R-05-01-13-10F3 - 1/13/2005RESOLUTION NO. R -05-01-13-10F3 WHEREAS, the City of Round Rock has previously entered into an Agreement for Engineering Services ("Agreement") with HDR Engineering, Inc. for IH -35 modifications from Chandler Road to Westinghouse Road, and WHEREAS, HDR Engineering, Inc. has submitted Supplemental Agreement No. 1 to the Agreement to modify the provisions for the scope of services, and WHEREAS, the .City Council desires to enter into said Supplemental Agreement No. 1 with HDR Engineering, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 1 to the Agreement with HDR Engineering, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter Government Code, as amended. RESOLVED this 13th day of January, ATTES 551, Texas NY jW EL , Mayor City of Round Rock, Texas CHRISTINE R. MARTINEZ, City Secretary @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/R50113F3.WPD/SC STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES FIRM: HDR Engineering, Inc. ("Engineer") ADDRESS: 4401 West Gate Blvd., Suite 400, Austin, TX 78745 PROJECT: IH 35 Frontage Road (Chandler Road to Westinghouse) This Supplemental Agreement No. 1 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc., hereinafter called the `Engineer" in the amount of $836,329.00. WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinafter called the "Agreement", on the 11 th day of March, 2004 for the IH -35 Frontage Road (Chandler Road to Westinghouse); and WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services and to modify the compensation; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scope Of Services To Be Performed By Engineer and Exhibit B, Services To Be Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $418,431.00 the lump sum amount payable under the Agreement for a total of $1,254,760 as shown by the attached Addendum to Exhibit D. Supplemental Agreement HDR-IH35Frontage;79186 EXHIBIT 1 Rev.03/02/04 64836 IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. HDR ENGINEERING, INC. By: Date CITY OF ROUND ROCK APPROVED AS TO FORM: By: Nyle Maxwell, Mayor Stephan L. Sheets, City Attorney Date Supplemental Agreement HDR-IH35Frontage;79186 2 Rev.03/02/04 64836 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: The work to be performed under this supplement shall consist of completing the following items/information between Chandler Rd. and Westinghouse Rd. along IH 35 and to the east and west of the existing Chandler Road bridge: 1) Schematic Design will be revised to include the Westinghouse Road turn -around bridge and associated frontage road improvements, maintaining a third lane on the north bound frontage road extending to Westinghouse Road, widening the existing Chandler Road bridge to facilitate an additional lane, widening the east approach on Chandler Road to facilitate the widened bridge section and improving the section of FM 1431 (Chandler Road) to the west of the existing bridge to include an additional lane, a right turn lane onto the south bound frontage road and an acceleration lane from the south bound frontage road going westbound on FM 1431(Chandler Road). Also includes a driveway connection from the existing rest area on IH 35 south of Chandler Road. This driveway will connect to the existing Northbound frontage road. a) Develop Roadway Design Criteria and revise the Design Summary Report (DSR) as necessary. b) Attend Design Concept Conference c) Schematic Document i) The Schematic will be revised to include the above referenced additional work and the current traffic count work currently being undertaken by TxDOT. d) The Engineer will not be required to provide any railroad exhibits and/or agreements. e) The Engineer will calculate and show horizontal and vertical alignments for all ramps, Turnarounds and frontage Roads; intersecting highways and minor cross streets. Roadway geometry will be based on the criteria and requirements set forth in TxDOT Design Manual. i) Design speed (1) Ramps: 45 mph (2) Main lanes 70 mph (3) Frontage Roads: 45 mph (4) Chandler Road: 45 mph (5) Cross Streets consistent with long range plans for cross street facilities. ii) The horizontal alignments will show bearings in the tangent sections and curve data including delta angles, PI stations, tangent lengths, length of curve, and radii. The plan views will show the centerline, edge of pavement, striping, lane widths, shoulder widths, cross slopes, superelevations with transitions, direction of traffic flow, and layouts for all speed change lanes. iii) The vertical alignment will show existing and proposed elevations at 100 -foot intervals, vertical curve VPI stations, curve lengths, superelevation rates and transitions, design speeds, "K" values (evaluation modification required to bridge deck elevations to obtain minimum "K" values), iv) The Planning Document will be prepared in English units with the MicroStation J and GEOPAK 2000. f) The Engineer will show typical sections consistent with TIA and program documents completed in previous stage. g) The Engineer will prepare the Planning Document on roll not to exceed 10 feet in length. The rolls will include plan and profile to a scale of 1 inch=100 feet horizontal and 1 inch=l0 feet vertical. h) Engineer will determine the locations of Major guide signs and pavement markings in compliance with Texas Manual for Uniform Traffic Control Devices (TMUTCD). Guide signs will be included on the Planning Document. i) The Engineer will determine in coordination with CoRR the limits of construction projects if multiple projects would enable facilities that provide interim use. j) The Engineer shall provide one Mylar copy and one paper copy of the plans. i) Right of Way lines and Control of Access lines (if any) (1) The existing apparent ROW limits and abutting parcel plats with legal description and physical address (2) Proposed revised ROW limits including measurements of taking. ii) Geometric typical sections (including pavement cross slopes, lane