R-05-07-14-11G3 - 7/14/2005RESOLUTION NO. R -05-07-14-11G3 WHEREAS, the City of Round Rock has duly advertised for bids for the A.W. Grimes Boulevard, Phase II, from Lake Creek to US 79 Project, and WHEREAS, RGM Constructors, L.P. has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of RGM Constructors, L.P., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with RGM Constructors, L.P. for the A.W. Grimes Boulevard, Phase II, from Lake Creek to US 79 Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as .required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 14th day of July, 2005. AT ST: City of Round Rock, Texas PLAN IrieG,eRu), MRyoL. PRO -T ri CHRISTINE R. MARTINEZ, City Secret @PFDesktOp\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R50714G3. WPD/sc y June 27, 2005 Subject: A. W. Grimes Phase II Dear Mr. Maxwell Bids were opened in Round Rock Council Chambers on June 21, 2005, for construction of A. W. Grimes Phase II. A total of five bids were received. See below for a complete bid tabulation. Contractor RGM Constructors Total $4,978,357.76 Based on the Engineer's review and the staff's review of the bids received, staff recommends that the Contract for construction of A. W. Grimes Phase II, be awarded to RGM Constructors, L.P., in the bid amount of $4,978,357.76. Sincerely, 3-1( Bill Stablein Traffic Engineering Assoc. RODRIGUP'Z TRAh P TATIIOON GROUP CONSULTING ENGINEERS June 24, 2005 Mr. Tom Martin, P.E. Transportation Director Department of Public Works City of Round Rock 212 Commerce Cove Round Rock, Texas 78664 RE: A.W. Grimes Boulevard (Phase II) Dear Mr. Martin: On Tuesday, June 21, 2005, Rodriguez Transportation Group, Inc. (RTG) in the City of Round Rock Council chambers accepted completed sealed construction bid documents for the above referenced project. The sealed bids were opened, read aloud and documented. The attendees were informed that RTG would review the bid documents for accuracy and completeness and make a recommendation to the City of Round Rock accordingly. The City of Round Rock would then notify the successful candidate after a city council vote. RTG has reviewed the submitted bid documents. Of the five bids received, RGM Constructors, L.P. presented the lowest bid of $4,978,357.76. The pre-bid documents submitted by RGM Constructors, L.P. were found to be complete and accurate. We therefore respectfully recommend them as the prime contractor for this construction project. We are returning all of the original contractor pre-bid documents and corresponding bid bond documents. It is our understanding that the City of Round Rock will retum these bid bond documents. In addition, we are enclosing the five bids that have been transferred to the City of Round Rock "Bid Tabs" form. If you have any questions or require additional information please advise. Sincerely, RODRIGUEZ TRANSPORTAXION GROUP, INC. rock E. Miller, P.E. Project Engineer Enclosures • 14900 FM 529 • SUITE 100 • HOUSTON, TEXAS 77095 • 281.855-8680 e FAX 281.855-8687 .......... all -'y A.W. Grimes Phase 11 From U .S. 79 to Lake Creek DATE: July 8, 2005 SUBJECT: City Council Meeting - July 14, 2005 ITEM: 11.G.3. Consider a resolution authorizing the Mayor to execute a contract with RGM Constructors, L.P. for the construction of A.W Grimes Boulevard Phase II from Lake Creek to US 79. Department: Transportation Services Staff Person: Tom Martin, Director of Transportation Services Justification: This project will construct a new Arterial Roadway from Lake Creek to US 79 and complete the Arterial Roadway from SH 45 to US 79. Funding: Cost: $ 4, 978,357.76 Source of funds: 4B Corporation (1/2 cent Sales Tax) Self -Financed Utility Fund Outside Resources: Background Information: RGM Constructors Rodriguez Transportation Group HDR Engineering This project is the second Phase of the A. W. Grimes improvements. Phase I constructed a six - lane section from SH 45 to Lake Creek. As part of the second phase, UPRR will reconstruct their bridge over Brushy Creek to accommodate the City's underpass on the Railroad. Public Comment: N/A