CM-2014-509 - 9/12/2014City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity AdjustmentfChange Order No. 1 with Prota Construction, Inc. for the Chandler Creek 1 - Upper Phase Wastewater Line Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 9/12/2014 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $296,615.00 Indexes: Self -Financed Wastewater Construction Attachments: QA-CO#1_Prota_CC1U_CM9.12.14, MAP_ChandlerCreekl Upper_CC7.24.14 Department: Utilities and Environmental Services Text of Legislative File CM -2014-509 In July of 2014, the City Council approved a construction contract with Prota Construction, Inc. for the Chandler Creek 1 - Upper Phase Wastewater Line Project in the amount of $1,301,969. The Chandler Creek 1 - Wastewater Interceptor consists of three phases. The first phase was built with the Legends Village Section 2 -Phase 4 subdivision and was oversized with participation by Round Rock to ensure adequate capacity to accommodate future growth to the north. The second phase, CC - 1 L, was recently completed and tied the Legends Village portion south to the existing Chandler Creek Wastewater Interceptor. This third phase, Chandler Creek i- Upper Phase (CC -1 U) Wastewater Line includes 6,800 Linear Feet of 18 inch wastewater line and necessary appurtenances and will provide peak flow wastewater capacity for the Avery Centre East and south, the Round Rock ISD property at the northeast corner of Old Settlers Blvd. and A.W. Grimes Boulevard, and the area north of Legends Village and tie into the existing wastewater infrastructure. Only Phase I of the project will be constructed at this time. Phase II will be deleted from the contract until which time development north of Old Settlers Blvd. is in place and will require service via Phase II construction of the project. One additional manhole will be added to the north end of Phase I construction to increase the wastewater line deflection angle and make for smoother flow. This Quantity Adjustment/Change Order No. 1 will lower the contract amount from $1,301,969 to $1,005,354. Cir, of Rountl Rock Page 1 PtlnMd on &11/201/ AwnW Mm Summary Conflnu (CM,2014500) Staff recommends approval. CHy oI Round Rock P,e 2 PnnoW on W11M14 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIUCITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: Utittles& Environmental services Project Name: Chandler creek t. upper Phaaweelewnir cine Project Mgr/Resource: Je0 Bell ContractorNendor: Pmts Conslmaion, Inc. r—Icouncil Action: ORDINANCE RESOLUTION QCity Manager Approval CMA Wording Consider executing Quantity Adjustment/Change Order No, t with Prole Construction, Inc. for the Chandler Creek 7 - Upper Phase Wastewater Line Project. Attorney Approval Attorney Date yIii;-'Izili O:\wdox\SCClnts\0199\1413701MISC\00310422.XLS Updated 813108 Contract Quantity Adjustment/Change Order re,, osnx Department: Utilities & Environmental Services Project Chandler Creek 1 - Upper Phase Name: Wastewater Line City Project ID Number Justification Date: 8/25/14 Change Order/Quantity Adjustment No. 1 Page I of 3 Only Phase I of the project will be constructed at this time. Phase 11 will be deleted from contract until which time development north of Old Settlers Blvd, is in place and will require service via Phase II construction of the project. One additional whole will be added to the north end of Phase I construction to increase the wastewater line deflection angle and make for smoother flow. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Orders): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Ordens)j: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Scott Wetzel. Vice 0.00 0.00 olinglammommm $1,005,354.00 -$296,615.00 240 days 0 days -60 days 0 180 days Signature Printed Now, Title, Company pate I City Project , 9.z 'I (4 Manager: Jeff Bell / Project Manager . atur Printed Name, Title_ Date Mayor/City Manager:4do n - (��Z M LL�AIfy i �.l�L Signature Printed Name, Title I L t I a Date CM -2014-509 Page 2 of 3 Contract Quantity Adjustment/Change Order �, ocnz Project Name: Chandler Creek 1 - Upper Phase Wastewater Line Quan. Adj./Change Order No.: 1 Page 3 of 3 Contract Quantity Adjustment/Change Order m, anz Project Name: Chandler Creek 1- Upper Phase Wastewater Line Quan. Adj./Change Order No.: 1 Quantity Adjustment Data Bid Item If 35 Item Description Bonding Unit LS Qty. -1 Unit Price $17,500.00 Amount -$17,500.00 Contract Time Adjustment 36 Baring & Grubbingt, Brush & Tree Removal LS -1 $800.00 -$800.00 37 Seeding, Fertilizing & Mulching AC -3.59 $2,300.00 -$8,257.00 38 Apply for, Install and Maintain SWPPP IS -1 $1.00 -$1.00 39 Testing, Video & Cleaning Services LS -1 $3,400. -$3,400.00 40 Install Remove Temporary Orange Safety Fence LS -1 $701.00 -$701.00 41 Trench Excavation Safety System LF -1926 $2.00 -$3,852.00 42 Install Manhole Delineator Posts with MH Signs EA -4 $186.00 -$744.00 43 Install Manhole Bollards EA -4 $400.00 -$1,600.00 44 12" PVC SDR -26 Stub -out LF -20 $1,600.00 -$32,000.00 45 1 can -out Assembly EA 1,5 - 3,000.00 46 18" PVC SDR 26 (12' to 16' deep) LF -729 $90.00 -$65,610.00 47 18 PVC SDR -26 16 to 20 p) LF -681 $95.00 -$64,695.00 48 18" PVC SDR -26 20 to 24' deep) LF -516 $100.00 -$51,600.00 49 Standard Manhole, 41 -foot dia. Wit Bolted Lid (depth :58') EA -3 $4,500.00 -$13,500.00 50 Drop 1 Manhole, 4 -foot dia. Wit Bolted Lid (depth <_B') EA -1 $5,000.00 -$5,000.00 51 Additional 4 -foot dia. Manhole Extra Depth (depth >8') VF -57.85 $300.00 -$17,355.00 52 Manhole Vent Assembly EA -2 $3,500.00 -$7,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00