and shoulder widths, and slope rates for cuts and fills) for proposed main alignment roadways. iii) Current and projected traffic volumes as developed and provided by TxDOT will be shown on the plans (existing, 20-year, and 30-year traffic projections, unless determined otherwise by the CoRR). iv) Major Guide signs v) Geometry of speed change (acceleration, deceleration, tuming, etc.) lanes vi) Existing Utility locations will be shown in plan emphasizing those, which are in conflict with the proposed construction. The overall design developed should minimize the need for utility adjustments. Proposed utilities will not be shown. vii)Any encroachments into ROW, including all trees greater than 6" in caliper, signs, fences and other physical objects viii) Significant drainage structures (existing and proposed) as determined by Hydrologic and Hydraulic report. ix) Updated preliminary construction cost estimate based on the Planning Document design. This estimate will not include projected preliminary ROW and utility relocation costs. k) Schematics will be developed and submitted at the following milestones: i) Prelimary Schematic, two copies, for review by CoRR. ii) Draft Final Schematic, three copies each, for CoRR, TxDOT, and FHWA review. iii) Final Planning Document, three copies each, CoRR, TxDOT, and FHWA. 2) Prepare Categorical Exclusion Document to incorporate improvements from both original contract and supplement #1. a) The Engineer will assist in the preparation and facilitation of one public meeting to be held on the project. The CoRR will be responsible for advertisement of the meeting and provide a place to hold the meeting. The Engineer will provide the meeting notice to the CoRR and will develop documentation of the meeting. 3) Right-of-Way: a) Identify areas where temporary construction/driveway easements or agreements may be required. b) Engineer will supply Exhibits and driveway penetration agreements with adjacent property owners if required. c) Prepare parcel descriptions and layouts for the proposed ROW takings. It is estimated there will be 5 or less takings for this projects. If additional parcels are needed they may be added by supplemental agreement. 4) Utility Coordination: a) Identify existing utility locations and place utility information on plans. Effort shall include contacting Utility companies and mapping record drawing maps of facilities and conforming that data with actual field data surveyed at the project site. b) Coordination of utility adjustments with assistance from CoRR and TxDOT. Provide technical assistance and meeting exhibits as needed. c) Coordinate and attend utility coordination meetings according to TxDOT Project Development Plan (PDP). Engineer to provide copies of plans and cross sections to the utility companies as required by the (PDP). d) Incorporate resolutions from utility coordination meetings into plans. e) Coordinate with utility companies to determine areas of conflicts. f) Provide an up-to-date table of utility owners on the project with contact names, addresses, and phone numbers. g) A SUE is not likely to be needed on this project, but if required may be added by supplemental agreement. 5) Develop DTM for development of PS&E. a) The format for the DTM shall be a Microstation 3-D file. The Engineer shall place and review breaklines in the DTM. b) The corridor limits for the DTM are defined as follows: i) Beginning of project is 1000' North of Westinghouse Road. ii) End of project is 2500' South of Chandler Road. iii) Width shall be from the centerline of the roadway to the existing East ROW. (1) Additional width from the centerline of the roadway to the existing West ROW from 800' North of Chandler Road to 1200' South of Chandler Road. (2) Additional width at existing East driveways - 100' beyond ROW and 20' wider than driveway width on both sides (total = driveway + 40') iv) From the exiting Chandler Road bridge to the west for the full width of the ROW a distance of 600 feet. v) From the exiting Chandler Road bridge to the east for the full width of the ROW a distance of 1000 feet. vi) From the northbound IH 35 east edge of shoulder to the west edge of pavement on the northbound frontage road extending through the area of the rest area entrance ramp to IH 35. c) All physical features located within the corridor shall be identified in the DTM. Attention is called to, but not limited to, the following items: i) Drainage (1) Identify all storm sewer components such as inlets, manholes, etc. (a) Provide the general direction of pipe runs in the system. (2) Identify all cross drainage structures by size, length, type, and end treatment. (3) Identify all ditches. (4) Identify all driveway and intersection pipe by size, length, type, and end treatment. (5) For cross drainage structures, provide additional survey sections (100' wide) along the channel at the following locations: (a) 100' Upstream of existing ROW (b) Upstream existing ROW line (c) Upstream end of structure (d) Downstream end of structure (e) Downstream existing ROW line (f) 100' Downstream of existing ROW ii) Bridges (1) Identify all components such as begin and end bridge, approach slabs, columns, abutments, begin and end bridge rail, begin and end MBGF, riprap, sidewalk and curb and gutter, medians and bridge member preliminary sizing. iii) Roadway (1) Identify all components such as centerline, lane lines, edge of pavements, curb and gutter, retaining walls, sidewalks and ADA ramps, riprap, CTB, MBGF, etc. (2) Provide a table of driveway and intersections to include type (residential or commercial), type of material (asphalt or concrete), radii, width, length, pipe (size, type, length, and SET). (3) Provide a table of benchmarks to include point name, type (iron rod, monument, etc.), station, offset, x, y, and, z. (4) Identify the existing ROW. Also identify abutting parcel property lines, plat information, and owners name and address. iv) Geotechnical (1) Locate all soil borings for bridges and retaining walls once they are completed. v) Miscellaneous (1) identify all existing large and small signs and object markers. Provide a table of existing signs to include station, offset, size, sign wording, etc. (2) Identify all existing striping including centerlines, lane lines, stop lines, words, arrows, etc. (3) Identify all components of existing signalized intersections such as poles, controller box and pad, loops, conduit runs, ground boxes, etc. (4) Identify all components of existing illumination such as poles, ground boxes, conduit runs, etc. (5) Identify all encroachments into the existing ROW such as all trees greater than 6" in caliper, signs, fences, and other physical objects. 