Loading...
CM-2014-511 - 9/12/2014City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 1 with Klotz Associates, Inc. for the Cypress Boulevard Reconstruction Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 9/12/2014 Dept Director: Gary D. Huddler, Transportation Director Cost: $24,930.72 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: IAF - SC#1 w- Klotz Associates for Cypress Boulevard Reconstruction (00310470xA08FB), SC#1 w -Klotz Associates - Cypress Blvd Reconstruction (00310431 xA08F8) Department: Transportation Department Text of Legislative File CM -2014-511 This Supplemental Agreement No. 1 will include engineering services for the schematic design for the extension of Cypress Boulevard to Luther Peterson. Also, included in this supplemental agreement is additional surveying, utility design and the submittal of the SCS permit and construction phase. The total for this supplemental agreement will be $24,930.72. Staff recommends approval C1tycfF and Rock P.'.I PtlnMdo &111n14 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: Transportation Project Name: Cypress Boulovard Reconstruction Project Mgr/Resource: e',u steblein ContraclorNendor. Kloia nssodeles, mc. Council Action: ORDINANCE RESOLUTION Agenda Wording City Manager Approval ffAltorney CMA Wording Consider executing Supplemental Contract No. I with Klotz Associates, Inc. for the Cypress Boalevarcl Recunstmction Project. 0:\wdox\SCClnts\0199\1365\MISC\00310470.XLS Updated 6/3108 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: Klotz Associates, Inc. ("Engineer") ADDRESS: 901 South Mopae Expressway Building V, Suite 220, Austin, TX 78746 PROJECT: Cypress Boulevard Reconstruction This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Klotz Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract', on the 28th day of March, 2013 for the Cypress Boulevard Reconstruction Project in the amount of $212,156.45; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $24,930.72 to a total of $237,087.17; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 1, City Services and Exhibit A, City Services shall be amended as set forth in the attached Addendum To Exhibit A. Il. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $24,930.72 the lump sum amount payable under the Contract for a total of $237,087.17, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Conanct Rev.12/01/08 0199.1365;00310431 84275 CM -2014-511 KLOTZ ASSOCIATES, INC. By: RIGA �Cc ZA1`8 A'R''I��Pq� Scc �IZ�SipL f �i �S/Zo r yL Date CITY ROUND RO K / � *APPEDTO ' ORM: , -&WkvIZ -N'G I-2 ss{- }-fN/"CV- ets, City Attorney 9 -12 - Date / J Snppkn,manl Conaw Rev.12/01/08 0199.1365;00310431 84275 ADDENDUM TO EXHIBIT A City Services PROJECT DESCRIPTION Existing Facility The existing road section consists of a median divided four -lane section of asphalt concrete pavement with closed storm sewer drainage. The existing right-of-way is approximately 80' wide. Proposed Facility, The proposed roadway will be a new location median divided four -lane section with 100' of Right of Way (ROW). The proposed road will include the improvement of the intersections of Cypress Cove and Sunrise Road at Eagles Nest Street. The drainage will be closed storm sewer drainage. The project will include the realignment of a portion of existing Cypress Boulevard and the demolition of the existing roadway that parallels the new location roadway. The project will be let for construction by the CITY. In conjunction with the Cypress Boulevard Reconstruction project, a schematic layout will be prepared for the extension of Cypress Boulevard from Eagles Nest Street to Luther Peterson. In conjunction with the services to be provided by the ENGINEER, as described in Exhibit B, the CITY shall provide the following, as available: L ROUTE AND DESIGN STUDIES 1. Provide background information for design including: a. Proposed typical sections for all roadways (including cross streets) b. Proposed pavement sections/design if available II. RIGHT-OF-WAY DATA 1. The CITY shall provide previous dedicated Rights -of -Way (ROW) parcel sketches, field notes for existing ROW (if available). 