Loading...
R-05-02-10-12A1 - 2/10/2005RESOLUTION NO. R -05-02-10-12A1 WHEREAS, the City of Round Rock has duly advertised for bids for the Country Aire Drive Sidewalk Project (CDBG Program), and WHEREAS, Manley Contracting has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Manley Contracting, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Manley Contracting for the Country Aire Drive Sidewalk Project (CDBG Program). The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 10th day of February, 2005. AT�1E T : en/i L', Mayor City of Round Rock, Texas CHRISTINE R. MARTINEZ, City Secretary @PFDesktop\::ODMA/WORLDOX/O;/WDOX/RESOLUTI/R50210A1.WP0/so CA O U :00 0 o�Olo N .--. Oa" e-.. fA 0 ' .- VI 0 0 VI o o O N • C y . a LOW BID Contractor: ORO Mex. Construction Co. Contractor: Myers Construction Addendum Acknowledged? Yes Addendum Acknowledged? Yes Safety Experience? Yes Safety Experience? Yes IBM Bond? 5% Bid Bond? 5% 11 $3,500.001 $3,500.00 $3,843.001 $3,543.VV U i4 *7Pr C O O O Oi O O; o » O .I7 O N" 59 THE CITY OF ROUND ROCK ENGINEERING & DEVELOPMENT SERVICES DEPARTMENT 2008 Enterprise Dr. Round Rock, Texas. 78664 (512) 218-5555 BID TABULATION CONTRACT : Country Aire Drive Sidewalk Proiect 1 ti Y H ' cn O V O 00 O � vl N N — 00.00o' $ 00,000`z$ np M Go, 69 'z rq' ti a o `Oroo ca ,n o 0 c, c:, 6969 � X I a d O %O N N .-+ u)�wa (Four inch thick concrete sidewalk co 3 0 tl N w O C4an as V b O N yam, U .. U y T TOTAL BASE BID (Items 1 thru 4) 4t rr N M ril0 0 O. M 41, Cr) 64 0 0 to T ,--i 64 0 0 O 41 N 64 0 0 O N .7' 64 < a a C G 6 1 $55,656.00 �E,OF .g 1 j*; % )� * * }/ rRUTH S. HABERMAN 0 93602 4 i itl'Prepared and certified by: GGA.. _ [(24, ` P Muniz Concrete & Acknowledged? ;rience? U BIDS EI! 2TMENT BY: DATE: TABULATION SHEET o 'f o 0 O 0 O U 664 64 N N 0 N P.i 64 6 Contractor: A. Deck Construction Co. Addendum Acknowledged? Yes Safety Experience? Yes Bid Bond? 5% O 0 0 0 O 0t O tO O O O 00 O- t l� O 00 O O •-:1‘o" M N .--, 64 N 64 64 64 'ao CR 0 4i = 0 0 0 0 CI VI 0 0 °' W H V V-, 6R 01,71 64 0 0 04 GS O e4 $44 04 l„ .rr.,...,,r raM.r rx.. ,. <.. s..'x._,,.;u vx .,-.. .i..w,y .,. . .axe r.«..x,: x+ ,.. � n.�r..,., �.- ,, .. •.� CONTRACT : Country Aire Drive Sidewalk Project (Community Development Block Grant Program) LOCATION : City Hall Council Chambers DATE: January 25,_2005 at 2:00 pm APPROX UNIT I QTY. O b N -+ M 00 N.—+ tz (.4, W W Q U) UivAwa F Four inch thick concrete sidewalk Reconstruct existing driveway Sidewalk Pedestrian Ramn TOTAL BASE BID (Items 1 thru 4) H 0 ' 0 U RS F 4t I_]Nlen �..uttt1f) COUNTRY IRE DI +i`ii�iii SID ALKS �O�II� �Ullllnl11 il 11111�El �•�*♦♦�+'�-. �i ''• ii�iy�� �i J1inIW iinilln '�� 1'i488 -4; '• +t1111i0 �1•�jrG�.mm�u+' 1111, a►f ►0.1 AI II ►f:41;811vnn► ►►rai►fffua . lir 'lest. ♦ ♦\O Amm em;:‚Ir. Ifnf/t�1\nffnf 1rat$■ ffififififftmi { G mu`�` ��� ♦� .IC ■ num mina ufvs�o�`•�ti�0i 11111111111111t1i1. lllllltRlil+l ��!�I�IIp►� nii{{{II{11D� �tl \�,n11n11/ItlR�d�u- 1I1t/��n tt1/4; � • 1 /1F, n i■ ■■,i ii �� Nttt ♦ ,�.. ■ ■ ■ .■ :::g Bang tov :9�� m. rows X11 �:: '.� fIII!'4 4 otvyp��O�� K M MPS mtt��iDtttttttttt ♦�'►�haw� f� t ns ..Via E pnni��•p�p��p�� SIM w lefts COUNTRY AIRE DRIVE SIDEWALKS OVERALL PROJECT PLAN DATE: February 4, 2005 SUBJECT: City Council Meeting - February 10, 2005 ITEM: 12.A.1. Consider a resolution authorizing the Mayor to execute a contract with Manly Contracting for the construction of the Country Aire Drive Sidewalk Project (CDGB Program). Department: Engineering & Development Services Staff Person: Tom Word, Chief of Public Works Operations Justification: On January 25, 2005 we received 6 bids for the Country Aire Drive Sidewalk Project (Community Development Block Grant Program) and the low bid of $45,536.00 was from Manley Contracting. Based upon the review of the bids staff recommends awarding the bid to Manley Contracting in the amount of $45,536.00. The project will provide a continuous pedestrian route along Country Aire Drive, completing a portion of the Overall Citywide Sidewalk Plan. Funding: Cost: $45,536.00 Source of funds: Community Development Block Grant Outside Resources: N/A Background Information: This project will build approximately 1,650 Lf. of sidewalks along the north side of Country Aire Drive, providing a continuous pedestrian route. This will complete a portion of the Overall Citywide Sidewalk Plan. Public Comment: N/A