6) Roadway Design a) Prepare Typical Section including supporting documentation for submittal. (Submittal will include Location Map, Form 1002 & typical sections on 8 1/2" x 11" plan sheets) The typical section shall also reflect proposed geometric including pavement cross slopes, lane and shoulder widths. b) Refine Horizontal and Vertical Alignment for the following i) IH 35 ii) Northbound and Southbound Frontage Roads iii) Two Turnarounds iv) Northbound exit ramp to Westinghouse v) Northbound entrance ramp from Chandler Westinghouse vi) Bypass frontage road under Chandler Road vii) Chandler Road. c) Develop roadway plan/profile sheets including quantities for the above listed locations. d) Prepare Design Cross Sections and compute earthwork volumes. e) Provide electronic files of original and design cross sections report, completed cross sections, horizontal alignment, vertical alignment and haul plot data (table). Also provide one Mylar roll plot of completed cross sections. f) Establish criteria for construction phasing. g) Prepare plans in English Units. 7) Drainage design a) Gather information regarding existing drainage features, facilities and watersheds from previous plans b) Evaluate existing drainage conditions. c) Develop Preliminary drainage area maps and discharge rates. d) Prepare preliminary Hydraulics report. e) Hydraulic computations. i) Culverts ii) Channels iii) Storm sewers/inlets f) Layout, design and detailing of drainage features. i) Culverts ii) Storm sewers g) Summary of quantities. h) Develop Storm Water Pollution Prevention Plan (SW3P) for each phase of construction including narrative and SW3P controls including but not limited to temp. Sed. control fence, construction exits, detention ponds, rock berms, etc. i) Working in conjunction with TxDOT, develop the Water Pollution Abatement Plan (WPAP) for the project as defined in the original scope and this supplement. j) Temporary storm drainage calculations and design. This work will include the use of any hydrologic or hydraulics computer programs which may be required, such as Texas Hydraulic System (THYSYS), Federal Highway Administration Hydraulic Engineering Circulars and other TxDOT Hydraulic Section publications. 8) Signing, Markings And Signaiization a) Prepare Signing, Pavement Markings, and Object Marker plan sheets to a 1"=100' horizontal scale (same scale as plan and profile sheets). b) Prepare Summaries for Small and Large Signs, Pavement Marking, and Object Markers. Summaries shall be separate from the plan sheets and be broken down by TxDOT bid items and sheet totals. c) Provide signing, pavement markings, and object marker standards and special signing, pavement marking, and object marker details as necessary. d) Prepare Traffic signal plans sheets to 1 "=100' horizontal scale (same as plan and profile sheets). Prepare summary for traffic signal items. Summaries shall be separate from the plan sheets and be broken down by TxDOT bid items and sheet totals. Provide traffic signal details and traffic signal standards for Westinghouse Road and at Chandler Rd and the Northbound Frontage road. e) Prepare temporary traffic signal layouts consistent with TCP at Chandler Road. f) Provide electronic files for development of ITS plans by TxDOT (if required). Coordinate and incorporate plans, general notes, estimates, special specifications and provisions into 95% and 100% submittal 9) Miscellaneous (Roadway) a) Prepare and submit an Interchange Access Justification Report (IAJR) to TxDOT. This scope would include any modifications necessary based on comments from either TxDOT or FHWA that are associated with the outlined scope of services but would not include modifications based upon a change in scope of the proposed improvements. b) Develop miscellaneous roadway details. c) Prepare Illumination plan sheets to a 1"=100' horizontal scale (same scale as plan and profile sheets) for safety lighting at approximately 5 separate locations plus the possibility of lighting under the proposed turnaround bridge. Prepare summary for illumination items. Summaries shall be separate from the plan sheets and be broken down by TxDOT bid items and sheet totals. Provide illumination details and illumination standards. d) Prepare retaining wall layouts including summaries, details and standards. e) Prepare temporary special shoring layouts including summaries. f) Perform soil core hole drilling for retaining walls (see geotechnical investigations for details) g) Develop driveway details & summaries. h) Formulate and prepare traffic control plan, detours and sequence of work narrative. That provides for the following minimum conditions: i) Maintains 3 lanes of traffic on IH 35 at all times ii) Maintain 1 lane of traffic in each direction on Chandler Road iii) One lane of traffic on the Northbound and Southbound frontage road. iv) Coordination of utilities that are to be joint bid. i) Calculate quantities and prepare summary sheets. j) Prepare construction estimate using Estimator Software. The list of bid items will be included in the estimate. Prepare construction time estimate (CPM schedule) with Primavera or other scheduling software. Prepare special specifications for non-standard items, if required. k) Prepare general