2. The CITY shall provide existing plans for CITY owned utilities within the project limits. III. FIELD SURVEYING 1. Surveying - The CITY shall provide all existing surveys (if available) available to the ENGINEER. IV. ROADWAY DESIGN CONTROLS 1. Estimate and Quantity Sheets and General Notes - The CITY will supply current specification and general notes if any for review by the ENGINEER. The ENGINEER will incorporate into the PS&E CITY specifications and general notes, as applicable. V. MISCELLANEOUS 1. Agreements — With direction and coordination provided by the CITY, the ENGINEER shall be responsible for securing necessary agreements pertaining to the utilities and traffic signals as necessary. 2. CITY shall provide copies of appropriate and applicable Standard sheets. 3. CITY shall relay approvals for local, regional, state and federal agencies and provide assistance, as necessary, to obtain necessary data, information, and approvals from the various agencies. 4. CITY shall provide reviews according to the following design plan review schedule: PLAN REVIEW TURN -AROUND TIMES Final PS&E Review: 10 Business Days Schematic Layout — Preliminvy Review: 10 Business Days Schematic Layout — Final Review: 10 Business Days ADDENDUM TO EXHIBIT B Engineering Services PROJECT STATEMENT Cypress Boulevard is a project being developed by the City of Round Rock (the "CITY"). PROJECT DESCRIPTION Existing Facility The existing road section consists of a median divided four -lane section of asphalt concrete pavement with closed storrii sewer drainage. The existing right-of-way is approximately 80' wide. Proposed Facility The proposed roadway will be a new location median divided four -lane section with 100' of Right of Way (ROW). The proposed road will include the improvement of the intersections of Cypress Cove and Sunrise Road at Eagles Nest Street. The drainage will be closed storm sewer drainage. The project will include the realignment of a portion of existing Cypress Boulevard and the demolition of the existing roadway that parallels the new location roadway. The project will be let for construction by the CITY. In conjunction with the Cypress Boulevard Reconstruction project, a schematic layout will be prepared for the extension of Cypress Boulevard from Eagles Nest Street to Luther Peterson. The services listed below are in addition to the approved scope of services defined in the original contract executed on March 28, 2013 for the Cypress Boulevard Reconstruction Project. A. Design Schematic. The ENGINEER will develop a schematic layout (1" = 100' roll plot) using the construction plans (provided by the CITY), as well as utilizing the approved roadway design criteria. The schematic layout for the extension of Cypress Boulevard to Luther Peterson will include the basic information necessary for the proper review and evaluation of the proposed improvements. The basic information needed on the schematic layout is as follows: 1) General project information including project limits, design speed, and functional classification 2) Tile location of roadways 3) Tentative right of way limits 4) Culverts 5) The geometries (pavement cross slope, lane and shoulder widths) of the typical sections of proposed highway roadway and crossroads 6) Direction of traffic flow on all roadway lanes 7) CITY aerial for background information 8) Sidewalks B. Probable Cost of Construction. The ENGINEER will develop a probable cost of construction (one estimate during schematic layout development) utilizing the approved roadway design criteria and the Average Low Bid Unit Prices for Construction located on the TxDOT website or other cost information provided by the CITY. RIGHT-OF-WAY A. ROW Acquisition Services. The surveyor will utilize established control (previous work on project). The values will be relative to NAD 83 Texas State Plane Coordinates, Central Zone 4203 (scaled to surface values) based on the CORR GPS Control Network. Vertical datum will be GPS Orthometric heights. The surveyor will perform sufficient research of property records from various sources to analyze and develop an exhibit of the record ROW and property configurations for the affected tracts. The surveyor will perform sufficient field work to recover property corners and highway monuments to aid in the analysis and reconstruction of the tracts where parcels will be acquired Final deliverables will be individual parcel plats with metes and bounds descriptions. The parcel plats include 4 (four) additional parcel surveys for one reversion tract (Aim Drive) and three easements