Loading...
R-05-11-22-9E1 - 11/22/2005RESOLUTION NO. R -05-11-22-9E1 WHEREAS, the City of Round Rock has duly advertised for bids for the St. Williams Loop Park Improvement Project, and WHEREAS, the Council has determined that all bids received should be rejected and the project should be re -bid, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That all bids received for the St. Williams Loop Park Improvement Project are hereby rejected and the project should be re -bid. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of November, 2005. ATTEST: CHRISTINE R. MARTINEZ, City Secre @PFDesktop\::ODMA/WORLDOX/O:/wdox/RESOLUTI/R51122E1.WPD/sc ,- NY SEL , 0 . yor City of Round Rock, Texas 10/25/2005 ce) 011 1.*0 TABULATION (512) 218-5540 5 0 0 rt: 0 0 4 0 0 0 G. Creek Construction S&G Contracting Inc. Bid Bond? YES Bid Bond? YES Bid Bond? NO Bid Bond? NO E,... cr 0 L) CD CD CS 00 CD CD CS 4s CD CD CS .,9- ,e.s C) CD CS ,E,s CD CD (5 CD CD c5 4s CD CD (5 4.9- CD CD c5 4,s, CD CD (5 4,-> CD CD (5 49- CD CD G.s CD CD 4s CD CD 00 CD CD CD CD 0000 CD CD . _ ....)._. .... CD 4. - . . ... NOBID 4 c) cr c) $0.00 1 $0.00 1 4.s .69. $0.00 1 $0.00 1 64 o CD 00 69 CD CD 00 $0.00 1 $0.00 1 69 CD CD 69. 69. CD CD 69 69 CD CD 69 69 CD CD 69 69 CD CD 69. 69 CD CD 69 69 CD CD 69 69. CD CD 69 69 CD CD 69 - - .... .1. -00 - - .... 4, op - 69 1 1 NO BID 0 CD 69 o CD 69. :. Z ,, 00 C) CD CD CS v CD CD CS 00 CD C). CD 00 CD CD CS 00 CD CD CS v). CD CD CS vi CD CD CS 00 CD CD . CD 00 CD CD . CD i,s CD CD . CD ,v)- CD CD . CD ,,s CD CD . CD 00 CD CD . CD 00 CD CD . CD 00 CD CD . CD 00 $2, 746• 25 1 $0.00 .... ... .... .... er . - 410 .. 40 • CD CD (D 00 0 c-.: 00rn $34,312.29 c5 0 EA (5 0 06 r-, c,9- CD o0 4--; (-1 v) --EA- CD CD 0 oo CD kt-) 4 --. 00 CD VP r--: 00 tr) CD CD .4-; Ch ---, CD CD v.-; ,f cr) 0000 kr) r- ---, C"1 7r ,f c:5 00 cN --, -, ',1- cl 0 00 O' (C) t---, 00 .. ... Ch r - r -1- 00 •::: • ,./.0 0,4 ,-. Q (r) 00 I 00.89L'I$ 00-00S`C$ ‹) C\i Ee')' (5 6 ,0 00 69. Cr; N -69. 6 ,--, EA $3,000.00 1 $195.00 1 (5 C'i ,--.-, 69 CD CD 6 kr) kri 69 (P; CN 69 CD CD c5 N ,1:' 69. -. (:;' 69 CD CD 0O !.D C\i' EA ,, C)'; CD kr c- VD 771", c00 69 71- 00 .. 40 40Q • ... 00 Ar • (5 CD (2) CD 00 • E. ci.) Cl% CD 6 CD CD kr) 4 N C' CD CD 6 CD 06 'V) CD CD 6 00 c,F 69 CD kr) cl ,---, .-. .E.A. CD CD cc; N cn -EA CD CD ,..5 EA ... .... .. - - mo rl - CD (-) CD Ge) 69 CD 00 EA 4 i',i • c) A. CD CD . c5 CD Q6 ,fr CD CD . 6 kr cei ,EA CD kr) . -, 00 $8,000.00 1 $24.00 CD kr) N 00 1 00-000`E$ CD CD CS 69 CD CD 06 00 CD CD (5 CA 64 CD ,A Cl 69 CD CD 4 --, 69 CD CD oo 69 ... .. .... •• -- .... .. .... -00 CD Li-) CONTRACT: St. Williams Loop Pavilion Restoration Project LOCATION : PARD Offices DATE: 10-25-05 1 AppRox ; ITEM UNIT 1 QTY. N ... 12 -Stabilized Constructuion Entrance E.A.11 11 13 -Silt Fence 1L.F. 1 483 14 -Unclassified Grading L.S. 1 154' wide Concrete Sidewalk 1L.F. 1 951 6-Removal/Disposal of exsiting roof shingles 1S.F. 5651 7 -Replacement of rotted plywood decking L.S.11 18 -Instal 26 gauge aluminum roof S.F.!565] 19-1nstall tounge and groove finish planks 1S.F. 565] 10 -Demo is -1 remove porous imestone at S.F. 108.4 windows, front entrance, rear windows, replace] lwith matching stone 111 -Remove ETEZT-r stone at fireplace and 1S.F. 27 -.... (1) Q 112 -Furnish and install limestone patio stone S.F.!452 113 -Repair existing interior plaster walls 1S.F. 325 t. ugustine oe a istur e areas . . Total Base Bid W/ Add. Alternate 1 -Small Park Sign Base with Flagstone cap/inla E.A. J 1 .2-30"x40" Cast Stone Sign E.A. 1 1 ......... ...._..... TOTAL BASE BID: TOTAL BASE BID W/ ADD. ALTERNATE: 5 0 0 rt: 0 0 4 0 0 0 DATE: November 17, 2005 SUBJECT: City Council Meeting - November 22, 2005 ITEM: *9.E.1. Consider a resolution rejecting all bids for the St. Williams Loop Park Improvement Project. Department: Parks and Recreation Department Staff Person: Rick Akins, Parks & Recreation Director Justification: The St. Williams Loop Park Improvement Project was competitively bid in October. Only two bids were received and both were over the project construction budget. Staff is uncomfortable with the number of bids and can not identify any potential funding to reach the necessary budget. The project scope will be revised to get it within budget and the Job Order Contract Process will be used. Funding: $18,000.00 Cost: N/A Source of funds: General Capital Improvement - 2001 GO Bond Outside Resources: N/A Back ground Information: The St. Williams Loop Park Improvement Project involves minor renovations and additions to the existing pavilion structure. These improvements are masonry work, roofing, flagstone paving, a sidewalk, and the addition of a park sign. Public Comment: N/A