R-05-01-13-10F2 - 1/13/2005RESOLUTION NO. R -05-01-13-10F2
WHEREAS, the City of Round Rock has previously entered into an
Agreement for Engineering Services ("Agreement") with HDR Engineering,
Inc. for the final design of Red Bud Lane from US 79 to CR 123, and
WHEREAS, HDR Engineering, Inc. has submitted Supplemental
Agreement No. 2 to the Agreement to modify the provisions for the scope
of services, and
WHEREAS, the City Council desires to enter into said Supplemental
Agreement No. 2 with HDR Engineering, Inc., Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City Supplemental Agreement No. 2 to the Agreement with
HDR Engineering, Inc., a copy of same being attached hereto as Exhibit
"A" and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended.
RESOLVED this 13th day of January,
WELL, yor
City of Round Rock, Texas
CHRISTINE R. MARTINEZ, City Secre
@PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R50113F2.WPD/sc
STATE OF 'TEXAS
COUNTY OF WILLIAMSON
§
§
SUPPLEMENTAL AGREEMENT NO. 2
TO AGREEMENT FOR ENGINEERING SERVICES
FIRM: HDR Engineering, Inc. ("Engineer")
ADDRESS: 4401 Westgate Blvd., Suite 400, Austin, Texas 78745
PROJECT: Red Bud Lane (CR 122) from US 79 to CR 123
This Supplemental Agreement No. 2 to Agreement for Engineering Services is made by and
between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering,
Inc., hereinafter called the "Engineer".
WHEREAS, the City and Engineer executed an Agreement for Engineering Services,
hereinafter called the "Agreement", on the 22nd day of January, 2004 for Red Bud Lane (CR
122) from US 79 to CR 123, for the sum of $249,363.00; and
WHEREAS, on the 14th day of October, 2004, the City and Engineer executed Supplemental
Agreement No. 1 to amend the Agreement to modify the provisions for the scope of services, to
increase the compensation by $41,255.00 to a total of $290,618.00, and to modify the provision
for notices to proceed; and
WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the
scope of services, to increase the compensation by $21,872.00 to a total of $312,490.00; and
NOW THEREFORE, premises considered, the City and the Engineer agree that said
Agreement is amended as follows:
I.
Article 2, Scope Of Services To Be Performed. By Engineer and Exhibit B, Services To Be
Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit
B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To
Exhibit C.
II.
Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by
$21,872.00 the lump sum amount payable under the Agreement for a total of $312,490.00, as
shown by the attached Addendum to Exhibit D.
Supplemental Agreement
HDR-redbudln#3; #78684
1
EXHIBIT
,HAIR
Rev.03/02/04
64836
IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental
Agreement in duplicate.
HDR ENGINEERING, INC.
By:
cfr
Date
CITY OF ROUND ROCK
By:
Nyle Maxwell, Mayor
Date
Supplemental Agreement
HDR-redbudln#3; #78684
APPROVED AS TO FORM:
Stephan L. Sheets, City Attorney
Rev.03102/04
64836
ADDENDUM TO EXHIBIT B
Engineering Services
The changes to the scope of this project are as follows:
The work to be performed under this supplemental agreement shall consist of providing the
following items/information along CR 122 from CR 123 to South of Pioneer Crossing Lane:
HDR Engineering, Inc.
Revise Bridge plans to completely replace the existing CR 122 Bridge over Brushy Creek with a
single structure.
• Revise Bridge Layout, RDS, and Bridge Geometry
• Develop Bridge Construction Phasing
• Estimated Quantities and Brg Seat Elev. Sht
• Abutment Nos. 1 Design & Details
• Abutment Nos. 5 Details
• Interior Bent Nos. 2 - 4 Bent Design & Details
• Column Design
• Superstructure Unit No. 1 Design and Details
• Quality Control/Assurance
• Revise Bridge H&H
ADDENDUM TO EXHIBIT C
Work Schedule
The changes to the Work Schedule for this project are as follows:
Januayi _,l February//„_„,„,,,March 2l,,,,,,, ,,,,,(MaY1 ,_,,,,, ,,,,,iJune it July 21 ,,,,, Se ember/ October 11 November 2l January,/,,,,,.„ Februar
11 March2l MeY I„ June 11
ID f1 Task Name Duration Sten Finish W S T M F T S W S T M F T S W i 5 T I M �F T S W S T M1WF T 3 W S T M��F�•T"7 3 W S W S •7 M F T S W,
_.W.._..._...._:.._. ..._...._._.........._..._...__._........................_..1................_..............._..._..._.___........._......_._._�_ I_�....I_.. I......1.........1_.__..5........