notes, list of special provisions and list of standard details to be used. 1) Prepare list of right-of-way encroachments if needed. m) Prepare plans for project milestones. All submittal listed below will go through CoRR with two additional copies provided at each submittal. Two reproducible paper copies (11°x17") schematics shall be submitted to the TxDOT for review. Two reproducible paper (11" x 17") copies of the plans shall be submitted to the TxDOT Contract Management Office at the 30% (including bridge and retaining layouts), and 60%, 90% and final design completion stages (not including bridges). The Project Manager will attend Review meetings for these milestones and make necessary revisions to the plans. After the Contract Management Office review of the 95% plans, three reproducible paper copy (11" x 17") of the final plans, along with the supporting PS&E documents will be submitted to the TxDOT Contract Management Office for further processing at the District level. A review meeting should not be necessary, however, the Engineer shall make minor plan revisions as requested by the District Office. Upon completion of the District review of the plans, the Engineer shall furnish signed original Mylar (11" x 17") drawings, which shall include all applicable standards. Electronic Microstation DGN files including cross sections shall be submitted to TxDOT upon final approval of the PS&E. n) The Engineer shall coordinate with TxDOT, local municipal agencies, utility companies and Sub - consultants as needed. 10) Bridge Layouts and Design for Chandler Rd widening, NB to SB Tumaround bridge at Westinghouse Rd a) Prepare Preliminary and Final Bridge Layouts. b) Prepare Bridge cost estimates based on quantities. c) Develop structural details for the bridge widening at Chandler Rd for PS&E. d) Develop structural details for the SB Tumaround Bridge at Westinghouse Rd for PS&E. e) The SB to NB Turnaround Bridge at Chandler Rd shall be designed as a prestressed concrete box beam bridge. 11) Geotechnical Investigations Conduct foundation studies including soil core drilling for both bridge and retaining wall structures to include the following: a) Stake borings in the field utilizing tape and right angle measurements and perform utility clearance and provide traffic control b) In accordance with TxDOT Geotechnical guidelines.. Borings are to be drilled as follows: 6 borings 10 feet deep for additional roadway and. 2 borings 80 feet deep at the Westinghouse turn -around bridge abutments. c) Develop a geotechnical report including geotechnical parameters for bridge foundation design and recommendations. d) Develop Pavement Design using "The Flexible Pavement Design Manual for "Flexible Pavement" and the current AASHTO Guide for the Design of Pavement Structures, will be the governing references for this design. (Development of this section shall be in consultation with the District Pavement Engineer.) i) Drill 6 borings for use in pavement design ii) Flexible pavement designs will be analyzed utilizing the FPS program, while rigid pavement designs will be analyzed utilizing the Darwin 3.01 program. All pavement design will be based on subgrade information developed by the Engineer and traffic loading conditions provided by TxDOT. iii) Pavement designs will be produced for the main lane widening, frontage road and ramps. iv) A pavement design report to TxDOT standards will be produced for the design. 12) Construction Phase Services are not part of this contract and will require a supplemental agreement. ADDENDUM TO EXHIBIT C Work Schedule The revised Work Schedule for this project is as follows: IH 35 FRONTAGE RD. FROM CHANDLER RD. TO WESTINGHOUSE RD. :=1 F". 13 8 i 2 4 ifi,..`.._. g.'ga -,— .. 5 OE S O , 2 74 2 -e, sa ,‘, . ,_ ‘,. , Z--. 1. • il ' 1. 141 141 1-,F. o 1 0 l>. Ito i 0 14 ig-' !E3 ro t:9- . : .• i i z• . ....— . c • i i c i o : cr > io :0 ...2 rig i w EF : 0 -, • itu .4., 1.2 E 10 :0 II- , V i 1 1 g 1 15 : Egi. Tit 8 : o ci .0 123 3 3 ig a l'g 171 ii 5 I 1 1 0 i ; 1 g ril t E li 1 i ,.„...., :.: 2 : RI . ..11...C1, . ..I—, CI ILL E 8 :9 8 .,3 1116 I I- 10 cc ;A .._ . : om. iti El Pi 311 h on' U1 1.0 < x E a, 1 S rel3 12 13 23 112 1.E 1.E . : • , ij !I' 15-2 •= 61"i 4. • i-8 i:g 'a 16 1• ,. ,2," It ''' e ]s2 ien 18 i.c4;c3 la It-,, is it; ig I ili, i g IZ .0 r5 11 18 '313, 7,16 75 18 I :2. 1 .121 LI E g 1 E °c: <7, g REI HE 13 rill 1,2 112' ICI Or_cTc5 11 IC 0 CO :ct 11," :El 00 § 1 Date: Tue 12/14/04 ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: Additional Fee Summary Project Name: Fee Calculation - IH 35 Chandler Rd to Westinghouse Rd - Additional Scope Changes & TxDOT Revi: Consultant: HDR Engineering, Inc. Cost Component, Hours Schematic PS&E Bridge Project Total Admin. Hours Project Principal 4 76 70 26 176 Project Manager/Senior Engineer. 22 228 118 120 488 Design Engineer 48 308 276 104 736 Engineer -in -Training 24 236 152 24 436 Sr. Design Technician 16 144 252 4 416 CADD Technician 64 328 240 4 636 Clerical/Steno 0 4 0 16 20 Total Hours 178 1324 1108 298 2908 Cost Component, Dollars Rate Project Principal $236 $943 $17,919 $16,504 $6,130 $41,496 Project Manager/Senior Engineer. $151 $3,322 $34,432 $17,820 $18,122 $73,697 Design Engineer $117 $5,622 $36,072 $32,324 $12,180 $86,197 Engineer -in -Training $86 $2,071 $20,366 $13,117 $2,071 $37,625 Sr. Design Technician $99 $1,578 $14,202 $24,853 $394 $41,028 CADD Technician $77 $4,931 $25,272 $18,492 $308 $49,004 Clerical/Steno $55 $0 $222 $0 $888 $1,110 Labor Dollars $18,467 $148,485 $123,110 $40,094 $330,156 TOTAL EXPENSES W/ 10% markup $32,425 Survey (Inland) Geotech (HVJ) Environmental Document (B&A) Signing,Striping, Illumination (HSA) Total Subconsultant Fees Direct Labor Indirect Costs Direct Costs Profit @12% Total HDR Fees $8,700 $25,150 $7,000 $15,000 $55,850 $107,124 $187,658 $32,425 $35,374 $362,581 TOTAL LUMP SUM FEE $418,431 y-T�r 1 I I \V �Tr Lf, ` IH 35 mrovements Lc) Ct) m DATE: January 6, 2005 SUBJECT: City Council Meeting - January 13, 2005 ITEM: 10.F.3. