CM-2014-510 - 9/12/2014City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with TraC-N-Trot, Inc. for the RTU Install & Enhancement Project - Phase 2. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 9/12/2014 Dept Director: Michael Trans, Director of Utilities and Environmental Services Cost: $5,434.00 Indexes: Self -Financed Water Construction Attachments: QA-CO#1_TracNTrol_RTUPh2_CM9.12.14, MAP_RTUPhase2 CC4.24.14 Department: Utilities and Environmental Services Text of Legislative File CM -2014-510 In April of 2014, the City Council approved a construction contract with TraC-N-Trot, Inc. for the RTU Install & Enhancement Project - Phase 2 in the amount of $101,302. The City currently utilizes a number of Remote Terminal Units (RTUs) that are located at every pump station, storage tank, and lift station site in the Utility system. These RTUs allow the City to monitortank levels, pump run times, etc. Phase 1 of this project replaced an existing obsolete Front End Processor, and provided the City with thirty-four RTUs and radios to replace thirty-four existing RTUs and radios. This will improve the City's software development/run time environments to increase data capabilities by upgrading the radio system from 1200 baud to Ethernet. Upgrading the Water Supervisory Control and Data Acquisition system will ensure a safer and more up to date communication system in managing our Water Distribution system and Wastewater Collection system. Phase 2 includes the installation of the RTUs and radios, a Line of Sight investigation, and a Bird Watt test to ensure conductivity in the wiring between the antennae and the RTUs. During the course of testing, it became clear that there was a need for programming of the Programmable Logic Controllers (PLC's), and the addition of the Bird Watt lest to nine other sites based on the prior test results. The City Utility Staff recommends the City Manager approve Quantity Adjustment/Change Order No. 1 for the amount of $5,434 which will change the contract total to $106,736. CiyofRo dRack Papal pdnWon L11WF4 A9 da IMM summary Contin—frCM-101a510) Staff recommends approval. Ciryo/Found Rock Pape 2 Pdnred on L111 4 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: Uliilues s Errviromnamat Services Project Name: RTU Miss a Ennenm—nt Nahum - Phaaez Project Mgr/Resource: aerc Hell ConlractorNendor: TmC.N-Trot, Im. Council Action: ORDINANCE F-1 RESOLUTION xx City Manager Approval Attorney CMA Wording Consider executing Quantity AdjustmentlChange Order No. i with TeC-N-Trol. Inc. for the RTU Install 8 Enhancement Project - Phase 2. Date O:\wdoxlSCCintsl019911412\MISC\00310432.XLS Updated 6/3108 Contract Quantity Adjustment/Change Order Department: Utilities & Environmental Services Project Name: RTU Install & Enhancement - Phase 2 City Project ID Number RTUP2 Date: 9/2/14 Change Order/Quantlty Adjustment No. 1 Pege 1 .1`3 Justification Assisted Brandon Pritchett with PLC programming to reflect the new RTU rads communications. Also pertrom Bird Watt test on the remaining nine (9) water sites as directed by the City. SUMMARY Ongmal Contract Pnce: Previous Quantity Adjustmends): This Quantity Adjustment Total Quantity Adjustment(s): Total Contact Pace with Quannty Adjustment(s): Previous Change Order(s): This Orange Order: Total Change Order(s) To Date: Adjusted Contact Pnce (Original Contract Price Plus Quantity Adjustrnent(s) Rus Charge Ordeds)]: Difference between Ongmal and Adjusted Contract Rices: $4,300.00 0.04 $4,300.00 0.04 $106,736.00 $5,434.00 Ongmal Contract Time: 180 Time Ad)ustrne a Cy previous Quan. Ad)./Change Order: 0 Time Adjustment W Nis Quan. Adj./Change Order: 0 New Contract Tone: 0 180 Exec. Contractor `'� ' h`—� Steve Brown, Exec. Vice -Resident, TraC—n-tro, Inc. 9/2/14 SignatuFq Printed Name, Title, Company Date City Project \ Maraaec / rI lnrf Nnll I PmiM Mariano 1 2 CM -2014510 Page 2 ul J Contract Quantity Adjustment/Change Order m.owzz Project Name: RTU Install & Enhancement - Phase 2 Quan. Adj./Change Order No.: I Change Order Data Np3of3 Contract Quantity Adjustment/Change Order oma Project Name: RTU Install & Enhamen*nt - Phase 2 Quan. Adj./Change Order No.: 1 Ouantltr Adjustment Data