7........T..__�..._..S_..t._...�� L ._...L....�5_ ......__T._..._.i_......I__....L._..•_...__(__
+ t City Council Action f i day Thu 1/15/04 Thu 1/15/04:
2 Notice to Proceetl { 1 day, Fri 1/16%04 Fr{1/16%04 - ' -
3 .`Geotechnicaiinveshgation L... 20 days/.,. Mon 1126/04 Fn 2/20%04
Design Meeting with City 1 day Mon 2/9/04 Mon 2!9/04: f
s ROE For Survey ,... 5 days. Mon 2/2/04 Frl 2/8/04
s Field Survey20 days Mon 2/9/04 Fri 3/5/04
1 DTM Prep,Cleanup&submit 5 days: Mon 3/8/04 Fri 3/12/04 4 �
e } Complete Design Survey 1 day Mon 3/15/04 Mon 3!15/04 ?n5
.... ._..., ......, ....
s 'Plan Sheet Setup + f 0 days Mon 2/2104 Fd 2/13/04:
io !H&H Design- j 26 days Wed 2/18/04 Tue 3/16/041; 7
1+ :Develop Geometrics Intersections 15 days _ Mon 3/15/04 Fri 4/2!041 -
Z Develop Geometrics Transitions 1 4 daysMon 4/5/04 Thu 4/8104:
Develop Typical Sections 3 days; Fri 4/9/04 ..Tue 4/13/04 I:..
14 Subma 30/Plans Transitions iday: Wed 4/14/04 Wad 4%14/04; 4n4
15 130/Plan Review 1 10 days Thu 4/15/04 Wed 4/28/04:
1 s :,Develop Bridge Layoutsfi,_ 15 days I ,. Fri 4/8/04 Thu 4/29104,, ..'
17 Preliminary Construction Staging I 20 days Wed 4114/04 Tue 5/1 i/04 : (,,,,g;,9a7.;an;ii •
1e IMeetwl City on C.S. 1day Wed 5!12/04 Wed S/12/04
s Preliminary Traffic Control Layout 15 dayThu 5/13/04 Wed 6/2 04
s 1
2D :Meel w!11PRIi on Crossing I 1 day Thu 5/13/04 Thu 5/13/04': ;
21 :Meet w!TxDOT on US 79 tie-ins �... i day- Thu-6/3/04 Thu 6/3/04:
2z j Develop Roadway Details 10 days Thu 6/3/04 Wed 6116/04
23 ;Storm SiWWGi66F, 10 days j Thu 6/17/04 Wed 6%30/04:
z4 Develop Pavement Marking Plan 20 days Thu 6/3/04 Wed 6/30%04:
25 Develop RR Crossing petails ... 5 days` Thu 8/3104 Wed 6/9%04 -
..._ ,i E
.,,. _ Thu 7!1/04 Wed 7(7/04
zs Develo Erosion Control Plan 5 days .
27 developPoltution Prevention Plan 10 days Thu 7/8/04 Wed 7/21/04: (;
2e Develop Cross Sections 15 day s3 Thu 7/22/04- Wed 8/11104 ( ,.