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 1 to the Agreement for Engineering Services with HDR Engineering, Inc. for IH -35 modifications from Chandler Road to Westinghouse Road. Department: Transportation Services Staff Person: Thomas G. Martin, P. E., Director Justification: TxDOT has requested a scope change in the proposed roadway improvements to better allow for increased traffic volumes anticipated due to the proposed Simon/Chelsea Development in the area of Chandler Road/RM 1431, IH -35, and Westinghouse Road. This increase in scope will allow for the design to include a turnaround structure at Westinghouse Road, widening Chandler Road /RM 1431 overpass to a six -lane structure, and ancillary roadway work to align with the bridge widening. Miscellaneous acceleration and deceleration lane work to improve traffic flow, extending the north bound frontage road to Westinghouse Road and associated intersection improvements. Funding: Cost: $418,431 Source of funds: 4B Corporation (1/2 cent Sales Tax) Outside Resources: HDR Engineering, Inc. Background Information: The original scope of this project included the reversing of the on and off ramps at Chandler Road, construction of a turnaround structure at Chandler Road, widening of the northbound frontage road in the vicinity of the Simon/Chelsea Development and intersection improvements on Chandler Road. The original contract with HDR Engineering for the design of this work was approved by the Council at their March 11, 2004 meeting. Public Comment: N/A STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES FIRM: HDR Engineering, Inc. ("Engineer") ADDRESS: 4401 West Gate Blvd., Suite 400, Austin, TX 78745 PROJECT: IH 35 Frontage Road (Chandler Road to Westinghouse) This Supplemental Agreement No. 1 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinafter called the "Agreement", on the 1 lth day of March, 2004 for the IH -35 Frontage Road (Chandler Road to Westinghouse) in the amount of $836,329.00; and WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services and to modify the compensation; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scope Of Services To Be Performed By Engineer and Exhibit B, Services To Be Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $418,431.00 the lump sum amount payable under the Agreement for a total of $1,254,760 as shown by the attached Addendum to Exhibit D. R -05-01-13-10F3 Supplemental Agreement HDR-IH35Frontage;79186 1 Rev.03/02/04 64836 IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. HDR ENGINEE ' NG, INC. By: Date J4) k (Xe.,) AiQtiuf, Pc l-13-05 Date Supplemental Agreement HDR-IH35Frontage;79186 2 APP VEDASTOFIRM: Steph L. Sheets, City Attorney Rev.03/02/04 64836 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: The work to be performed under this supplement shall consist of completing the following items/information between Chandler Rd. and Westinghouse Rd. along IH 35 and to the east and west of the existing Chandler Road bridge: 1) Schematic Design will be revised to include the Westinghouse Road turn -around bridge and associated frontage road improvements, maintaining a third lane on the north bound frontage road extending to Westinghouse Road, widening the existing Chandler Road bridge to facilitate an additional lane, widening the east approach on Chandler Road to facilitate the widened bridge section and improving the section of FM 1431 (Chandler Road) to the west of the existing bridge to include an additional lane, a right turn lane onto the south bound frontage road and an acceleration lane from the south bound frontage road going westbound on FM 1431(Chandler Road). Also includes a driveway connection from the existing rest area on IH 35 south of Chandler Road. This driveway will connect to the existing Northbound frontage road. a) Develop Roadway Design Criteria and revise the Design Summary Report (DSR) as necessary. b) Attend Design Concept Conference c) Schematic Document i) The Schematic will be revised to include the above referenced additional work and the current traffic count work currently being undertaken by TxDOT. d) The Engineer will not be required to provide any railroad exhibits and/or agreements. e) The Engineer will calculate and show horizontal and vertical alignments for all ramps, Turnarounds and frontage Roads; intersecting highways and minor cross streets. Roadway geometry will be based on the criteria and requirements set forth in TxDOT Design Manual. i) Design speed (1) Ramps: 45 mph (2) Main lanes 70 mph (3) Frontage Roads: 45 mph (4) Chandler Road: 45 mph (5) Cross Streets consistent with long range plans for cross street facilities. ii) The horizontal alignments will show bearings in the tangent sections and curve data including delta angles, PI stations, tangent lengths, length of curve, and radii. The plan views will show the centerline, edge of pavement, striping, lane widths, shoulder widths, cross slopes, superelevations with transitions, direction of traffic flow, and layouts for all speed change lanes. iii) The vertical alignment will show existing and proposed elevations at 100 -foot intervals, vertical curve VPI stations, curve lengths, superelevation rates and transitions, design speeds, "K" values (evaluation modification required to bridge deck elevations to obtain minimum "K" values), iv) The Planning Document will be prepared in English units with the MicroStation J and GEOPAK 2000. f) The Engineer will show typical sections consistent with TCA and program documents completed in previous stage. g) The Engineer will prepare the Planning Document on roll not to exceed 10 feet in length. The rolls will include plan and profile to a scale of 1 inch=100 feet horizontal and 1 inch=10 feet vertical. h) Engineer will determine the locations of Major guide signs and pavement markings in compliance with Texas Manual for Uniform Traffic Control Devices (TMUTCD). Guide signs will