for the project. B. Right -of -Way Coordination. The ENGINEER shall be responsible for the review of surveying and right-of-way pin location(s) and schematic review from surveyor. This will include the surveying of existing ROW pins or markers within the project. The identified ROW will be shown on the schematic. UyY1�Y0'Uo�Y(eL`� All design criteria, standards and specifications will use the CITY DACS Manuals. A. Plan Preparation. The ENGINEER shall prepare additional utility plan sheets for the proposed improvements. This scope of services and the corresponding cost proposal are based on the ENGINEER preparing additional plans to construct wastewater plans. The plans shall generally include the following sheets: 1) Additional Quantity Sheets 2) Wastewater Utility Plan & Profile 3) Wastewater Utility Standards & Details B. Sanitary Collection System (SCS). TCEQ Coordination to establish Sanitary Collection System (SCS) documentation requirements for the Edwards Aquifer Recharge Zone (EARZ). Plans will be completed and designed as required. MISCELLANEOUS A. Compute and Tabulate Quantities. The ENGINEER shall compute quantities that are required fin the wastewater utility pay items, and those quantities identified by the CITY as necessary for inclusion for contractor's information only. Quantities shall be shown in the plan sheets and the project manual bid form. B. Specifications and General Notes. The CITY shall furnish an electronic listing of the current general notes, standard specifications, and special specifications that will be utilized for the project. The ENGINEER will prepare any special specifications specifically regarding the wastewater utilities and will work with the CITY to identify the applicable general notes. C. Submittals. ENGINEER shall submit an additional PS&E package for review to the CITY that includes the wastewater utility information. Three sets of plans shall be submitted for review. Upon approval by the CITY, the ENGINEER shall submit one final set signed and sealed by a registered professional ENGINEER. The ENGINEER will coordinate with the CITY to complete the project. The ENGINEER shall conduct regular coordination meetings with the CITY, ATMOS Energy and TCEQ for review and approval of the wastewater utilities. The ENGINEER shall prepare monthly invoices, progress reports, and updated schedules. The ENGINEER shall implement a QA/QC program throughout the project and will provide docunrentatior of QC reviews upon request. welm V mum 1 1) Schematic layout on Roll Plot at I" = 100' 2) Preliminary Probable Cost of Construction (one estimate this task) RIGHT -OR -WAY and SURVEYING 3) Exhibit of record ROW and property configurations of affected properties 4) Metes and bounds for I (one) reversion tract and 3 (three) easements UTILITY DESIGN 1) Sanitary Collection System (SCS) report for TCEQ approval CONSTRUCTION PLANS (complete) 1) One additional PS&E package detailing lire wastewater utilities including review copies (three each) on 11" x 17" sheets 2) CITY DACS will be utilized for construction plans 3) ENGINEER'S Estimated Probable Cost of Construction stall be updated to include the wastewater utilities. 4) Updated bid documents including the wastewater utility information. ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page EXHIBIT C Work Schedule Project Schedule 1014 I laM I My I AMA I k umbar I Got bar Desi n WRsonter U011ty Drawings UUlity[oordinatlan SCSCalcolatlnns SCS Report Misc-Spas/Eslirmta Final PSUPackage SebmlWon Approvsh TCEQ-SCS CORR Route & Design Prel[Wnary Schaflc Final Sehamaec Sobm.s ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page EXHIBIT D FEE SCHEDULE Cypress Boulevard Reconstruction - Supplemental City of Round Rock DESCRIPTION KLOTZ ASSOCIATES LOCHNER INLAND TOTAL COSTS BY FC ROUTE AND DESIGN STUDIES $5,000.00 $5,000.00 SURYEYANDPHOTGORAMMEIRY $8,200.00 $8,200.00 UTILITY DESIGN $6,461.47 $6,461.47 MISCELLANEOUS (ROADWAY) $1,775.00 $1,775.00 PROIECTMANAGEMENT $925.00 52,045.20 1 $2,970.20 DIRECTEXPENSES $350.00 $174.04 $574.04 LABOR EXPENSES SUBTOTAL $8,050.00 58,680.72 $8,200.00 $24,930.72 Cypress Boulevard - City of Round Rock MOM Page 1 of 1 Exhibit D jv � N K q I a n N Q O N W ••�yq��mf, NM OjN yNj' M m Q Y{ b G 124- N N� w o Q Q a m' Q o 08 g c p 9A of S F a w QQ m N NOIU N M m b N Q N N 12 N N y � i c . � m ,mmm r=-am ���