2s hrehmmary Gonst Cost Estimate - " 10 days- Thu 8/12/04 Wad 8/25/04 - fy
30 :Subma 50/Plans for Review 1 day. Thu 8/26/04 Thu 8/28/04 8/26
31 X50/Plan Review { 90 days 1 Fn 8/27/04 Thu 12/30%04'
3z Coordinate w/Utility Co. � y;1 da Fri 8127/04 Fn 8/27/04
33 1 Coordinate WAR t day! Mon 8/30/04 Mon 8/30/04
s4 iFinal Structural Plans 10 days Fri 12/31/04 Thu 1/13/05 Y I
35 Final P&P Sheets - - 10 days Fri 12/31/04 Thu 1!13/05
as Final Drainage Sheets • 2 days Fri 1114/06: Mon 1117/05
ay Final Constr.&TCP Sheets I 5 days' Tue 1/18/05 Mon 1/24/05
3e Final Detail Sheets - } 8 days Tue 1125/05 Thu 2%9%05(. '
38 Finai Cross Sections 3 days,
- Tue 1/18105 Thu 1/20/05
40 ;Final Summary Sheets 9 days Fri-2/4/05 Wed 2/18/05:
x;
1I Final Pavement Marking Sheets I 5 days� Fri 1/21/05. Thu 1/27/05:.... ; •
a2 .Final RR Xing Sheets 3 days Fri 1/28/05: Tue Z%/05
4s Final Detail Sheets 5 days I Wed 2/2105 Tue 2%8%05 i
4a Final Bridge Detail Sheets 4• 5 tlays} Fri 1/14/05 Thu 1/20/05 (...�
45 1 mnat Traffic Signal Layout ' 5 days Fn 1/28/05 Thu 213!05 j (x 1
46` 1 Bid Document Preparation- 10 days Fri 1/21/05 Thu 2!3/05-: ! (,.;
47 Final Constr.Costs 5 days Fri 2/4/05 Thu 2/10/05 : + .
4e 'Final Plan Revisions 1 10 days' Fri 2/11!05 Thu 2/24/05 L. ..i{y
4s 95%Submittal 1 day[ Fn 2125/05 Fri 2/25105 +
so X95/RewewPenod i0 days. Mon 2/28/05 Frl 3/11/05,
51 ;Address 85%Review Comments 5 days; Mon 3/14/05 Fit 3/18%05
MF .Final Construction Cost Estimate I 4 days Mon 3/21/05 Thu 3/24105! -
53 Final Plan Submittal i... 1 day_ FI 3/25/05 Fn 3/25/05
sa Railroad Agreement 1 195 days - Mon 3/28/05 Fn 12/23/05
ss..... ;Letting ......... ......._.. j_. 1 deyi....Mon 12/28/05 Mon 1?J26%05+ ..... ............ .............. ....... ; ...........................
........ ....... ... .... ..... ......... ...... ... .................. ....
♦3r2s
w......_...... ..................._._................................................._........................................._....._..... ...... ... ........._........_..... . -� j
IPralsol:C1111-P11E-l1-.1 Task 1111,1,.,,,..,/s:.T:.,A{ Progress Summary ^ External Tasks > ` „a',I Deadline
Deis:Weil 12181” Split Milestone + Projecl Summary External Milestone
Page 1
ADDENDUM TO EXHIBIT D
Fee Schedule
The changes to the fee schedule for this project are as follows:
Fee Summary
Project Name CR 122 (Red Bud Lane)
HDR Engineering, Inc.
1-
N 0
0
rn
N
Ci
$1,878 I
$726
$2,798
CO
to
69-
$2,426 I
CO
�
,
o
Ear
1 0 226 I $21,872 I
iC
0.
•N
N
30
38
24
CV
co
26
fications
Steno /
Clerical
CADD
Technician
CV
CV
{V
gyp.
N
CU
I 84
Sr. Design
Technician
O
20
N
(0
R
V
a)
t
i
O
N
pe'T
S
Engineer
in Training
00
r
(0
coCO
rti
I, -
Design
Engineer
<3-
co
RE
co
O�
C0
e
PM / Senio
Engineer
co
O
r
Project
Principal
0
PS&E Preparation
from US 79 to Forest Bluff Dr,
Revise Layout, Revise RDS, and Geometry
Construction Phasing
Estimated Quantities and Brg Seat Elev. Sht
Abutment Nos. 1 Design & Details
Abutment Nos. 5 Details
Interior Bent Nos, 2 - 4 Bent Design & Details
Column Design
Superstructure Unit No. 1 Design and Details
Quality Control/Assurance
Revise H&H
Total Hours and Sheets
N
h
co
N
Total HDR Additional Fee
co
DATE: January 6, 2005
SUBJECT: City Council Meeting - January 13, 2005
ITEM: *10.F.2. Consider a resolution authorizing the Mayor to execute
Supplemental Agreement No. 2 to the Agreement for Engineering
Services with HDR Engineering, Inc. for the final design of Red Bud
Lane from US 79 to CR 123.