be included on the Planning Document. i) The Engineer will determine in coordination with CoRR the limits of construction projects if multiple projects would enable facilities that provide interim use. j) The Engineer shall provide one Mylar copy and one paper copy of the plans. i) Right of Way lines and Control of Access lines (if any) (1) The existing apparent ROW limits and abutting parcel plats with legal description and physical address (2) Proposed revised ROW limits including measurements of taking. ii) Geometric typical sections (including pavement cross slopes, lane and shoulder widths, and slope rates for cuts and fills) for proposed main alignment roadways. iii) Current and projected traffic volumes as developed and provided by TxDOT will be shown on the plans (existing, 20-year, and 30-year traffic projections, unless determined otherwise by the CoRR). iv) Major Guide signs v) Geometry of speed change (acceleration, deceleration, turning, etc.) lanes vi) Existing Utility locations will be shown in plan emphasizing those, which are in conflict with the proposed construction. The overall design developed should minimize the need for utility adjustments. Proposed utilities will not be shown. vii)Any encroachments into ROW, including all trees greater than 6" in caliper, signs, fences and other physical objects viii) Significant drainage structures (existing and proposed) as determined by Hydrologic and Hydraulic report. ix) Updated preliminary construction cost estimate based on the Planning Document design. This estimate will not include projected preliminary ROW and utility relocation costs. k) Schematics will be developed and submitted at the following milestones: i) Prelimary Schematic, two copies, for review by CoRR. ii) Draft Final Schematic, three copies each, for CoRR, TxDOT, and FHWA review. iii) Final Planning Document, three copies each, CoRR, TxDOT, and FHWA. 2) Prepare Categorical Exclusion Document to incorporate improvements from both original contract and supplement #1. a) The Engineer will assist in the preparation and facilitation of one public meeting to be held on the project. The CoRR will be responsible for advertisement of the meeting and provide a place to hold the meeting. The Engineer will provide the meeting notice to the CoRR and will develop documentation of the meeting. 3) Right-of-Way: a) Identify areas where temporary construction/driveway easements or agreements may be required. b) Engineer will supply Exhibits and driveway penetration agreements with adjacent property owners if required. c) Prepare parcel descriptions and layouts for the proposed ROW takings. It is estimated there will be 5 or less takings for this projects. If additional parcels are needed they may be added by supplemental agreement. 4) Utility Coordination: a) Identify existing utility locations and place utility information on plans. Effort shall include contacting Utility companies and mapping record drawing maps of facilities and conforming that data with actual field data surveyed at the project site. b) Coordination of utility adjustments with assistance from CoRR and TxDOT. Provide technical assistance and meeting exhibits as needed. c) Coordinate and attend utility coordination meetings according to TxDOT Project Development Plan (PDP). Engineer to provide copies of plans and cross sections to the utility companies as required by the (PDP). d) Incorporate resolutions from utility coordination meetings into plans. e) Coordinate with utility companies to determine areas of conflicts. f) Provide an up-to-date table of utility owners on the project with contact names, addresses, and phone numbers. g) A SUE is not likely to be needed on this project, but if required may be added by supplemental agreement. 5) Develop DTM for development of PS&E. a) The format for the DTM shall be a Microstation 3-D file. The Engineer shall place and review breaklines in the DTM. b) The corridor limits for the DTM are defined as follows: i) Beginning of project is 1000' North of Westinghouse Road. ii) End of project is 2500' South of Chandler Road. iii) Width shall be from the centerline of the roadway to the existing East ROW. (1) Additional width from the centerline of the roadway to the existing West ROW from 800' North of Chandler Road to 1200' South of Chandler Road. (2) Additional width at existing East driveways - 100' beyond ROW and 20' wider than driveway width on both sides (total = driveway + 40') iv) From the exiting Chandler Road bridge to the west for the full width of the ROW a distance of 600 feet. v) From the exiting Chandler Road bridge to the east for the full width of the ROW a distance of 1000 feet. vi) From the northbound IH 35 east edge of shoulder to the west edge of pavement on the northbound frontage road extending through the area of the rest area entrance ramp to IH 35. c) All physical features located within the corridor shall be identified in the DTM. Attention is called to, but not limited to, the following items: i) Drainage (1) Identify all storm sewer components such as inlets, manholes, etc. (a) Provide the general direction of pipe runs in the system. (2) Identify all cross drainage structures by size, length, type, and end treatment. (3) Identify all ditches. (4) Identify all driveway and intersection pipe by size, length, type, and end treatment. (5) For cross drainage structures, provide additional survey sections (100' wide) along the channel at the following locations: (a) 100' Upstream of existing ROW (b) Upstream existing ROW line (c) Upstream end of structure (d) Downstream end of structure (e) Downstream existing ROW line (f) 100' Downstream of existing ROW ii) Bridges (1) Identify all components such as begin and end bridge, approach slabs, columns, abutments, begin and end bridge rail, begin and end MBGF, riprap, sidewalk and curb and gutter, medians and bridge member preliminary sizing. iii) Roadway (1) Identify all components such as centerline, lane