00 15 Concrete paving SY 25 $60.00 $1,500.00 16 Seeding/sodding to match existing SY 400 $10.00 $4,000.00 A / TOTAL: $76,551.00 20.00 PREPARED BY: ENGINEER 1-4 6:= cr___ ((xis -F. 6/24/2005 DATE- CONTRACTOR BY:a'L,-.f" TITLE: Suer or UT4L1Tr6 APPROVED: CITY OF ROUND ROCK PERCENT OF ORIGINAL CONTRACT PRICE THIS -CHANGE ORDER:.. PREVIOUS CHANGE ORDER: TOTAL % CHANGE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $76,55100 0 6.38% $1,276,849.00 constco2/rorms61Ik EXHIBIT `A" rehabllllalionl Not to Scale DATE: July 8, 2005 SUBJECT: City Council Meeting - July 14, 2005 ITEM: *11.A.1. Consider a resolution authorizing the Mayor to execute Change Order No. 1 with H. Deck Construction Company for the Wastewater Collection System Rehabilitation of Three Edwards Aquifer Basins. Department: Water and Wastewater Utilities Staff Person: Tom Clark, Director of Water/Wastewater Utilities Justification: The City is required to inspect, repair, and certify that its wastewater collection system is in compliance with the Texas Commission on Environmental Quality's wastewater rules. The elimination of defects reduces inflow and infiltration entering the sewer system, thereby reducing the City's treatment cost to the LCRA and BRA, who own and operate the Brushy Creek Regional Wastewater Treatment Plant. This Change Order is for the addition of rehabilitating an existing wastewater line that has several defects, which are possibly allowing wastewater to exfiltrate into the ground. This line is located downstream and in the same sub -basin that the contractor is currently working (LC14). In addition to correcting the defects and sags in the line, the City is upsizing the line in order to carry additional flows that will be experienced in the future. Because H. Deck Construction has already mobilized their equipment to the City, it is advantageous to the City to have them repair this wastewater line at this time. Funding: Cost: $76,551.00 Source of funds: WW Utility Fund (F260) Outside Resources: RJN Group, Inc. (Engineering Consultant) Background Information: H. Deck Construction's original contract was to rehabilitate defective areas determined from the 2002-2003 Wastewater Collection System Inspection Project in three Edwards Aquifer Basins (LC15-Z, LC16-Z, and CC34-Z) as well as a wastewater line located in a non -Edwards Basin (LC14). The scope of the project included pipe bursting, wastewater line replacement, a 30" bore and encasement, point repairs, and rehabilitation of manholes. Public Comment: N/A DEPARTMENT: Public Works PROJECT: 2003-2004 Wastewater Collection CHANGE ORDER NO: 1 System Rehabilitation ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER PAGE 1 OF 1 DATE: 06-24-05 $1,200,298.00 $0.00 $76,551.00. $76,551.00 CHANGE DATA JUSTIFICATION: 1 Ups¢e the 8" sewer line behind Cushing St. to 10" PREPARED BY: BY: ENGINEER H Co.us t CONTRACTOR 6/24/2005 DATE TITLE: ZSupr or U-(,ltTtE PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: $76,651,00. PREVIOUS CHANGE ORDER: TOTAL % CHANGE: 6.38% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $1,276,849.00 0 APPROVED: -R-1-d5 OF ROUND ROCK R� N fflcJ eA�� mAycR. PE0-160-1 1e -05-07-R4 IIA! constco2/forrns6Ak ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 1 Traffic control EA 1 $500.00 $500.00 2 Trench Safety LF 141 $1.00 $141.00 3 Exploratory Excavation EA 1 $750.00 $750.00 4 Alphalt removal and replacement LF 120 $10.00 $1,200.00 5 Curb/gutter removal and replacment LF 25 $40.00 $1,000.00 6 Tree protection EA 1 $200.00 $200.00 7 Fence replacement LF 60 $30.00 $1,800.00 8 Rock wall removal and replacement LF 30 $50.00 $1,500.00 9 Concrete flume removal and replc. EA 2 $3,750.00 $7,500.00 10 Point repair prior to pipe bursting EA 2 $2,500.00 $5,000.00 11 10" SDR26 6' to 10' deep by open cut LF 241 $50.00 $12,050.00 10.00 12 10" IPS sewer pipe by pipe bursting LF 341 $60.00 $20,460.00 10.00 13 Remove/replace MH 0-6' with epoxy EA 1 $5,000.00 $5,000.00 14 6" service line with Inserta Tee EA 9 $1,550.00 $13,950.00 15 Concrete paving SY 25 $60.00 $1,500.00 16 Seeding/sodding to match existing SY 400 $10.00 $4,000.00 TOTAL: $76,551.00 20.00 PREPARED BY: BY: ENGINEER H Co.us t CONTRACTOR 6/24/2005 DATE TITLE: ZSupr or U-(,ltTtE PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: $76,651,00. PREVIOUS CHANGE ORDER: TOTAL % CHANGE: 6.38% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $1,276,849.00 0 APPROVED: -R-1-d5 OF ROUND ROCK R� N fflcJ eA�� mAycR. PE0-160-1 1e -05-07-R4 IIA! constco2/forrns6Ak