Department: Transportation Services
Staff Person: Thomas G. Martin, P. E., Director
Justification:
As part of their Off System Bridge Program, TxDOT has made approximately $350,000
available for the repair of existing bridge over Brushy Creek on CR 122. Originally, as a
part of Phase III of the CR 122 Improvements, a new bridge was to be built for
northbound traffic, while the existing bridge was to remain for use by the southbound
traffic. In light of additional funding from the state for bridge repairs, revising the current
plans to construct a single bridge, incorporating a full arterial roadway section with
sidewalks and median, seemed prudent.
Funding:
Cost: $21,872.00
Source of funds: 4B Corporation (1/2 cent Sales Tax)Self-Financed Utility Fund
Outside Resources: HDR Engineering, Inc.
Background Information:
This revised design will include revised bridge layout, and bridge geometry. This work
will also develop bridge construction phasing, provide estimated quantities, abutment
details, interior bent design and details, column design, superstructure design and details
as well as quality control/ assurance.
Public Comment: N/A
STATE OF "TEXAS
COUNTY OF WILLIAMSON
SUPPLEMENTAL AGREEMENT NO. 2
TO AGREEMENT FOR ENGINEERING SERVICES
FIRM: HDR Engineering, Inc. ("Engineer")
ADDRESS: 4401 Westgate Blvd., Suite 400, Austin, Texas 78745
PROJECT: Red Bud Lane (CR 122) from US 79 to CR 123
This Supplemental Agreement No. 2 to Agreement for Engineering Services is made by and
between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering,
Inc., hereinafter called the "Engineer".
WHEREAS, the City and Engineer executed an Agreement for Engineering Services,
hereinafter called the "Agreement", on the 22nd day of January, 2004 for Red Bud Lane (CR
122) from US 79 to CR 123, for the sum of $249,363.00; and
WHEREAS, on the 14th day of October, 2004, the City and Engineer executed Supplemental
Agreement No. 1 to amend the Agreement to modify the provisions for the scope of services, to
increase the compensation by $41,255.00 to a total of $290,618.00, and to modify the provision
for notices to proceed; and
WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the
scope of services, to increase the compensation by $21,872.00 to a total of $312,490.00; and
NOW THEREFORE, premises considered, the City and the Engineer agree that said
Agreement is amended as follows:
1.
Article 2, Scope Of Services To Be Performed By Engineer and Exhibit B, Services To Be
Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit
B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To
Exhibit C.
IL
Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by
$21,872.00 the lump sum amount payable under the Agreement for a total of $312,490.00, as
shown by the attached Addendum to Exhibit D.
Supplemental Agreement
HDR-redbudin#3; #78684
R -05 -0 1 -13 -JOEL
1
Rev.03/02/04
64836
IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental
Agreement in duplicate.
HDR ENGINEEG, INC.
By:
.24*tes K. (ice ) /4. , P
Date
CITY OF
By:
axwell,
1-13 _05
Date
Supplemental Agreement
HDR-redbudln#3; #78684
OVED AS 0 FORM:
Step
n L. Sheets, City Attorney
Rev.03/02/04
64836
ADDENDUM TO EXHIBIT B
Engineering Services
The changes to the scope of this project are as follows:
The work to be performed under this supplemental agreement shall consist of providing the
following items/information along CR 122 from CR 123 to South of Pioneer Crossing Lane:
HDR Engineering, Inc.
Revise Bridge plans to completely replace the existing CR 122 Bridge over Brushy Creek with a
single structure.