lines, edge of pavements, curb and gutter, retaining walls, sidewalks and ADA ramps, riprap, CTB, MBGF, etc. (2) Provide a table of driveway and intersections to include type (residential or commercial), type of material (asphalt or concrete), radii, width, length, pipe (size, type, length, and SET). (3) Provide a table of benchmarks to include point name, type (iron rod, monument, etc.), station, offset, x, y, and, z. (4) Identify the existing ROW. Also identify abutting parcel property lines, plat information, and owners name and address. iv) Geotechnical (1) Locate all soil borings for bridges and retaining walls once they are completed. v) Miscellaneous (1) Identify all existing large and small signs and object markers. Provide a table of existing signs to include station, offset, size, sign wording, etc. (2) Identify all existing striping including centerlines, lane lines, stop lines, words, arrows, etc. (3) Identify all components of existing signalized intersections such as poles, controller box and pad, loops, conduit runs, ground boxes, etc. (4) Identify all components of existing illumination such as poles, ground boxes, conduit runs, etc. (5) Identify all encroachments into the existing ROW such as all trees greater than 6" in caliper, signs, fences, and other physical objects. 6) Roadway Design a) Prepare Typical Section including supporting documentation for submittal. (Submittal will include Location Map, Form 1002 & typical sections on 8 1/2" x 11" plan sheets) The typical section shall also reflect proposed geometric including pavement cross slopes, lane and shoulder widths. b) Refine Horizontal and Vertical Alignment for the following i) IH 35 ii) Northbound and Southbound Frontage Roads iii) Two Turnarounds iv) Northbound exit ramp to Westinghouse v) Northbound entrance ramp from Chandler Westinghouse vi) Bypass frontage road under Chandler Road vii) Chandler Road. c) Develop roadway plan/profile sheets including quantities for the above listed locations. d) Prepare Design Cross Sections and compute earthwork volumes. e) Provide electronic files of original and design cross sections report, completed cross sections, horizontal alignment, vertical alignment and haul plot data (table). Also provide one Mylar roll plot of completed cross sections. f) Establish criteria for construction phasing. g) Prepare plans in English Units. 7) Drainage design a) Gather information regarding existing drainage features, facilities and watersheds from previous plans b) Evaluate existing drainage conditions. c) Develop Preliminary drainage area maps and discharge rates. d) Prepare preliminary Hydraulics report. e) Hydraulic computations. i) Culverts ii) Channels iii) Storm sewers/inlets f) Layout, design and detailing of drainage features. i) Culverts ii) Storm sewers g) Summary of quantities. h) Develop Storm Water Pollution Prevention Plan (SW3P) for each phase of construction including narrative and SW3P controls including but not limited to temp. Sed. control fence, construction exits, detention ponds, rock berms, etc. i) Working in conjunction with TxDOT, develop the Water Pollution Abatement Plan (WPAP) for the project as defined in the original scope and this supplement. j) Temporary storm drainage calculations and design. This work will include the use of any hydrologic or hydraulics computer programs which may be required, such as Texas Hydraulic System (THYSYS), Federal Highway Administration Hydraulic Engineering Circulars and other TxDOT Hydraulic Section publications. 8) Signing, Markings And Signalization a) Prepare Signing, Pavement Markings, and Object Marker plan sheets to a 1"=100' horizontal scale (same scale as plan and profile sheets). b) Prepare Summaries for Small and Large Signs, Pavement Marking, and Object Markers. Summaries shall be separate from the plan sheets and be broken down by TxDOT bid items and sheet totals. c) Provide signing, pavement markings, and object marker standards and special signing, pavement marking, and object marker details as necessary. d) Prepare Traffic signal plans sheets to 1 "=100' horizontal scale (same as plan and profile sheets). Prepare summary for traffic signal items. Summaries shall be separate from the plan sheets and be broken down by TxDOT bid items and sheet totals. Provide traffic signal details and traffic signal standards for Westinghouse Road and at Chandler Rd and the Northbound Frontage road. e) Prepare temporary traffic signal layouts consistent with TCP at Chandler Road. f) Provide electronic files for development of ITS plans by TxDOT (if required). Coordinate and incorporate plans, general notes, estimates, special specifications and provisions into 95% and 100% submittal 9) Miscellaneous (Roadway) a) Prepare and submit an Interchange Access Justification Report (IAJR) to TxDOT. This scope would include any modifications necessary based on comments from either TxDOT or FHWA that are associated with the outlined scope of services but would not include modifications based upon a change in scope of the proposed improvements. b) Develop miscellaneous roadway details. c) Prepare Illumination plan sheets to a 1"=100' horizontal scale (same scale as plan and profile sheets) for safety lighting at approximately 5 separate locations plus the possibility of lighting under the proposed turnaround bridge. Prepare summary for illumination items. Summaries shall be separate from the plan sheets and be broken down by TxDOT bid items and sheet totals. Provide illumination details and illumination standards. d) Prepare retaining wall layouts including summaries, details and standards. e) Prepare temporary special shoring layouts including summaries. f) Perform soil core hole drilling for retaining walls (see geotechnical investigations for details) g) Develop driveway details & summaries. h) Formulate and prepare traffic control plan, detours and sequence of work narrative. That provides for the following minimum conditions: i) Maintains 3 