Loading...
R-05-02-10-12C3 - 2/10/2005RESOLUTION NO. R -05-02-10-12C3 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Corrosion Eliminators, Inc. for the 2002- 2003 Water Storage Tank(s) Rehabilitation Project (Proposals A and C), and WHEREAS, the Council has determined that it is necessary to make changes .to the plans or specifications of the Contract due to unforeseen circumstances, and to close out the contract, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 3, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 3 to the Contract with Corrosion Eliminators, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby findsand declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 10th day of February, Q CHRISTINE R. MARTINEZ, City Sec @PFDOSktoODMA/WORLDOX/O:JWDOX/RESOLUTI/R50210C3.WPD/sc NYLELL, ' . or City .f Round ock, Texas etary CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Public Works PROJECT: 2002-2003 Water Storage Tank Rehabilitation ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $ 717,361.00 $ 4,484.04 $ (192,681.00) Three CHANGE DATA PAGE 1 OF 1 DATE: CHANGE ORDER NO: 1/12/05 3 JUSTIFICATION: To adjust the contract sum to date as a result of the termination on the remainder of the contract. ITEM # DESCRIPTION OF CHANGES UNIT UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 1 Termination of the S.E. Tank portion of Proposal C. L.S. 1 $(192,681.00) $ (192,681.00) PREPARED BY: ENGINEER Corrosion Eliminator, Inc. 1- /,/-- DATE ,/-DATE j- /2 O 3 CONTRACTOR „:,,__ ..,..„,„. President/CEO APPROVED: TOTAL: ($192,681.00) 0 PERCENT OF ORGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER: TOTAL % CHANGE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: -26.86% 0.95% -25.91% $529,164.04 CITY OF ROUND ROCK DATE 1._ —" Ionstco2/forms6/Ik S/GRAPHICS/ENGINEERING/TANK REHAB PROD DATE: February 4, 2005 SUBJECT: City Council Meeting - February 10, 2005 ITEM: 12.C.3. Consider a resolution authorizing the Mayor to execute a Change Order No. 3 with Corrosion Eliminators, Inc. for the 2002-2003 Water Storage Tank(s) Rehabilitation Project (Proposals A and C). Department: Water and Wastewater Utilities Staff Person: Tom Clark, Director of Utilities Justification: This resolution for Change Order No. 3 will remove the Southeast Ground Tank Rehabilitation from the "2002-2003 Water Storage Tank(s) Rehabilitation - Proposal A & C", contract with Corrosion Eliminator, Inc. This will reduce the contract amount by $192,681.00 or 25.91%. With this the City is terminating the Contract under Article 11.02 - Termination for Convenience, of the General Conditions of Agreement. Funding: Cost: ($192,681.00) Source of funds: Utility Capital Construction Funds Outside Resources: John H. Konzen Background Information: The City has made several attempts to isolate the Southeast Ground Storage Tank (SE GST) and Pump Station. However, none of the schemes attempted will allow us to isolate said tank and pump station without creating undue risks to the areas served by the Southeast Ground Storage Tank. The City will not be able to isolate the SE GST until the East Water Transmission Line, Phase 3A-1 and 3A-2 located in Redbud Lane, are in service, which is scheduled to be around August 2005. The tank will be included in a future rehabilitation project for repairs. Public Comment: N/A CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Public Works PROJECT: 2002-2003 Water Storage Tank Rehabilitation ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $ 717,361.00 $ 4,484.04 $ (192,681.00) Three PAGE 1 OF 1 DATE: CHANGE ORDER NO: 1/12/05 3 JUSTIFICATION: To adjust the contract sum to date as a result of the termination on the remainder of the contract. PREPARED BY: ENGINEER Corrosion Eliminator, Inc. 1- 03 - DATE TITLE: / CONTRACTOR President/CEO APPROVED: CITY OF OUND ROCK 2-O-0.5 DATE PERCENT OF ORGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER: TOTAL % CHANGE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $529,164.04 -26.86% 0.95% -25.91% constco2/forms6/1k UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING T,.4&,,,,,'141,,,4_l4 ITEM # DESCRIPTION OF CHANGES q,,, ,,g., .p , 7sh�k •rt.YAS k,'S>!a= vx`�hw§A -, .'*n ,-. '.8.ry Y ttw.,a:,F�+i:iv -»"+P "S&e'9.v"� k euY u. a^�.h ;w1}1/�'d', 0,'•,,,••%L9_P.@.:.5.••3¢. .9ti ez, $ (192,681.00) 1 Termination of the S.E. Tank portion of Proposal C. L.S. 1 $(192,681.00) TOTAL: ($192,681.00) 0 PREPARED BY: ENGINEER Corrosion Eliminator, Inc. 1- 03 - DATE TITLE: / CONTRACTOR President/CEO APPROVED: CITY OF OUND ROCK 2-O-0.5 DATE PERCENT OF ORGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER: TOTAL % CHANGE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $529,164.04 -26.86% 0.95% -25.91% constco2/forms6/1k