• Revise Bridge Layout, RDS, and Bridge Geometry
• Develop Bridge Construction Phasing
• Estimated Quantities and Brg Seat Elev. Sht
• Abutment Nos. 1 Design & Details
• Abutment Nos. 5 Details
• Interior Bent Nos. 2 - 4 Bent Design & Details
• Column Design
• Superstructure Unit No. 1 Design and Details
• Quality Control/Assurance
• Revise Bridge H&H
ADDENDUM TO EXHIBIT C
Work Schedule
The changes to the Work Schedule for this project are as follows:
isetembari October 11 November 21 Januar 1 February 11 '.March 2l Ma 1 Junatt
yJanuar , �i, XI. ..X...... ...Y r ...1. ..1
......._ .,.._....i,......9a Y x r r
ID i0 Task Nama _ Duration ' Start �. ._Flnsh.........., w S.I..T. M.' F �.T t.5.7_W I_s.1 T_..l_M'..F.A T. s.:_W..l S.i T :..P.A..- F T_I.S W...,.5 1,_T. .N!_...F..I.T
r.S..w..:.s_:..T M. ..F T ...S..i.w. _5 ._F...l T.J W._,._S.I_T .M. F
........
1 (� City Council Action ._ ����� 1 day,� Thu 1/15%04 Thu 1/75/04 i
2 Notice to Proceed i day' Fri t/16%04 Fri 1/16/041 �r-
3 1 Geotechnical Investigation 20 days 1 Mon 1/26/04 Fri 2/20/04 ^� 1.]
< Design Meeting with City 1 day Mon 2/9/04 Mon 219/041 9 -
5 ' -- ROE For Survey 5 days. Mon 2/2104 Fri 2/6/04 j
s --.Field Survey20 days Mon 2/9/04 Fri 3%5/04
y DTM Prep,Cleanup&submit 5 days Mon 3/8/04 Fri 3/12/04. -
e Complete Design Survey.. t day, Mon 3/15/04 Mon 3/15/04! 9n5
Mon 2/2%04 3/04
Plan Sheet Setup 10 tlays Fri 2%1
16 u H&H Design - 20 days] Wed 2/18/04 Tue 3/16/0411
Ti Develop Geometrics-Intersections - 15 days. Mon 3/15/04 Fri 4/2/04 i
1z j Develop Geometrics-Transitions 4 d11.11,ays- Mon 4/5/04 1.Thu 4/8/04'! _
s Develop Typical Sections 3 days' Fri 4/9%04 Tue 4/73/04
14 Submit 30%Plans Transitlons 7 day Wed 4/14/04 Wed 4/14/041 411a
t5
MX.Plan Review 10 days Thu 4/15/04 Wed 4/28/04.
Develop Bridge Layouts 15 days Fn 4/9/04 Thu 4/29/04 ! p
17 - Preliminary Construction Staging 20 days' Wed 4/14/04 Tue 5/11/041
Meet w/City on C.S. 1 day. Wed 5/12/04 Wed 5/12/041
19 Preliminary Traffic Control Layout 15 days; Thu 5/13/04 Wed 6/2/04
zo1 Meet w/UPRR on Crossing 1 day Thu 5/13!04 Thu 5/13/04
zt Meet w/TxDOT on U5 79tie-ins 1 day Thu 6/3/04 Thu 6/3/04Develop 1 ,
Storm S Woad Roadway Details 10--- 10 days i Thu 6Thu 1/7/04 Wed 6/30/04
zs
za - Develop Pavement Marking Plan 20 days' Thu 6/3/04 Wed 6/30/04 —
25 Develop RR Crossing Details 5 days Thu 6/3/04 Wed 6/9/04 ..3 --
2e Develop Erosion Control Plan 5 days Thu 7/7/04 Wed 7/7/04
2y Develop Pollution Prevention Plan 10 days; Thu 7/8/04 Wed 7/21/04 i
28 Develop Cross Sections 15 days; Thu 7/22/04 Wed 8/11/04 -
zs 1 Preliminary Const Cost Estimate .._._.�....10 days 1 Thu 8/12%04 Wed 8/25/04.
... 8/26
se Submit 6N.Plans for Review .day'.