lanes of traffic on IH 35 at all times ii) Maintain 1 lane of traffic in each direction on Chandler Road iii) One lane of traffic on the Northbound and Southbound frontage road. iv) Coordination of utilities that are to be joint bid. i) Calculate quantities and prepare summary sheets. j) Prepare construction estimate using Estimator Software. The list of bid items will be included in the estimate. Prepare construction time estimate (CPM schedule) with Primavera or other scheduling software. Prepare special specifications for non-standard items, if required. k) Prepare general notes, list of special provisions and list of standard details to be used. 1) Prepare list of right-of-way encroachments if needed. m) Prepare plans for project milestones. All submittal listed below will go through CoRR with two additional copies provided at each submittal. Two reproducible paper copies (11"x17") schematics shall be submitted to the TxDOT for review. Two reproducible paper (11" x 17") copies of the plans shall be submitted to the TxDOT Contract Management Office at the 30% (including bridge and retaining layouts), and 60%, 90% and final design completion stages (not including bridges). The Project Manager will attend Review meetings for these milestones and make necessary revisions to the plans. After the Contract Management Office review of the 95% plans, three reproducible paper copy (11" x 17") of the final plans, along with the supporting PS&E documents will be submitted to the TxDOT Contract Management Office for further processing at the District level. A review meeting should not be necessary, however, the Engineer shall make minor plan revisions as requested by the District Office. Upon completion of the District review of the plans, the Engineer shall furnish signed original Mylar (11" x 17") drawings, which shall include all applicable standards. Electronic Microstation DGN files including cross sections shall be submitted to TxDOT upon final approval of the PS&E. n) The Engineer shall coordinate with TxDOT, local municipal agencies, utility companies and Sub - consultants as needed. 10) Bridge Layouts and Design for Chandler Rd widening, NB to SB Turnaround bridge at Westinghouse Rd a) Prepare Preliminary and Final Bridge Layouts. b) Prepare Bridge cost estimates based on quantities. c) Develop structural details for the bridge widening at Chandler Rd for PS&E. d) Develop structural details for the SB Turnaround Bridge at Westinghouse Rd for PS&E. e) The SB to NB Turnaround Bridge at Chandler Rd shall be designed as a prestressed concrete box beam bridge. 11) Geotechnical Investigations Conduct foundation studies including soil core drilling for both bridge and retaining wall structures to include the following: a) Stake borings in the field utilizing tape and right angle measurements and perform utility clearance and provide traffic control b) In accordance with TxDOT Geotechnical guidelines.. Borings are to be drilled as follows: 6 borings 10 feet deep for additional roadway and. 2 borings 80 feet deep at the Westinghouse turn -around bridge abutments. c) Develop a geotechnical report including geotechnical parameters for bridge foundation design and recommendations. d) Develop Pavement Design using "The Flexible Pavement Design Manual for "Flexible Pavement" and the current AASHTO Guide for the Desiqn of Pavement Structures, will be the governing references for this design. (Development of this section shall be in consultation with the District Pavement Engineer.) i} Drill 6 borings for use in pavement design ii) Flexible pavement designs will be analyzed utilizing the FPS program, while rigid pavement designs will be analyzed utilizing the Darwin 3.01 program. All pavement design will be based on subgrade information developed by the Engineer and traffic loading conditions provided by TxDOT. Pavement designs will be produced for the main lane widening, frontage road and ramps. iv) A pavement design report to TxDOT standards will be produced for the design. 12) Construction Phase Services are not part of this contract and will require a supplemental agreement. ADDENDUM TO EXHIBIT C Work Schedule The revised Work Schedule for this project is as follows: 0 cc w 0 z 1- w 0 F- d cc cc U1 J 0 0 cc ci w 0 1- 0 0 CCa M 110 LI 17 put 24 jJul 3; 5. 0 0 8 8 F �o - - - �R O m O if 0C ;ILO ra aa L. LLt O c N c N N N N - IL O 3 N c I Po F 0 S n n w = E E > - a A C Q Cm 0o m m- t m 0 Gm i m m g. 0 Q O a srit E I=ii _.Q ¢ o N c '� E o_ `a m L�f O 91-8 Q I- it I1 1 z m Roled Up MINI*. .c 5 1 Date: Tue 12/14/04 ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: Additional Fee Summary Project Name: Fee Calculation - IH 35 Chandler Rd to Westinghouse Rd - Additional Scope Changes & TxDOT Revi5 Consultant: HDR Engineering, Inc. Cost Component, Hours Schematic PS&E Bridge Project Total Admin. Hours Project Principal 4 76 70 26 176 Project Manager/Senior Engineer. 22 228 118 120 488 Design Engineer 48 308 276 104 736 Engineer -in -Training 24 236 152 24 436 Sr. Design Technician 16 144 252 4 416 CADD Technician 64 328 240 4 636 Clerical/Steno 0 4 0 16 20 Total Hours 178 1324 1108 298 2908 Cost Component, Dollars Rate Project Principal $236 $943 $17,919 $16,504 $6,130 $41,496 Project Manager/Senior Engineer. $151 $3,322 $34,432 $17,820 $18,122 $73,697 Design Engineer $117 $5,622 $36,072 $32,324 $12,180 $86,197 Engineer -in -Training $86 $2,071 $20,366 $13,117 $2,071 $37,625 Sr. Design Technician $99 $1,578 $14,202 $24,853 $394 $41,028 CADD Technician $77 $4,931 $25,272 $18,492 $308 $49,004 Clerical/Steno $55 $0 $222 $0 $888 $1,110 Labor Dollars $18,467 $148,485 $123,110 $40,094 $330,156 TOTAL EXPENSES W/ 10% markup $32,425 Survey (Inland) Geotech (HVJ) Environmental Document (B&A) Signing,Striping, Illumination (HSA) Total Subconsultant Fees Direct Labor Indirect Costs Direct Costs Profit @12% Total HDR Fees $8,700 $25,150 $7,000 $15,000 $55,850 $107,124 $187,658 $32,425 $35,374 $362,581 TOTAL LUMP SUM FEE $418,431