Thu 8/26/04 Thu 8/26/04; : ;
i
s1 50%Plan Review - < 90 days Fn 8/27%04 Thu 12/30/04;_ 1' < _I t4
3z Coordinate w/Utility Co, ......i 1 day. Fri 8/27/04 Fri 8/27/641 L
s3 - Coordinate w/RR 1 day, Mon 8/30/04 Mon 8/30/04
34 1
Final Structural Plans 10 days. Fri 12/31/04 Thu 1/13/05 -
t I.
35 Final P&P Sheets - 10 days Fri 12/37%04 Thu 1/13/05.
as Final Drainage Sheets 2 days Fri 1/14/05 Mon 1/17/05
37_,1 Final Constr.&TCP Sheets 5 days; Tue 1/18/05 Mon 1/241051
38 I Final Detail Sheets 8 days Tons 1/25%05 Thu 2/3/013'', -
ss Final Cross Sections 3 days Tue 1/18/05 Thu 11201051 y,
ao Final Summary Sheets 9 days Fri 2/4/05 Wed 2/16/05
a1 Final Pavement Marking Sheets 5 days Fn 1/21/05 Thu 1/27/051
az -- Final RR X-Ing Sheets 3 days Fri 1/28/05 Tue 2/1/05 J."
Final Detail Sheets 5 days- Wed 2/2/05 Tue V8/05'i ��
a4 Final Bridge Detail Sheets 5 days Fri 1/14/05 Thu 1/20/05 _ --�
45��'Final Traffic Signal Layout 5 days; Fri 7/28/05 Thu 2/3/05;
asT"� Bid Document Preparation 10 days Fri 1/21/05 Thu 2/3/05.
47 � Final Constr.Costs - 5 days; Fri 2/4/05 Thu 2/70/05
48 Final Plan Revisions 16 days Fri 2/11/05 Thu 2/24/05;
....
:i I 95/Submittal 1 day Fri 2/25%05 Fri 2%25/05 _t 1
5o 95%Review Period 10 days1 Mon 2/28/05 Fri 3%11/05
51 Address 95%Review Comments 5 days Mon 3/14%05 Fn$/18/05 >or
52 Final Construction Cost Estimate 4 days;, Mon 3/21/05 Thu 3/24/05
II! 58 _ Final Plan Submittal - 1 day';, Fri 3/25/05 Fri 3/25/05{ _i
5a Railroad Agreement 195 days. Mon 3128/05 Fri 12%23/05 j -----�- —
day Mon 12/28/05 Mon 12/26/051. ...... .._.._....._ __......_..._ -.. ................__.. ._._....__T ......... _....... ......___ .........
........................:..__..................................................._...._.............................;.._....................__..._...._.__..._.........._.__.....
.....................................__ ...........................................` _ ....._.._..._......... ...........__._' ....... __`
j
I r
Project:CR122-P58E-12,&Oa Task liV Progress summary External TaskstM i�PEME'1 Deadline
Date:Wed 1V8104 5piit Milestone ♦ Project Summary External Milestone
Pagel
ADDENDUM TO EXHIBIT D
Fee Schedule
The changes to the fee schedule for this project are as follows:
Fee Summary
Project Name CR 122 (Red Bud Lane)
HDR Engineering, Inc.
/
\
CO0
Q
/
_
$1,878 I
$726
CO
N.
_
m
CO
N.
/
_
CO
\
_
$3,826
$1,244
$2,540
1 0 I 226 $21,872 I
/
\
E
m
2
R
38
24
42
®
\
Hours for the Classifications
Steno /
Clerical
CADD
Technician
/
2
I 84
Sr. Design
Technician
Engineer
in Training
0
2
3
-1---
I 72
Design
Engineer
\CD
a
c
PM / Senior
Engineer
|
c
m
�
Project
Principal
0
PS&E Preparation
from US 79 to Forest Bluff Dr.
Revise Layout, Revise RDS, and Geometry
Construction Phasing
Estimated Quantities and Brg Seat Elev. Sht
Abutment Nos. 1 Design & Details
Abutment Nos. 5 Details
Interior Bent Nos. 2 - 4 Bent Design & Details
Column Design
Superstructure Unit No. 1 Design and Details
Quality Control/Assurance
Revise H&H
Total Hours and Sheets
Total HDR Additional Fee